P50300052769

Certificate Signed

Amravati (M Corp.), Amravati 444607 |Promoter: Anil Laxmichand Bothra

22 Sep 2023Registered with MahaRERA
28 Dec 2028Promised completion
2Buildings
44Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
3BHK, Office space, Shop44 units in all
Address
Plot No 1/2/15 Survey No 1/2 Mouje Saturna Prangane Badnera, Saturna Road, Sai NagarPIN 444607
Developed in phases
No

Also registered as

Royal Tower

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 28 Dec 2028

Registered
22 Sep 2023
Promised
28 Dec 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030005276922 Sep 202328 Dec 202828 Dec 2028Anil Laxmichand BothraProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P50300052769)——
Royal Tower644

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 44 units booked (0%), as the promoter reported to MahaRERA

3BHK · 20 unitsOffice space · 3 unitsShop · 21 units
TypeCarpet areaUnitsBooked
3BHK87.75 sq m · 945 sq ft50
3BHK88.41 sq m · 952 sq ft50
3BHK94.39 sq m · 1,016 sq ft50
3BHK95.12 sq m · 1,024 sq ft50
Office space32.29 sq m · 348 sq ft10
Office space45.03 sq m · 485 sq ft10
Office space110.79 sq m · 1,193 sq ft10
Shop14.39 sq m · 155 sq ft10
Show all 24 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop15.2 sq m · 164 sq ft10
Shop17.38 sq m · 187 sq ft10
Shop17.56 sq m · 189 sq ft10
Shop17.64 sq m · 190 sq ft20
Shop17.91 sq m · 193 sq ft20
Shop18.13 sq m · 195 sq ft20
Shop18.28 sq m · 197 sq ft10
Shop18.66 sq m · 201 sq ft10
Shop18.74 sq m · 202 sq ft10
Shop18.75 sq m · 202 sq ft10
Shop19.41 sq m · 209 sq ft10
Shop19.42 sq m · 209 sq ft10
Shop20.41 sq m · 220 sq ft10
Shop20.43 sq m · 220 sq ft10
Shop22.96 sq m · 247 sq ft10
Shop28.76 sq m · 310 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

46 documents held by Deedo, 119 filings listed on MahaRERA's project page

Registration certificate

Other (11)

  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
Show all 165 documentsShow fewer documents

Other (11)

  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView
  • OtherDate not statedView

Commencement certificate (2)

  • Commencement certificateDate not statedView
  • Commencement certificateDate not statedView

Form 1 (17)

  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView
  • Form 1Date not statedView

Encumbrance details (2)

  • Encumbrance detailsDate not statedView
  • Encumbrance detailsDate not statedView

Building plan (2)

  • Building planDate not statedView
  • Building planDate not statedView

Form B

  • Form BDate not statedView

Layout plan (4)

  • Layout planDate not statedView
  • Layout planDate not statedView
  • Layout planDate not statedView
  • Layout planDate not statedView

Allotment letter

  • Allotment letterDate not statedView

Form 2 (4)

  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView
  • Form 2Date not statedView

Title report

  • Title reportDate not statedView

Finance

  • PAN CardANIL BOTHRA PAN CARD.pdf · uploaded 16 Jul 2023View

Legal

  • Declaration Form BANIL BOTHRA FORM B.pdf · uploaded 16 Jul 2023View
  • Legal Title reportANIL BOTHRA SEARCH REPORT.pdf · uploaded 17 Jul 2023View

