Skip to content
Deedo home
Menu

Shri Pinglai Heights

Completed

Amravati (M Corp.), Amravati 444601 |Promoter: Unnati Infraspace Private Limited

6 Sep 2017Registered with MahaRERA
31 Oct 2018Promised completion
1Building
26Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
Commercial, Residential26 units in all
Land area for this project
511 sq m (5,502 sq ft)
Permissible built-up area
1,431 sq m (15,406 sq ft)
Sanctioned built-up area
716 sq m (7,703 sq ft)
Address
46/2, plot no 1 and plot no 2 Survey no 46PIN 444601
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.96514, 77.75511
Shri Pinglai Heights is at latitude 20.96514, longitude 77.75511.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Oct 2018

The latest completion date on record passed 8 years ago.

Registered
6 Sep 2017
Promised
31 Oct 2018

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P503000126286 Sep 201731 Oct 2018—Unnati Infraspace Private LimitedProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shri Pinglai Heights1026

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

26 units registered

Commercial · 10 unitsResidential · 16 units
TypeCarpet areaUnits
Commercial159.27 sq m · 1,714 sq ft10
Residential945.12 sq m · 10,173 sq ft16

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shri Pinglai Heights

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure65%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBoring20%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Septic Tank0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTree Plantation0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting Tank0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAs per Req0%
  • Electrical meter room, sub-station, receiving stationElectric Meter Room0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 16 filings listed on MahaRERA's project page

Title report

Form 1 (2)

Form 2 (2)

Encumbrance details

Form B

Registration certificate

Show all 30 documentsShow fewer documents

Form 4

Other (2)

Layout plan

Building plan

Allotment letter

Document library

  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer1.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer2.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architech001.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architech003.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)building-min.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)floor-min.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title reportlegal12.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment lettersale deed 1.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesencum.pdf · uploaded 2 Sep 2017View
  • Declaration in FORM B3 new.pdf · uploaded 2 Sep 2017View
  • Architect’s Certificate on Completion of Project (Form 4)SD662.pdf · uploaded 23 Sep 2019View

Promoter documents

  • Legal Title reportlegal12.pdf · uploaded 31 Jul 2017View
  • Declaration Form B3 new.pdf · uploaded 2 Sep 2017View

Technical documents

  • Building Plan Approvalbuilding-min.pdfView
  • Layout Approvalfloor-min.pdfView

Proforma allotment letter

  • Proforma allotment lettersale deed 1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

124646/2plot no 1plot no 2 Survey no 46

As published on MahaRERA's project page

46/2, plot no 1 and plot no 2 Survey no 46

Boundaries

North
Plot no 2
South
Part of survey no 46
East
Amravati to Kathora Main Road
West
Service Lane

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMinal D Sarda—
EngineerAmit Mehare—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology