Purvika Residency

Completed

Amravati (M Corp.), Amravati 444602 |Promoter: Kedia Builders And Developers

Residential / Group HousingRERAP50300033929
14 Mar 2022Registered with MahaRERA
20 Jun 2023Promised completion
19 Jun 2024Revised completionPushed back 1 year
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
279 sq m (3,001 sq ft)
Permissible built-up area
549 sq m (5,912 sq ft)
Sanctioned built-up area
549 sq m (5,912 sq ft)
Address
Plot No. 32 S.no. 114/1, Mouje Rahatgaon, AmravatiPIN 444602
Designated bank account
Bank Of Baroda
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.95823, 77.79402
Purvika Residency is at latitude 20.95823, longitude 77.79402.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 2 years and 4 months ago.

Registered
14 Mar 2022
Promised
20 Jun 2023
Revised
19 Jun 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030003392914 Mar 202220 Jun 202319 Jun 2024Kedia Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Purvika Residency5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Purvika Residency

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER MAP0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER MAP0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER MAP0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER MAP0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 24 filings listed on MahaRERA's project page

Encumbrance

Commencement certificates

Others

Allotment letters

Titles

Form b

Registration certificate

Form 1

Form 2

Form 5s

Extension certificate

Form 4

Completion

Layout plan

Building plan

Document library

  • Details of encumbrancesEncumbrance Certificate.pdf · uploaded 2 Feb 2022View
  • Building Plan Approval / NA Order for plotted developmentPR AMC Sanction Plan_compressed.pdf · uploaded 2 Feb 2022View
  • Commencement Certificates / NA Order for plotted developmentPR AMC SANCTION LETTER_4_11zon.pdf · uploaded 2 Feb 2022View
  • Proforma of Allotment letterAGGREMENT TO SALE_11zon.pdf · uploaded 2 Feb 2022View
  • CERSAI detailsCERSAI_Search_Report_200229336764_For_Asset_Based_Search_02_02_2022_12_24_06_685.pdf · uploaded 2 Feb 2022View
  • Declaration about Commencement CertificateAdobe Scan 02-Feb-2022.pdf · uploaded 2 Feb 2022View
  • Proforma of Allotment letterPR_KBD_Allotment_Letter.pdf · uploaded 22 Feb 2022View
  • Copy of the legal title reportLTR 1-2.pdf · uploaded 3 Mar 2022View
  • Copy of the legal title reportLTR 3-5.pdf · uploaded 3 Mar 2022View
  • Copy of Layout Approval (in case of layout)Approved Layout Plan_compressed.pdf · uploaded 3 Mar 2022View
  • Declaration in FORM B202203051320-1_compressed.pdf · uploaded 5 Mar 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)kedia builders form 1_compressed.pdf · uploaded 9 Mar 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)kedia builders form 2_compressed.pdf · uploaded 9 Mar 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)kedia builders and developers 2021-22.pdf · uploaded 16 Aug 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)kedia builders and developers 2022-23.pdf · uploaded 16 Aug 2023View
  • Disclosure of sold/ booked inventoryDISCLOUSER OF SOLD INVENTORY.pdf · uploaded 16 Aug 2023View
  • Architect’s Certificate on Completion of Project (Form 4)PR_Form_4.pdf · uploaded 18 Oct 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC Certificate.pdf · uploaded 18 Oct 2024View

Promoter documents

  • Legal Title reportLTR 1-2.pdf · uploaded 3 Mar 2022View
  • Legal Title reportLTR 3-5.pdf · uploaded 3 Mar 2022View
  • Declaration Form B202203051320-1_compressed.pdf · uploaded 5 Mar 2022View

Technical documents

  • Building Plan ApprovalPR AMC Sanction Plan_compressed.pdfView
  • Layout ApprovalApproved Layout Plan_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterPR_KBD_Allotment_Letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

114/132PLOT NO. 32 S.NO. 114/1

As published on MahaRERA's project page

PLOT NO. 32 S.NO. 114/1

Boundaries

North
Survey No 119
South
Plot No 33
East
Main Road
West
Service Lane

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectBuild Craft Consulting Engineers LLP—
Chartered accountantS D Lakhotiya And Co—
EngineerBuildCraft Consulting Engineers LLP—
OtherRishabh Khandelwal—

Source: MahaRERA project page. Contact details are not shown.