Migrated

  • 1 PAN CardANIL BOTHRA PAN CARD.pdf · uploaded 16 Jul 2023View
  • 1 Copy of Layout Approval (in case of layout)ANIL BOTHRA LAYOUT NA ORDER.pdf · uploaded 16 Jul 2023View
  • 2 Copy of Layout Approval (in case of layout)ANIL BOTHRA LAYOUT NA ORDER.pdf · uploaded 16 Jul 2023View
  • 1 Building Plan Approval / NA Order for plotted developmentANIL BOTHRA SANCTIONED MAP.pdf · uploaded 16 Jul 2023View
  • 1 Commencement Certificates / NA Order for plotted developmentANIL BOTHRA COMMENCEMENT CERTIFICATE.pdf · uploaded 16 Jul 2023View
  • 1 Declaration in FORM BANIL BOTHRA FORM B.pdf · uploaded 16 Jul 2023View
  • 1 Disclosure of Interest in Other Real Estate OrganizationsANIL BOTHRA OTHER PROJECT DISCLOSURE.pdf · uploaded 16 Jul 2023View
  • 1 Proforma of Allotment letterANIL BOTHRA ALLOTMENT.pdf · uploaded 16 Jul 2023View
  • 1 Copy of the legal title reportANIL BOTHRA SEARCH REPORT.pdf · uploaded 17 Jul 2023View
  • 1 a Details of encumbrances concerned to FinanceANIL BOTHRA ENCUMBERANCE.pdf · uploaded 17 Jul 2023View
  • 1 b Details of encumbrances concerned to LegalANIL BOTHRA ENCUMBERANCE.pdf · uploaded 17 Jul 2023View
  • 2 Building Plan Approval / NA Order for plotted developmentANIL BOTHRA AMALGAMANTION SUB ORDER.pdf · uploaded 17 Jul 2023View
  • 1 Declaration about Commencement CertificateANIL BOTHRA FORMAT D COMMENCEMENT DECL.pdf · uploaded 17 Jul 2023View
  • 1 CERSAI detailsANIL BOTHRA CERSAI DECLRATION.pdf · uploaded 17 Jul 2023View
  • 1 Proforma of Agreement for saleRoyal Tower ATS 170723.pdf · uploaded 17 Jul 2023View
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameANIL BOTHRA FORMAT D BANK.pdf · uploaded 17 Jul 2023View
  • 1 Deviation Report with respect to Allotment letterANIL BOTHRA ALLOTMENT DEVIATION.pdf · uploaded 17 Jul 2023View
  • 1 Deviation Report with respect to model copy of AgreementANIL BOTHRA ATS DEVIATION.pdf · uploaded 17 Jul 2023View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)DOC.pdf · uploaded 7 Aug 2023Source
  • 1 Other – TechnicalAnil Bothra Declaration.pdf · uploaded 2 Sep 2023View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Royal Tower_Form 1_300923.pdf · uploaded 8 Jul 2024View
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Royal Tower_Form 1_311223.pdf · uploaded 8 Jul 2024View
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Royal Tower_Form 1_310324.pdf · uploaded 8 Jul 2024View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Royal Tower_Form 2_300923.pdf · uploaded 8 Jul 2024View
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Royal Tower_Form 2_311223.pdf · uploaded 8 Jul 2024View
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Royal Tower_Form 2_310324.pdf · uploaded 8 Jul 2024View
  • 1 Disclosure of sold/ booked inventoryRoyal Tower_SoldUnsold_300923.pdf · uploaded 8 Jul 2024View
  • 2 Disclosure of sold/ booked inventoryRoyal Tower_SoldUnsold_311223.pdf · uploaded 8 Jul 2024View
  • 3 Disclosure of sold/ booked inventoryRoyal Tower_SoldUnsold_310324.pdf · uploaded 8 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royal Tower_Form 3_300923.pdf · uploaded 8 Jul 2024View
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royal Tower_Form 3_311223.pdf · uploaded 8 Jul 2024View
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royal Tower_Form 3_310324.pdf · uploaded 8 Jul 2024View
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Royal Tower_Form 2A_310324.pdf · uploaded 16 Jul 2024View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)30-6-2024.pdf · uploaded 26 Apr 2025View
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)30-9-2024.pdf · uploaded 26 Apr 2025View
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)31-12-2024.pdf · uploaded 26 Apr 2025View
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)31-3-2025.pdf · uploaded 26 Apr 2025View
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royal Tower_Form 3_300624_compressed.pdf · uploaded 26 Apr 2025View
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royal Tower_Form 3_300924_compressed.pdf · uploaded 26 Apr 2025View
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royal Tower_Form 3_311224_compressed.pdf · uploaded 26 Apr 2025View
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Royal Tower_Form 3_310325_compressed.pdf · uploaded 26 Apr 2025View
  • 1 Disclosure of sold/ booked inventoryRoyal Tower_SoldUnsold_300624.pdf · uploaded 26 Apr 2025View
  • 2 Disclosure of sold/ booked inventoryRoyal Tower_SoldUnsold_300924.pdf · uploaded 26 Apr 2025View
  • 3 Disclosure of sold/ booked inventoryRoyal Tower_SoldUnsold_311224.pdf · uploaded 26 Apr 2025Source
  • 4 Disclosure of sold/ booked inventoryRoyal Tower_SoldUnsold_310325.pdf · uploaded 26 Apr 2025View
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)from 2 , 30-06-24.pdf · uploaded 3 May 2025View
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)from 2,30-09-24.pdf · uploaded 3 May 2025View
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)from 2,31-12-24.pdf · uploaded 3 May 2025View
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)from 2, 31-03-25.pdf · uploaded 3 May 2025View
  • Form 1Royal Tower_Form 1_300923.pdf · uploaded 14 Aug 2025Source
  • Form 2Royal Tower_Form 2_300923.pdf · uploaded 14 Aug 2025Source
  • Form 3Royal Tower_Form 3_300923.pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventoryRoyal Tower_SoldUnsold_300923.pdf · uploaded 14 Aug 2025Source
  • Form 1Royal Tower_Form 1_311223.pdf · uploaded 14 Aug 2025Source
  • Form 2Royal Tower_Form 2_311223.pdf · uploaded 14 Aug 2025Source
  • Form 3Royal Tower_Form 3_311223.pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventoryRoyal Tower_SoldUnsold_311223.pdf · uploaded 14 Aug 2025Source
  • Form 1Royal Tower_Form 1_310324.pdf · uploaded 14 Aug 2025Source
  • Form 2Royal Tower_Form 2_310324.pdf · uploaded 14 Aug 2025Source
  • Form 3Royal Tower_Form 3_300624.pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventoryRoyal Tower_SoldUnsold_310324.pdf · uploaded 14 Aug 2025Source
  • OthersRoyal Tower_Form 2A_310324.pdf · uploaded 14 Aug 2025Source
  • Form 1Form 1 30-6-2024.pdf · uploaded 14 Aug 2025Source
  • Form 2from 2 , 30-06-24.pdf · uploaded 14 Aug 2025Source
  • Form 3Royal Tower_Form 3_300624_compressed.pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventoryRoyal Tower_SoldUnsold_300624.pdf · uploaded 14 Aug 2025Source
  • Form 1Form 1 30-9-2024.pdf · uploaded 14 Aug 2025Source
  • Form 2from 2,30-09-24.pdf · uploaded 14 Aug 2025Source
  • Form 3Royal Tower_Form 3_300924.pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventoryRoyal Tower_SoldUnsold_300924.pdf · uploaded 14 Aug 2025Source
  • Form 1Form 1 31-12-2024.pdf · uploaded 14 Aug 2025Source
  • Form 2from 2,31-12-24.pdf · uploaded 14 Aug 2025Source
  • Form 3Royal Tower_Form 3_311224.pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventoryRoyal Tower_SoldUnsold_311224.pdf · uploaded 14 Aug 2025Source
  • Form 1Form 1 31-3-2025.pdf · uploaded 14 Aug 2025Source
  • Form 2from 2, 31-03-25.pdf · uploaded 14 Aug 2025Source
  • Form 3Royal Tower_Form 3_310325.pdf · uploaded 14 Aug 2025Source
  • Disclosure of Sold and Booked InventoryRoyal Tower_SoldUnsold_310325.pdf · uploaded 14 Aug 2025Source
  • Withdrawal Update Form 1Royal_Form 1_300625.pdf · uploaded 11 Dec 2025Source
  • Withdrawal Update Form 1Royal_Form 1_300925.pdf · uploaded 11 Dec 2025Source
  • Withdrawal Update Form 2Royal_Form 2_300625.pdf · uploaded 11 Dec 2025Source
  • Withdrawal Update Form 2Royal_Form 2_300925.pdf · uploaded 11 Dec 2025Source
  • Withdrawal Update Form 3Royal_Form 3_300625.pdf · uploaded 11 Dec 2025Source
  • Withdrawal Update Form 3Royal_Form 3_300925.pdf · uploaded 11 Dec 2025Source
  • Form 5 (FY 2023-2024)Form 5 RERA 2023-24.pdf · uploaded 2 Feb 2026Source
  • Form 5 (FY 2024-2025)Form 5 RERA 2024-25.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 17 Feb 2026Source
  • Withdrawal Update Form 2Royal_Form 2_300925.pdf · uploaded 17 Feb 2026Source
  • Withdrawal Update Form 3FORM-3.pdf · uploaded 17 Feb 2026Source
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 21 Feb 2026Source
  • Withdrawal Update Form 2Royal_Form 2_300925.pdf · uploaded 21 Feb 2026Source
  • Withdrawal Update Form 3FORM-3.pdf · uploaded 21 Feb 2026Source
  • Withdrawal Update Form 1FORM-1.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 3FORM-3.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 1form 1 signed.pdf · uploaded 21 May 2026Source
  • Withdrawal Update Form 2form 2 signed.pdf · uploaded 21 May 2026Source
  • Withdrawal Update Form 3form 3 q4 signed .pdf · uploaded 21 May 2026Source
  • Withdrawal Update Form 1forn 1 June 2026.pdf · uploaded 25 Jul 2026Source
  • Withdrawal Update Form 2form 2 june 26 25.pdf · uploaded 25 Jul 2026Source
  • Withdrawal Update Form 3Form 3 signed and scanned (5).pdf · uploaded 25 Jul 2026Source

Technical

  • DocumentANIL BOTHRA LAYOUT NA ORDER.pdf · uploaded 16 Jul 2023View
  • DocumentANIL BOTHRA LAYOUT NA ORDER.pdf · uploaded 16 Jul 2023View
  • DocumentANIL BOTHRA SANCTIONED MAP.pdf · uploaded 16 Jul 2023View
  • DocumentANIL BOTHRA AMALGAMANTION SUB ORDER.pdf · uploaded 17 Jul 2023View
  • Other – TechnicalAnil Bothra Declaration.pdf · uploaded 2 Sep 2023View

Technical (Architect)

  • Document30-6-2024.pdf · uploaded 26 Apr 2025View
  • Document30-9-2024.pdf · uploaded 26 Apr 2025View
  • Document31-12-2024.pdf · uploaded 26 Apr 2025View
  • Document31-3-2025.pdf · uploaded 26 Apr 2025View
  • Documentforn 1 June 2026.pdf · uploaded 25 Jul 2026Source

Technical (Engineer)

  • Documentfrom 2 , 30-06-24.pdf · uploaded 3 May 2025View
  • Documentfrom 2,30-09-24.pdf · uploaded 3 May 2025View
  • Documentfrom 2,31-12-24.pdf · uploaded 3 May 2025View
  • Documentfrom 2, 31-03-25.pdf · uploaded 3 May 2025View
  • Documentform 2 june 26 25.pdf · uploaded 25 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

PLOT NO 1/2/15 SURVEY NO 1/2 MOUJE SATURNA PRANGANE BADNERA

Boundaries

North
Nala And Service Lane Of Layout
South
9 Mtr Road
East
Sai Nagar Saturna Road
West
Plot No 14

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGirish Nagpure & Associates—
Chartered accountantAnmol Bardia—
Chartered accountantCa Deepak Zambani Gad & Associates—
EngineerAshish K Agrawal—
EngineerPankaj Deshmukh—

Source: MahaRERA project page. Contact details are not shown.