Shri Sai Raghav Enclave

Completed

Amravati (M Corp.), Amravati 444603 |Promoter: Shri Ram Builder

27 Mar 2020Registered with MahaRERA
30 Mar 2025Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
316 sq m (3,404 sq ft)
Permissible built-up area
666 sq m (7,168 sq ft)
Sanctioned built-up area
566 sq m (6,092 sq ft)
Address
84b 85a, Shegaon Rahatgaon Road, MitranganPIN 444603
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Shri Sai Raghav Enclave is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2025

The latest completion date on record passed 1 year and 7 months ago.

Registered
27 Mar 2020
Promised
30 Mar 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030002525427 Mar 202030 Mar 2025—Shri Ram BuilderProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shri Sai Raghav Enclave5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000030

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shri Sai Raghav Enclave

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS REQUIRED100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAS REQUIRED100%
  • Electrical meter room, sub-station, receiving stationAS PER PLAN100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PRE PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

19 documents held by Deedo, 24 filings listed on MahaRERA's project page

Form B (4)

Title report

Encumbrance details

Commencement certificate

Allotment letter (2)

Show all 43 documentsShow fewer documents

Allotment letter (2)

Other (4)

Form 5

Occupancy / completion certificate

  • Occupancy / completion certificate19 Aug 2021ViewSource

Form 4

Registration certificate

Layout plan

Building plan

Document library

  • Copy of the legal title reportpurchase deed shri ram_reduce (1).pdf · uploaded 11 Mar 2020View
  • Copy of Layout Approval (in case of layout)layout plan.pdf · uploaded 11 Mar 2020View
  • Building Plan Approval / NA Order for plotted developmentsantion plan.pdf · uploaded 11 Mar 2020View
  • Commencement Certificates / NA Order for plotted developmentcomments ment.pdf · uploaded 11 Mar 2020View
  • Declaration in FORM BAjay Malode declaration.pdf · uploaded 11 Mar 2020View
  • Declaration in FORM BNilesh mavade Declaration.pdf · uploaded 11 Mar 2020View
  • Declaration in FORM BNirmal bajaj declaration.pdf · uploaded 11 Mar 2020View
  • Declaration in FORM Bujjwal bajaj declartion.pdf · uploaded 11 Mar 2020View
  • Details of encumbrancesCERTIFICATE _compressed.pdf · uploaded 11 Mar 2020View
  • Proforma of Allotment letterNEW Rera Agreement shriram builder_compressed.pdf · uploaded 11 Mar 2020View
  • Proforma of Allotment letterProforma of Allotment Letter.pdf · uploaded 11 Mar 2020View
  • Disclosure of sold/ booked inventoryDISCLOUSER OF SOLD AND BOOKED INVENTORY.pdf · uploaded 19 Aug 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 19 Aug 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)DOD PAN.pdf · uploaded 19 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)ANNUAL REPORT.pdf · uploaded 19 Aug 2021View
  • Architect’s Certificate on Completion of Project (Form 4)ARCHITECTURE CERTIFICATE.pdf · uploaded 23 Aug 2021View

Promoter documents

  • Legal Title reportpurchase deed shri ram_reduce (1).pdf · uploaded 11 Mar 2020View
  • Declaration Form BAjay Malode declaration.pdf · uploaded 11 Mar 2020View
  • Declaration Form BNilesh mavade Declaration.pdf · uploaded 11 Mar 2020View
  • Declaration Form BNirmal bajaj declaration.pdf · uploaded 11 Mar 2020View
  • Declaration Form Bujjwal bajaj declartion.pdf · uploaded 11 Mar 2020View

Technical documents

  • Layout Approvallayout plan.pdfView
  • Building Plan Approvalsantion plan.pdfView

Proforma allotment letter

  • Proforma allotment letterProforma of Allotment Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

84B 85A

As published on MahaRERA's project page

84B 85A

Boundaries

North
Plot No 94a 91b
South
Road
East
Plot No 84a
West
Amalgamated Plot 85b 86a

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAdwait Saurkar—
Chartered accountantabhishek malpani—
EngineerKrishna Gupta—
EngineerPankaj Deshmukh—
OtherNikhil Kalbende—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology