Rachana Srushti
LapsedAmravati (M Corp.), Amravati 444602 |Promoter: Srushti Infra
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Lapsed
- RERA registrations
- 2
- Phases
- 2
- Buildings
- 2
- Land area for this project
- 2,546 sq m (27,402 sq ft)
- Permissible built-up area
- 11,171 sq m (1,20,239 sq ft)
- Sanctioned built-up area
- 11,171 sq m (1,20,239 sq ft)
- Planning authority
- AMRAVATI MUNICIPAL CORPORATION
- Address
- Survey No 103/4 Plot No 24, Amravati University To Dental College Road, Srushti InfraPIN 444602
- Designated bank account
- State Bank Of India
- Litigation declared by promoter
- None declared
- Financial encumbrance declared
- None declared
Location
Coordinates as published by MahaRERA
Also registered as
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Sep 2024
P50300031176The latest completion date on record passed 2 years and 1 month ago.
- Registered
- 11 Oct 2021
- Promised
- 30 Sep 2024
Completion promised for 1 Dec 2025
P50300049603The latest completion date on record passed 10 months ago.
- Registered
- 15 Feb 2023
- Promised
- 1 Dec 2025
2 RERA registrations
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P50300031176 | 11 Oct 2021 | 30 Sep 2024 | — | Srushti Infra | Project page |
| P50300049603 | 15 Feb 2023 | 1 Dec 2025 | — | Srushti Infra | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Rachana Srushti | 13 | — |
| Rachana Srushti Phase II | 12 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 units registered
Parking
| Building | Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|---|
| Rachana Srushti | Closed/Covered | 0 | 0 | 0 | 0 | 2 |
| Rachana Srushti | Open Space | 0 | 0 | 0 | 0 | 1 |
| Rachana Srushti Phase II | Closed/Covered | 0 | 0 | 0 | 0 | 0 |
| Rachana Srushti Phase II | Open Space | 0 | 0 | 0 | 0 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress
Work completed, as the promoter reported it to MahaRERA (Form 1)
Rachana Srushti
Rachana Srushti Phase II
Common areas and amenities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Documents
77 documents held by Deedo, 150 filings listed on MahaRERA's project page
Encumbrances
Commencement certificates
Form 2s
- Form 2P50300031176 · 21 Sep 2021ViewSource
- Form 2P50300031176 · 28 Sep 2022ViewSource
- Form 2P50300031176 · 16 Feb 2023ViewSource
- Form 2P50300031176 · 7 Oct 2023ViewSource
- Form 2P50300031176 · 7 Oct 2023ViewSource
- Form 2P50300031176 · 20 Jun 2024ViewSource
- Form 2P50300031176 · 4 Feb 2025ViewSource
- Form 2P50300049603 · 11 Jun 2026ViewSource
- Form 2P50300049603 · 11 Jun 2026ViewSource
- Form 2P50300049603 · 11 Jun 2026ViewSource
- Form 2P50300049603 · 4 Aug 2026ViewSource
Registration certificates
Form 1s
- Form 1P50300031176 · 28 Sep 2022ViewSource
- Form 1P50300049603 · 13 Dec 2022ViewSource
- Form 1P50300031176 · 16 Feb 2023ViewSource
- Form 1P50300031176 · 7 Oct 2023ViewSource
- Form 1P50300049603 · 7 Oct 2023ViewSource
- Form 1P50300031176 · 7 Oct 2023ViewSource
- Form 1P50300031176 · 6 Feb 2024ViewSource
- Form 1P50300031176 · 6 Feb 2024ViewSource
- Form 1P50300049603 · 10 Feb 2024ViewSource
- Form 1P50300031176 · 20 Jun 2024ViewSource
- Form 1P50300049603 · 20 Jun 2024ViewSource
- Form 1P50300031176 · 4 Feb 2025ViewSource
- Form 1P50300049603 · 11 Jun 2026ViewSource
- Form 1P50300049603 · 11 Jun 2026ViewSource
- Form 1P50300049603 · 11 Jun 2026ViewSource
- Form 1P50300049603 · 11 Jun 2026ViewSource
- Form 1P50300049603 · 11 Jun 2026ViewSource
- Form 1P50300049603 · 11 Jun 2026ViewSource
- Form 1P50300049603 · 4 Aug 2026ViewSource
- Form 1P50300049603 · 4 Aug 2026ViewSource
- Form 1P50300049603 · 4 Aug 2026ViewSource
- Form 1P50300049603 · 4 Aug 2026ViewSource
Completions
Others
- OtherP50300049603 · 11 Jun 2026ViewSource
- OtherP50300049603 · 11 Jun 2026ViewSource
- OtherP50300049603 · 11 Jun 2026ViewSource
- OtherP50300049603 · 11 Jun 2026ViewSource
- OtherP50300049603 · 11 Jun 2026ViewSource
- OtherP50300049603 · 11 Jun 2026ViewSource
- OtherP50300049603 · 11 Jun 2026ViewSource
- OtherP50300049603 · 4 Aug 2026ViewSource
- OtherP50300031176 · Date not statedViewSource
- OtherP50300049603 · Date not statedViewSource
- OtherP50300031176 · Date not statedViewSource
Form 2as
Building plans
- Building planP50300031176 · Date not statedViewSource
- Building planP50300031176 · Date not statedViewSource
- Building planP50300031176 · Date not statedViewSource
- Building planP50300049603 · Date not statedViewSource
- Building planP50300049603 · Date not statedViewSource
- Building planP50300049603 · Date not statedViewSource
- Building planP50300049603 · Date not statedViewSource
- Building planP50300049603 · Date not statedViewSource
- Building planP50300049603 · Date not statedViewSource
- Building planP50300049603 · Date not statedViewSource
Document library
- Details of encumbrancesP50300031176 · ADV_compressed.pdf · uploaded 21 Sep 2021View
- Copy of Layout Approval (in case of layout)P50300031176 · LAYOUT MAP.pdf · uploaded 21 Sep 2021View
- Building Plan Approval / NA Order for plotted developmentP50300031176 · building map 1.pdf · uploaded 21 Sep 2021View
- Building Plan Approval / NA Order for plotted developmentP50300031176 · building map 2.pdf · uploaded 21 Sep 2021View
- Building Plan Approval / NA Order for plotted developmentP50300031176 · building map 3.pdf · uploaded 21 Sep 2021View
- Declaration in FORM BP50300031176 · fom-b.pdf · uploaded 21 Sep 2021View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · architect certificate.pdf · uploaded 21 Sep 2021View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300031176 · engineer's certificate.pdf · uploaded 21 Sep 2021View
- Proforma of Allotment letterP50300031176 · agreement to sale.pdf · uploaded 21 Sep 2021View
- Declaration about Commencement CertificateP50300031176 · srushti infra commencement declaration.pdf · uploaded 21 Sep 2021View
- Commencement Certificates / NA Order for plotted developmentP50300031176 · Document 2.pdf · uploaded 2 Oct 2021View
- Copy of the legal title reportP50300031176 · updated title report.pdf · uploaded 6 Oct 2021View
- Details of encumbrancesP50300031176 · Encumbrance Certificate.pdf · uploaded 28 Sep 2022View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · Architect Certificate.pdf · uploaded 28 Sep 2022View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300031176 · Engineer Certificate.pdf · uploaded 28 Sep 2022View
- Copy of the legal title reportP50300049603 · TITELREPORT.pdf · uploaded 13 Dec 2022Source
- Commencement Certificates / NA Order for plotted developmentP50300049603 · commencement certificate phase 2.pdf · uploaded 13 Dec 2022View
- Declaration about Commencement CertificateP50300049603 · declaration about commencement certificate.pdf · uploaded 13 Dec 2022View
- Declaration in FORM BP50300049603 · affidavit cum declaration new.pdf · uploaded 13 Dec 2022View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300049603 · Architect certificate (1).pdf · uploaded 13 Dec 2022View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300049603 · Engineer certificate phase 2.pdf · uploaded 13 Dec 2022Source
- CERSAI detailsP50300049603 · CERSAI_Search_Report_200259393985_For_Asset_Based_Search_03_02_2023_12_37_37_089.pdf · uploaded 13 Dec 2022Source
- Deviation Report with respect to Allotment letterP50300049603 · Deviation Report .pdf · uploaded 13 Dec 2022Source
- Building Plan Approval / NA Order for plotted developmentP50300049603 · Mar 2022-- 055 (1).pdf · uploaded 13 Dec 2022Source
- Building Plan Approval / NA Order for plotted developmentP50300049603 · Mar 2022-- 056 (1).pdf · uploaded 13 Dec 2022Source
- Building Plan Approval / NA Order for plotted developmentP50300049603 · Mar 2022-- 057 (1).pdf · uploaded 13 Dec 2022View
- Building Plan Approval / NA Order for plotted developmentP50300049603 · Mar 2022-- 058 (1).pdf · uploaded 13 Dec 2022View
- Building Plan Approval / NA Order for plotted developmentP50300049603 · Mar 2022-- 059 (1).pdf · uploaded 13 Dec 2022View
- Building Plan Approval / NA Order for plotted developmentP50300049603 · Mar 2022-- 060 (1).pdf · uploaded 13 Dec 2022View
- Building Plan Approval / NA Order for plotted developmentP50300049603 · Mar 2022-- 061 (1).pdf · uploaded 13 Dec 2022View
- Building Plan Approval / NA Order for plotted developmentP50300049603 · Mar 2022-- 062 (1).pdf · uploaded 13 Dec 2022View
- Copy of Layout Approval (in case of layout)P50300049603 · revised map (1).pdf · uploaded 13 Dec 2022Source
- Building Plan Approval / NA Order for plotted developmentP50300049603 · Mar 2022-- 063 (1).pdf · uploaded 13 Dec 2022View
- Deviation Report with respect to model copy of AgreementP50300049603 · deviation.pdf · uploaded 13 Dec 2022Source
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP50300049603 · declaration about separate bank account for real estate project.pdf · uploaded 13 Dec 2022Source
- a Details of encumbrances concerned to FinanceP50300049603 · Encumbrance certificate with respect to legal.pdf · uploaded 13 Dec 2022Source
- b Details of encumbrances concerned to LegalP50300049603 · Encumbrance certificate with respect to legal.pdf · uploaded 13 Dec 2022Source
- Proforma of Allotment letterP50300049603 · Kaagaz_20221214_172758479714.pdf · uploaded 14 Dec 2022Source
- Proforma of Agreement for saleP50300049603 · agreementbykhandelwal.pdf · uploaded 14 Dec 2022Source
- Other – FinanceP50300049603 · Encumbrance certificate with respect to finance.pdf · uploaded 30 Dec 2022Source
- Disclosure of Interest in Other Real Estate OrganizationsP50300049603 · Partner.pdf · uploaded 5 Jan 2023Source
- CERSAI detailsP50300049603 · CERSAI_Search_Report_200259395929_For_Asset_Based_Search_03_02_2023_12_47_50_049.pdf · uploaded 26 Jan 2023Source
- CERSAI detailsP50300049603 · CERSAI_Search_Report_200259396043_For_Asset_Based_Search_03_02_2023_12_48_22_076.pdf · uploaded 26 Jan 2023Source
- a Details of encumbrances concerned to FinanceP50300049603 · encumbrance certificate.pdf · uploaded 26 Jan 2023Source
- b Details of encumbrances concerned to LegalP50300049603 · encumbrance certificate.pdf · uploaded 26 Jan 2023Source
- CERSAI detailsP50300049603 · MAHATMA FULE BANK LETTER.pdf · uploaded 3 Feb 2023Source
- CERSAI detailsP50300049603 · CERSAI REPLY.pdf · uploaded 7 Feb 2023Source
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300031176 · Form2_30062022.pdf · uploaded 16 Feb 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300031176 · Form1_30092022.pdf · uploaded 16 Feb 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · Form1_30092022.pdf · uploaded 16 Feb 2023View
- Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P50300031176 · Form5_Srushti Infra_2122.pdf · uploaded 16 Feb 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · Form 1.pdf · uploaded 7 Oct 2023View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · Form 1 New.pdf · uploaded 7 Oct 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300031176 · Form 2.pdf · uploaded 7 Oct 2023View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300031176 · Form 2 New.pdf · uploaded 7 Oct 2023View
- Proforma of Agreement for saleP50300049603 · phase 2 FLAT AGREEMENT.pdf · uploaded 12 Oct 2023Source
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P50300049603 · Audit report 2022-2023_compressed-compressed.pdf · uploaded 12 Oct 2023Source
- Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P50300031176 · Audit report 2022-2023_compressed-compressed.pdf · uploaded 12 Oct 2023View
- Deviation Report with respect to Allotment letterP50300049603 · phase 2 FLAT AGREEMENT.pdf · uploaded 12 Oct 2023Source
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300049603 · ENGINEERSCERTIFICATE.pdf · uploaded 13 Oct 2023Source
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300049603 · ARCHITECTCERTIFICATE.pdf · uploaded 13 Oct 2023View
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP50300049603 · ESCROWACCOUNTDECLERATION.pdf · uploaded 13 Oct 2023Source
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP50300049603 · ESCROWACCOUNTDETAILS.pdf · uploaded 13 Oct 2023Source
- a Details of encumbrances concerned to FinanceP50300049603 · encumbrance letter.pdf · uploaded 1 Dec 2023Source
- b Details of encumbrances concerned to LegalP50300049603 · encumbrance letter.pdf · uploaded 1 Dec 2023Source
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · 31 2 2023 eng certificate.pdf · uploaded 6 Feb 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · 31 2 2023 eng certificate.pdf · uploaded 6 Feb 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · architectcertificate.pdf · uploaded 6 Feb 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300031176 · 31 2 2023 eng certificate.pdf · uploaded 6 Feb 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300049603 · arc certificate phase 2.pdf · uploaded 10 Feb 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300049603 · eng certificate phase 2.pdf · uploaded 10 Feb 2024Source
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP50300049603 · declarationaboutseparatebankaccount2.pdf · uploaded 31 Mar 2024Source
- Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP50300049603 · selfdeclarationphase2.pdf · uploaded 31 Mar 2024Source
- Other – FinanceP50300049603 · declarationcumundertaking2.pdf · uploaded 31 Mar 2024Source
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300049603 · ENGPHASE2.pdf · uploaded 20 Jun 2024Source
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300049603 · ARCPHASE2.pdf · uploaded 20 Jun 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · architecture certificate.pdf · uploaded 20 Jun 2024View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300031176 · phase 1 eng.pdf · uploaded 20 Jun 2024View
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300031176 · architect certificate P-1.pdf · uploaded 4 Feb 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300031176 · engineer certificate P-1.pdf · uploaded 4 Feb 2025View
- Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50300031176 · scan751_11zon.pdf · uploaded 4 Feb 2025View
- Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50300031176 · oc1.pdf · uploaded 4 Feb 2025View
- Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50300031176 · oc2.pdf · uploaded 4 Feb 2025View
- Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP50300031176 · oc3.pdf · uploaded 4 Feb 2025View
- Engineer’s Certificate on Cost Incurred on Project (Form 2)P50300049603 · engcerp2.pdf · uploaded 4 Feb 2025Source
- Architect’s Certificate of Percentage of Completion of Work (Form 1)P50300049603 · arccerp2.pdf · uploaded 4 Feb 2025Source
- Form 1P50300049603 · form 1 310323.pdf · uploaded 11 Jun 2026Source
- Form 2P50300049603 · 310323 FORM 2.pdf · uploaded 11 Jun 2026Source
- Disclosure of Sold and Booked InventoryP50300049603 · disc 310323.pdf · uploaded 11 Jun 2026Source
- Form 1P50300049603 · 300623 form 1.pdf · uploaded 11 Jun 2026Source
- Form 2P50300049603 · 300623 FORM 2.pdf · uploaded 11 Jun 2026View
- Disclosure of Sold and Booked InventoryP50300049603 · disc 300623.pdf · uploaded 11 Jun 2026View
- Form 1P50300049603 · 300923 form 1.pdf · uploaded 11 Jun 2026View
- Form 2P50300049603 · 300923 form 2.pdf · uploaded 11 Jun 2026View
- Disclosure of Sold and Booked InventoryP50300049603 · disc 300923.pdf · uploaded 11 Jun 2026View
- Form 1P50300049603 · 311223 form 1.pdf · uploaded 11 Jun 2026View
- Form 2P50300049603 · 3111223 form 2.pdf · uploaded 11 Jun 2026View
- Disclosure of Sold and Booked InventoryP50300049603 · disclosure 311223.pdf · uploaded 11 Jun 2026View
- Form 1P50300049603 · form 1 310324.pdf · uploaded 11 Jun 2026View
- Form 2P50300049603 · 310324 form 2.pdf · uploaded 11 Jun 2026View
- Disclosure of Sold and Booked InventoryP50300049603 · DISC310324.pdf · uploaded 11 Jun 2026View
- Form 1P50300049603 · 300624 form 1.pdf · uploaded 11 Jun 2026View
- Form 2P50300049603 · 30062A FORM 2.pdf · uploaded 11 Jun 2026View
- Disclosure of Sold and Booked InventoryP50300049603 · DISCLSUE 300624.pdf · uploaded 11 Jun 2026View
- Form 1P50300049603 · 300924 form 1.pdf · uploaded 11 Jun 2026View
- Form 2P50300049603 · 300924 form 2.pdf · uploaded 11 Jun 2026View
- Disclosure of Sold and Booked InventoryP50300049603 · dis 300924.pdf · uploaded 11 Jun 2026View
- Form 1P50300049603 · 311224 form 1.pdf · uploaded 11 Jun 2026View
- Form 2P50300049603 · 311224 form 2.pdf · uploaded 11 Jun 2026View
- Disclosure of Sold and Booked InventoryP50300049603 · disclosure 311224.pdf · uploaded 11 Jun 2026View
- Form 1P50300049603 · form 1 310325.pdf · uploaded 4 Aug 2026View
- Form 2P50300049603 · FORM 2.pdf · uploaded 4 Aug 2026View
- Disclosure of Sold and Booked InventoryP50300049603 · Sold Booked Inventory Disclosure.pdf · uploaded 4 Aug 2026View
- Withdrawal Update Form 1P50300049603 · 300625 form 1.pdf · uploaded 4 Aug 2026View
- Withdrawal Update Form 2P50300049603 · 300625 FORM 2.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 1P50300049603 · 300925 form 1.pdf · uploaded 4 Aug 2026View
- Withdrawal Update Form 2P50300049603 · 300925 form 2.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 1P50300049603 · FORM 1.pdf · uploaded 4 Aug 2026View
- Withdrawal Update Form 2P50300049603 · FORM 2 (2) (1).pdf · uploaded 4 Aug 2026Source
- Form 2A (FY 2024-2025)P50300049603 · Form 2A 2024-25.pdf · uploaded 8 Aug 2026Source
- Form 2A (FY 2025-2026)P50300049603 · Form 2A 2025-26 (1).pdf · uploaded 8 Aug 2026Source
- Form 5 (FY 2022-2023)P50300049603 · Form 5 23.pdf · uploaded 9 Aug 2026Source
- Form 5 (FY 2023-2024)P50300049603 · Form 5 24.pdf · uploaded 9 Aug 2026Source
- Form 5 (FY 2024-2025)P50300049603 · Form 5 25.pdf · uploaded 9 Aug 2026Source
- Form 2A (FY 2021-2022)P50300031176 · Form 2A 2021-22.pdf · uploaded 17 Aug 2026View
- Form 2A (FY 2022-2023)P50300031176 · Form 2A 2022-23.pdf · uploaded 17 Aug 2026View
- Form 2A (FY 2023-2024)P50300031176 · Form 2A 2023-24.pdf · uploaded 17 Aug 2026View
- Form 2A (FY 2024-2025)P50300031176 · Form 2A 2024-25.pdf · uploaded 17 Aug 2026View
Promoter documents
- Declaration Form BP50300031176 · fom-b.pdf · uploaded 21 Sep 2021View
- Legal Title reportP50300031176 · updated title report.pdf · uploaded 6 Oct 2021View
- Legal Title reportP50300049603 · TITELREPORT.pdf · uploaded 13 Dec 2022Source
- Declaration Form BP50300049603 · affidavit cum declaration new.pdf · uploaded 13 Dec 2022View
Technical documents
- Layout ApprovalP50300031176 · LAYOUT MAP.pdfView
- Building Plan ApprovalP50300031176 · building map 1.pdfView
- Building Plan ApprovalP50300031176 · building map 2.pdfView
- Building Plan ApprovalP50300031176 · building map 3.pdfView
- Layout ApprovalP50300049603 · revised map (1).pdfSource
- Building Plan ApprovalP50300049603 · Mar 2022-- 055 (1).pdfSource
- Building Plan ApprovalP50300049603 · Mar 2022-- 056 (1).pdfSource
- Building Plan ApprovalP50300049603 · Mar 2022-- 057 (1).pdfView
- Building Plan ApprovalP50300049603 · Mar 2022-- 058 (1).pdfView
- Building Plan ApprovalP50300049603 · Mar 2022-- 059 (1).pdfView
- Building Plan ApprovalP50300049603 · Mar 2022-- 060 (1).pdfView
- Building Plan ApprovalP50300049603 · Mar 2022-- 061 (1).pdfView
- Building Plan ApprovalP50300049603 · Mar 2022-- 062 (1).pdfView
- Building Plan ApprovalP50300049603 · Mar 2022-- 063 (1).pdfView
Financial documents
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Amravati (M Corp.), Amravati taluka
Survey, CTS, gat or plot numbers
As published on MahaRERA's project page
SURVEY NO 103/4 PLOT NO 24
Boundaries
- North
- Plot No 25
- South
- 30 Meter Wide Road
- East
- Plot No 21-A To 23
- West
- 30 Meter Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Shailendra Deshmukh | — | P50300049603 |
| Architect | Shailendra Deshmukh | — | P50300031176 |
| Chartered accountant | Aman Sahu | — | P50300031176 |
| Chartered accountant | Ashutosh Rajput | — | P50300049603 |
| Chartered accountant | Ashutosh Rajput | — | P50300031176 |
| Chartered accountant | Bhushan Lathiya | — | P50300049603 |
| Chartered accountant | KALOTI and LATHIYA | — | P50300031176 |
| Chartered accountant | Manish Khushlani | — | P50300049603 |
| Chartered accountant | V S Jakhotiya Chartered Accountants | — | P50300031176 |
| Engineer | Surendra Pohokar | — | P50300031176 |
| Engineer | Surendra Pohokar | — | P50300049603 |
| Engineer | V K Design Consultancy | — | P50300049603 |
| Engineer | Vk Design Consultancy | — | P50300031176 |
| Other | Rishabh Khandelwal | — | P50300049603 |
Source: MahaRERA project page. Contact details are not shown.