Kasturi Heights

Completed

Amravati (M Corp.), Amravati 444603 |Promoter: Gajanan Vasudeo Patil

14 Jan 2019Registered with MahaRERA
30 Jan 2023Promised completion
30 Jan 2024Revised completionPushed back 1 year
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Land area for this project
471 sq m (5,067 sq ft)
Permissible built-up area
655 sq m (7,050 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
0 sq m (0 sq ft)
Address
Survey No 195/3B, Plot no 11B, 12A, Kalaniketan Layout, ganesh Nagar, Behind Deshmukh Lawn, Shegaon Rahatgaon road Amravati, AmravatiPIN 444603
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Kasturi Heights is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 2 years and 9 months ago.

Registered
14 Jan 2019
Promised
30 Jan 2023
Revised
30 Jan 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030001925414 Jan 201930 Jan 202330 Jan 2024Gajanan Vasudeo PatilProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Kasturi Heights6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000061
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Kasturi Heights

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per plan100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterWork started50%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAt the time of Completion100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAt the time of Completion100%
  • Electrical meter room, sub-station, receiving stationAs per plan50%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingParking100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

33 documents held by Deedo, 37 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 1s

Form 2s

Form 2as

Form 5s

Others

Registration certificate

Extension certificate

Completion

Form 4s

Layout plan

Building plan

Allotment letter

Document library

  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate.pdf · uploaded 8 Jan 2019View
  • Copy of the legal title reportLegal Title Report.pdf · uploaded 8 Jan 2019View
  • Details of encumbrancesEncumbrances.pdf · uploaded 8 Jan 2019View
  • Proforma of Allotment letterUndertaking.pdf · uploaded 8 Jan 2019View
  • Declaration in FORM BForm B.pdf · uploaded 8 Jan 2019View
  • Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 8 Jan 2019View
  • Commencement Certificates / NA Order for plotted developmentPermit.pdf · uploaded 8 Jan 2019View
  • Building Plan Approval (IOD)Building Plan.pdf · uploaded 8 Jan 2019View
  • Form 2AQuality assurance certificate.pdf · uploaded 6 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 6 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate 06_06_2019.pdf · uploaded 6 Jun 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)from 5.pdf · uploaded 15 Aug 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect.pdf · uploaded 15 Aug 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)quality.pdf · uploaded 15 Aug 2021View
  • Disclosure of sold/ booked inventorysold inventory.pdf · uploaded 19 Aug 2021View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer.pdf · uploaded 20 Feb 2022View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect.pdf · uploaded 20 Feb 2022View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect.pdf · uploaded 1 Dec 2022View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect.pdf · uploaded 2 Dec 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer.pdf · uploaded 2 Dec 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)From 5 19_20.pdf · uploaded 4 May 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 21_22.pdf · uploaded 4 May 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect.pdf · uploaded 9 Jul 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer.pdf · uploaded 9 Jul 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)form 5_ 22_23.pdf · uploaded 9 Jul 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)form 5 -23 -24.pdf · uploaded 9 Jul 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect form no 1.pdf · uploaded 20 Nov 2024View
  • Architect’s Certificate on Completion of Project (Form 4)architect form no 4.pdf · uploaded 20 Nov 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 20 Nov 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Untitled.pdf · uploaded 25 Nov 2024View
  • Other – Technicalarchitect form no 4.pdf · uploaded 25 Nov 2024View

Promoter documents

  • Legal Title reportLegal Title Report.pdf · uploaded 8 Jan 2019View
  • Declaration Form BForm B.pdf · uploaded 8 Jan 2019View

Technical documents

  • Layout ApprovalLayout.pdfView
  • Building Plan ApprovalBuilding Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterUndertaking.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

12A195/3BPlot no 11BSurvey No 195/3B

As published on MahaRERA's project page

Survey No 195/3B, Plot no 11B,12A

Boundaries

North
Plot no 11 A
South
Plot no 12 B
East
Adjacent Layout
West
12 M Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShailendra Desmukh—
Chartered accountantSunil Agrawal—
EngineerPankaj Deshmukh—
OtherRajesh Yadav—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology