Skip to content
Deedo home
Menu

Tulsi Pride

Lapsed

Amravati (M Corp.), Amravati 444601 |Promoter: Nitesh Shyam Bundele

15 Feb 2022Registered with MahaRERA
30 Sep 2025Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
390 sq m (4,202 sq ft)
Permissible built-up area
1,226 sq m (13,200 sq ft)
Sanctioned built-up area
1,176 sq m (12,662 sq ft)
Address
Survey No 38/4 of Mouje Shegaon, Mouje Sheagaon, AmravatiPIN 444601
Designated bank account
Yes Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Tulsi Pride is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2025

The latest completion date on record passed 1 year and 1 month ago.

Registered
15 Feb 2022
Promised
30 Sep 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030003327915 Feb 202230 Sep 2025—Nitesh Shyam BundeleProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Tuls Pride6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000023
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Tuls Pride

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER MAP0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER MAP0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER MAP0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER MAP0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

13 documents held by Deedo, 15 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificates

Form b

Others

Allotment letters

Registration certificate

Layout plan

Building plan

Document library

  • Copy of the legal title reportlegal title report.pdf · uploaded 5 Feb 2022View
  • Details of encumbrancesEncumbrance.pdf · uploaded 5 Feb 2022View
  • Copy of Layout Approval (in case of layout)Layout_compressed.pdf · uploaded 5 Feb 2022View
  • Building Plan Approval / NA Order for plotted developmentSantion map (1).pdf · uploaded 5 Feb 2022View
  • Commencement Certificates / NA Order for plotted developmentSanction Letter_compressed.pdf · uploaded 5 Feb 2022View
  • Declaration about Commencement Certificatedeclration about commencement certificate.pdf · uploaded 5 Feb 2022View
  • Declaration in FORM BFORM B.pdf · uploaded 5 Feb 2022View
  • Proforma of Allotment letteragr SALE_Proforma_Tulsi Associates_Tulsi Pride.pdf · uploaded 5 Feb 2022View
  • CERSAI detailsCERSAI_Search_Report_200229578014_For_Asset_Based_Search_05_02_2022_09_27_33_270.pdf · uploaded 5 Feb 2022View
  • Proforma of Allotment letterallotment letter (1).pdf · uploaded 11 Feb 2022View

Promoter documents

  • Legal Title reportlegal title report.pdf · uploaded 5 Feb 2022View
  • Declaration Form BFORM B.pdf · uploaded 5 Feb 2022View

Technical documents

  • Layout ApprovalLayout_compressed.pdfView
  • Building Plan ApprovalSantion map (1).pdfView

Proforma allotment letter

  • Proforma allotment letterallotment letter (1).pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

38/4Survey No 38/4 of Mouje Shegaon

As published on MahaRERA's project page

Survey No 38/4 of Mouje Shegaon

Boundaries

North
Layout Road and
South
service line
East
Layout No 3
West
Layout No5-A

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSM Design Studio—
Chartered accountantJ S Khandelwal & Co—
EngineerSanchit Patil—
OtherRishabh Khandelwal—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology