Samruddhi Heights

Completed

Amravati (M Corp.), Amravati 444606 |Promoter: Samrudhi Housing and Infrastructures

Residential / Group HousingRERAP50300018049
10 Oct 2018Registered with MahaRERA
31 Mar 2019Promised completion
1Building
13Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2 BHK Flate, 2BHK Flate13 units in all
Land area for this project
508 sq m (5,469 sq ft)
Permissible built-up area
964 sq m (10,377 sq ft)
Sanctioned built-up area
757 sq m (8,144 sq ft)
Address
28, Radhikha nagar -B, Mangaldham AreaPIN 444606
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.91145, 77.78027
Samruddhi Heights is at latitude 20.91145, longitude 77.78027.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2019

The latest completion date on record passed 7 years and 7 months ago.

Registered
10 Oct 2018
Promised
31 Mar 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030001804910 Oct 201831 Mar 2019—Samrudhi Housing and InfrastructuresProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Samruddhi Heights413

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

13 units registered

2 BHK Flate · 5 units2BHK Flate · 8 units
TypeCarpet areaUnits
2 BHK Flate46.95 sq m · 505 sq ft4
2 BHK Flate53.82 sq m · 579 sq ft1
2BHK Flate53.11 sq m · 572 sq ft4
2BHK Flate53.33 sq m · 574 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Samruddhi Heights

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER MAP82%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER MAP80%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE80%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER MAP80%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER MAP80%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 18 filings listed on MahaRERA's project page

Title report

Encumbrance details

Form B

Commencement certificate

Registration certificate

Form 1

Form 2

Form 2A

Show all 33 documentsShow fewer documents

Occupancy / completion certificate

  • Occupancy / completion certificate14 Aug 2019ViewSource

Form 5

Form 4

Other

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 25 Sep 2018View
  • Details of encumbrancesNON ENCUMBERANCE CERTIFICATE.pdf · uploaded 25 Sep 2018View
  • Declaration in FORM BFORM B.pdf · uploaded 25 Sep 2018View
  • Copy of Layout Approval (in case of layout)LAYOUT APPROVAL.pdf · uploaded 25 Sep 2018View
  • Building Plan Approval (IOD)BUILDING PLAN-ilovepdf-compressed-ilovepdf-compressed.pdf · uploaded 25 Sep 2018View
  • Commencement Certificates / NA Order for plotted developmentCommensment Certificate.pdf · uploaded 26 Sep 2018View
  • Proforma of Allotment letterUNDERTAKING.pdf · uploaded 26 Sep 2018View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 14 Aug 2019View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2.pdf · uploaded 14 Aug 2019View
  • Engineers Certificate on Quality Assurance (Form 2A)FORM 2A.pdf · uploaded 14 Aug 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 14 Aug 2019View
  • Annual Audit Report of Statutory CA (Form 5)Form 5.pdf · uploaded 27 Sep 2019View
  • Architect’s Certificate on Completion of Project (Form 4)OC 4.pdf · uploaded 28 Apr 2023View

Promoter documents

  • Legal Title reportSEARCH REPORT.pdf · uploaded 25 Sep 2018View
  • Declaration Form BFORM B.pdf · uploaded 25 Sep 2018View

Technical documents

  • Layout ApprovalLAYOUT APPROVAL.pdfView
  • Building Plan ApprovalBUILDING PLAN-ilovepdf-compressed-ilovepdf-compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterUNDERTAKING.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

28

As published on MahaRERA's project page

28

Boundaries

North
Road
South
Service Line and road
East
Plot No 2
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAdwait M Saurkar—
EngineerAmar Deshmukh—
OtherSujit Gadge—