Rachayati Crown

Completed

Amravati (M Corp.), Amravati 444604 |Promoter: Rachayati Realtors and Developers pvt ltd

5 Apr 2021Registered with MahaRERA
30 Apr 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
728 sq m (7,836 sq ft)
Permissible built-up area
2,329 sq m (25,072 sq ft)
Sanctioned built-up area
2,329 sq m (25,072 sq ft)
Address
Survey no 185 / 1/ A/ 3/4, Survey no 185/1/A/Plot 3 & 4, Wallabha Nagar, Near Hanuman mandir, Police colony, behind SSD bungalow, Arjun Nagar, AmravatiPIN 444604
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.96593, 77.77419
Rachayati Crown is at latitude 20.96593, longitude 77.77419.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Apr 2024

The latest completion date on record passed 2 years and 6 months ago.

Registered
5 Apr 2021
Promised
30 Apr 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P503000288655 Apr 202130 Apr 2024—Rachayati Realtors and Developers pvt ltdProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Rachayati Crown8—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000010
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Rachayati Crown

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
  • Sanitary Fittings within the flats / premises75%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWork in Progress75%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Work in Progress75%
  • Storm Water DrainsWork in Progress75%
  • Landscaping & Tree PlantingWork in Progress45%
  • Street LightingWork in Progress35%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWork in Progress90%
  • Energy managemcntWork in Progress75%
  • Fire protection and fire safety requirementsWork in Progress80%
  • Electrical meter room, sub-station, receiving stationWork in Progress25%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • Kids play area on terrace floorWork in Progress20%
  • Multipurpose hall or Yoga roomWork in Progress60%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

28 documents held by Deedo, 43 filings listed on MahaRERA's project page

Title

Form 2

Form b

Registration certificate

Encumbrances

Commencement certificate

Form 2a

Others

Form 5s

Allotment letters

Completion

Layout plan

Document library

  • Copy of the legal title reportRachayati Crown - Title Certificate-25-03-2021.pdf · uploaded 31 Jan 2021View
  • Details of encumbrancesEncumbrance certificate- Rachayati Enclave.pdf · uploaded 14 Mar 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)General.pdf · uploaded 14 Mar 2021View
  • Proforma of Allotment letterGeneral.pdf · uploaded 14 Mar 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Rachayati Crown Estimate-RC-1- 18-03-2021 Uploaded on RERA Website.pdf · uploaded 18 Mar 2021View
  • Copy of Layout Approval (in case of layout)Rachayati Crown – Building permission and Approval Plan – 16-03-2021.pdf · uploaded 18 Mar 2021View
  • Commencement Certificates / NA Order for plotted developmentRachayati Crown – Building permission and Commencement Certificate – 16-03-2021-1.pdf · uploaded 30 Mar 2021View
  • Declaration in FORM BForm B Maha RERA 1 (1).pdf · uploaded 31 Mar 2021View
  • Building Plan Approval / NA Order for plotted developmentRachayati Crown – Building permission and Approval Plan – 16-03-2021.pdf · uploaded 31 Mar 2021View
  • Declaration about Commencement Certificate1 Commencement Certificates _ NA Order for plotted development.pdf · uploaded 19 Feb 2023View
  • a Details of encumbrances concerned to FinanceRC - Details of Legal Encumbrances.pdf · uploaded 2 Jul 2023View
  • b Details of encumbrances concerned to LegalRC - Details of Legal Encumbrances.pdf · uploaded 2 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Certificate_compressed.pdf · uploaded 2 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Certificate_compressed.pdf · uploaded 2 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Quality Certificate_compressed.pdf · uploaded 2 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Quality Certificate_compressed.pdf · uploaded 2 Jul 2023View
  • CERSAI detailsCERSSAI R_compressed.pdf · uploaded 2 Jul 2023View
  • Status of Formation of Legal Entity (Society/Co Op etc.)RC Undertaking for formation of Legal society.pdf · uploaded 2 Jul 2023View
  • Status of ConveyanceRC Undertaking for Property Conveyance.pdf · uploaded 2 Jul 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentRC OC.pdf · uploaded 2 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)Form5 FY 2017 18.pdf · uploaded 2 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form5 FY 2018 19.pdf · uploaded 2 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form5 FY 2019 20.pdf · uploaded 2 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form5 FY 2020 21.pdf · uploaded 2 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form5 FY 2021 22.pdf · uploaded 2 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form5 FY 2022 23.pdf · uploaded 2 Jul 2023View
  • Foreclosure of the ProjectRC Undertaking for foreclosure of the project.pdf · uploaded 2 Jul 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameRC Details of Escrow Acc Encumbrances.pdf · uploaded 2 Jul 2023View
  • Other – LegalRC Undertaking Details for RERA Legal Finance Techinical.pdf · uploaded 2 Jul 2023View
  • Other – FinanceRC Undertaking Details for RERA Legal Finance Techinical.pdf · uploaded 2 Jul 2023View
  • Other – TechnicalRC Undertaking Details for RERA Legal Finance Techinical.pdf · uploaded 2 Jul 2023View
  • Deviation Report with respect to Allotment letterRC - Undertaking Details for RERA Deviation Allotment lette model Agreement.pdf · uploaded 2 Jul 2023View
  • Proforma of Agreement for saleRC - Undertaking Details for RERA Deviation Allotment lette model Agreement.pdf · uploaded 2 Jul 2023View
  • Deviation Report with respect to model copy of AgreementRC - Undertaking Details for RERA Deviation Allotment lette model Agreement.pdf · uploaded 2 Jul 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsRC Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 2 Jul 2023View
  • Deviation Report with respect to model copy of AgreementRC - Undertaking Details for RERA Deviation Allotment lette model Agreement.pdf · uploaded 2 Jul 2023View

Promoter documents

  • Legal Title reportRachayati Crown - Title Certificate-25-03-2021.pdf · uploaded 31 Jan 2021View
  • Declaration Form BForm B Maha RERA 1 (1).pdf · uploaded 31 Mar 2021View

Technical documents

  • Building Plan ApprovalRachayati Crown – Building permission and Approval Plan – 16-03-2021.pdfView
  • Layout ApprovalRachayati Crown – Building permission and Approval Plan – 16-03-2021.pdfView

Other legal documents

  • Other – LegalRC Undertaking Details for RERA Legal Finance Techinical.pdfView

Financial documents

  • Other – FinanceRC Undertaking Details for RERA Legal Finance Techinical.pdf · uploaded 2 Jul 2023View

Proforma allotment letter

  • Proforma allotment letterGeneral.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

Survey no 185 / 1/ A/ 3/4

As published on MahaRERA's project page

Survey no 185 / 1/ A/ 3/4

Boundaries

North
house and flat scheme
South
flat scheme
East
Road
West
house and plot

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPrinkesh Soni—
Chartered accountantChetan Mahore—
EngineerSubodhkumar Dhoke—
OtherVasusen Deshmukh—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology