Skip to content

Salasar Icon A

Completed

Amravati (M Corp.), Amravati 444607 |Promoter: Deoganga Builders And Developers

Residential / Group HousingRERAP50300011829
31 Aug 2017Registered with MahaRERA
31 Dec 2017Promised completion
1Building
22Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Commertial, Residential22 units in all
Land area for this project
1,049 sq m (11,293 sq ft)
Permissible built-up area
1,464 sq m (15,761 sq ft)
Sanctioned built-up area
1,464 sq m (15,761 sq ft)
Address
Survey No. 29-1/A, Plot No.2 And 3PIN 444607
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.89026, 75.32354
Salasar Icon A is at latitude 19.89026, longitude 75.32354.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
31 Aug 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030001182931 Aug 201731 Dec 2017—Deoganga Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Salasar Icon A522

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

22 units registered

Commertial · 12 unitsResidential · 10 units
TypeCarpet areaUnits
Commertial20.51 sq m · 221 sq ft6
Commertial31.15 sq m · 335 sq ft2
Commertial31.18 sq m · 336 sq ft2
Commertial54.19 sq m · 583 sq ft1
Commertial54.5 sq m · 587 sq ft1
Residential91.61 sq m · 986 sq ft4
Residential95.85 sq m · 1,032 sq ft3
Residential100.16 sq m · 1,078 sq ft3

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000059

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Salasar Icon A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOARING100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTICK TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTATION100%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING TANK100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELECTRIC METER ROOM100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

12 documents held by Deedo, 17 filings listed on MahaRERA's project page

Title report

Form B

Commencement certificate

Form 1

Form 2

Registration certificate

Form 4

Other (2)

Show all 29 documentsShow fewer documents

Other (2)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportlegal title.pdf · uploaded 16 Aug 2017View
  • Details of encumbrancesform b.pdf · uploaded 16 Aug 2017View
  • Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 16 Aug 2017View
  • Declaration in FORM Bform b.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate form 1.pdf · uploaded 16 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentcommencement.pdf · uploaded 16 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate.pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)map.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letter0010002.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 4)IMG_0004.pdf · uploaded 30 Mar 2018View
  • OtherIMG_0003.pdf · uploaded 30 Mar 2018View

Promoter documents

  • Legal Title reportlegal title.pdf · uploaded 16 Aug 2017View
  • Declaration Form Bform b.pdf · uploaded 16 Aug 2017View

Technical documents

  • Layout ApprovalLayout Plan.pdfView
  • Building Plan Approvalmap.pdfView

Other legal documents

  • OtherIMG_0003.pdfView

Proforma allotment letter

  • Proforma allotment letter0010002.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

233PLOT NO.2SURVEY NO. 291/A

As published on MahaRERA's project page

SURVEY NO. 29-1/A, PLOT NO.2 AND 3

Boundaries

North
Plot No 1 Of Daga
South
Plot No 3 Of Hablani
East
Plot Of Prakash Heda
West
Old Badnera Highway

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMinal Sarda—
EngineerPankaj Deshmukh—
OtherGirish Nagpure—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology