Swpnashri Apartment

Completed

Amravati (M Corp.), Amravati 444604 |Promoter: Shriram Mahadevrao Nagpurkar

28 Dec 2018Registered with MahaRERA
30 Dec 2022Promised completion
1Building
22Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
Flat, Office, Shop22 units in all
Land area for this project
475 sq m (5,110 sq ft)
Permissible built-up area
850 sq m (9,146 sq ft)
Sanctioned built-up area
800 sq m (8,607 sq ft)
Address
12/3, Shegaon Road, Swapnashri ColonyPIN 444604
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2022

The latest completion date on record passed 3 years and 10 months ago.

Registered
28 Dec 2018
Promised
30 Dec 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030001906428 Dec 201830 Dec 2022—Shriram Mahadevrao NagpurkarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Swapnasri Appartment522

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

22 units registered

Flat · 6 unitsOffice · 9 unitsShop · 7 units
TypeCarpet areaUnits
Flat83.2 sq m · 896 sq ft3
Flat85.42 sq m · 919 sq ft3
Office12.55 sq m · 135 sq ft1
Office13.09 sq m · 141 sq ft3
Office14.32 sq m · 154 sq ft1
Office16.72 sq m · 180 sq ft1
Office17.91 sq m · 193 sq ft1
Office49.56 sq m · 533 sq ft1
Office51.3 sq m · 552 sq ft1
Shop10.6 sq m · 114 sq ft1
Shop11.05 sq m · 119 sq ft3
Shop14.32 sq m · 154 sq ft1
Shop16.72 sq m · 180 sq ft1
Shop18.62 sq m · 200 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Swapnasri Appartment

  • Excavation85%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER MAP0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER MAP0%
  • Storm Water DrainsAS PER MAP0%
  • Landscaping & Tree PlantingAS PER MAP0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER MAP0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

18 documents held by Deedo, 21 filings listed on MahaRERA's project page

Title

Commencement certificate

Form b

Encumbrance

Form 2as

Allotment letters

Form 2

Form 5s

Registration certificate

Completion

Form 4

Others

Layout plan

Building plan

Document library

  • Copy of Layout Approval (in case of layout)layout.pdf · uploaded 22 Dec 2018View
  • Commencement Certificates / NA Order for plotted developmentAMC.pdf · uploaded 22 Dec 2018View
  • Declaration in FORM Bform b - final.pdf · uploaded 22 Dec 2018View
  • Building Plan Approval (IOD)BUILDING PLAN-ilovepdf-compressed.pdf · uploaded 22 Dec 2018View
  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 22 Dec 2018View
  • Details of encumbrancesNON ENCUMBRANCE CERTIFICATE.pdf · uploaded 24 Dec 2018View
  • Proforma of Allotment letterUNDERTAKIN.pdf · uploaded 24 Dec 2018View
  • Form 2Aform 2a shriram_compressed.pdf · uploaded 6 Jun 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)FORM 5.pdf · uploaded 14 Dec 2019View
  • Proforma of Allotment letterRera Agreem -Nagpurkar flat format 2019.pdf · uploaded 14 Dec 2019View
  • Form 2AFORM 2A_compressed.pdf · uploaded 19 Feb 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 19 Feb 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 F.pdf · uploaded 18 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)FORM 5.pdf · uploaded 18 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 16 Oct 2021View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 16 Oct 2021View

Promoter documents

  • Declaration Form Bform b - final.pdf · uploaded 22 Dec 2018View
  • Legal Title reportSEARCH REPORT.pdf · uploaded 22 Dec 2018View

Technical documents

  • Layout Approvallayout.pdfView
  • Building Plan ApprovalBUILDING PLAN-ilovepdf-compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterUNDERTAKIN.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

12/3

As published on MahaRERA's project page

12/3

Boundaries

North
Road
South
Govt Engineering College Compound Wall
East
Road
West
Plot No 2A

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Shailendra Deshmukh—
Chartered accountantCA Girish Borkhade—
Chartered accountantCA Nidhi Agrawal—
EngineerRavindra M Dhule—

Source: MahaRERA project page. Contact details are not shown.