Amravati (M Corp.), Amravati 444607 |Promoter: Raghav Builders And Developers

7 Nov 2017Registered with MahaRERA
30 Dec 2021Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
524 sq m (5,641 sq ft)
Permissible built-up area
867 sq m (9,331 sq ft)
Sanctioned built-up area
667 sq m (7,178 sq ft)
Address
53, 54PIN 444607
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.13725, 79.05886
Raghav Florence is at latitude 21.13725, longitude 79.05886.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2021

The latest completion date on record passed 4 years and 10 months ago.

Registered
7 Nov 2017
Promised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P503000139947 Nov 201730 Dec 2021—Raghav Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Raghav Florence5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Raghav Florence

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER DRAWING100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER SANCTION PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

13 documents held by Deedo, 17 filings listed on MahaRERA's project page

Titles

Encumbrance

Commencement certificate

Form b

Completion

Form 4

Others

Registration certificate

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportSEARCH REPORT.pdf · uploaded 28 Aug 2017View
  • Copy of the legal title reportSALE DEED.pdf · uploaded 28 Aug 2017View
  • Proforma of Allotment letterRera Model Deed Raghav.pdf · uploaded 28 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT.pdf · uploaded 28 Aug 2017View
  • Details of encumbrancesencumbrance.pdf · uploaded 28 Aug 2017View
  • Copy of Layout Approval (in case of layout)LAYOUT SCAN COPY.pdf · uploaded 27 Sep 2017View
  • Building Plan Approval (IOD)layout plan new.pdf · uploaded 27 Sep 2017View
  • Declaration in FORM BAFFIDAVIT.pdf · uploaded 27 Oct 2017View
  • Architect’s Certificate on Completion of Project (Form 4)ARCHITECS CERTIFICATE.pdf · uploaded 10 Dec 2020View
  • Status of Formation of Legal Entity (Society/Co Op etc.)PAN CARD.pdf · uploaded 10 Dec 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFORM 1.pdf · uploaded 10 Dec 2020View

Promoter documents

  • Legal Title reportSEARCH REPORT.pdf · uploaded 28 Aug 2017View
  • Legal Title reportSALE DEED.pdf · uploaded 28 Aug 2017View
  • Declaration Form BAFFIDAVIT.pdf · uploaded 27 Oct 2017View

Technical documents

  • Layout ApprovalLAYOUT SCAN COPY.pdfView
  • Building Plan Approvallayout plan new.pdfView

Proforma allotment letter

  • Proforma allotment letterRera Model Deed Raghav.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

5354

As published on MahaRERA's project page

53 ,54

Boundaries

North
Road
South
Plot No 52
East
Service Lane
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSushil Khandarkar—
EngineerAmit Gilda—
OtherAbdul Hamid Sheikh—
Real Estate AgentDeepak A Sagne—
OtherRaju N Dike—
OtherSagar Ingole—
Registered real estate agentDeepaka SagneA50300002508

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology