Amravati (M Corp.), Amravati 444601 |Promoter: Mohit Associates

Residential / Group HousingRERAP50300007689
17 Aug 2017Registered with MahaRERA
31 Mar 2021Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
925 sq m (9,961 sq ft)
Permissible built-up area
1,296 sq m (13,946 sq ft)
Sanctioned built-up area
1,296 sq m (13,946 sq ft)
Address
1 AND 2, Badnera, BadneraPIN 444601
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.94071, 77.75800
Jai Bhole Apartment is at latitude 20.94071, longitude 77.75800.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2021

The latest completion date on record passed 5 years and 7 months ago.

Registered
17 Aug 2017
Promised
31 Mar 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030000768917 Aug 201731 Mar 2021—Mohit AssociatesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Jaibhole Apartment65—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000058
Open Space000098

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Jaibhole Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)010%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvesting00%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirements00%
  • Electrical meter room, sub-station, receiving station00%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking070%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

3 documents held by Deedo, 16 filings listed on MahaRERA's project page

Registration certificate

Other

Allotment letter

Document library

  • Copy of the legal title reportTITLE.pdf · uploaded 31 Jul 2017Source
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 31 Jul 2017Source
  • Declaration in FORM BDECLARATION.pdf · uploaded 31 Jul 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHT.pdf · uploaded 31 Jul 2017Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG-1.pdf · uploaded 31 Jul 2017Source
  • Building Plan Approval (IOD)COM-1.pdf · uploaded 31 Jul 2017Source
  • Proforma of Allotment letterA-1.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesE-1.pdf · uploaded 31 Jul 2017Source
  • Commencement Certificates / NA Order for plotted developmentflat cc badnera_compressed.pdf · uploaded 4 Nov 2024Source
  • Declaration about Commencement Certificateflat cc badnera_compressed.pdf · uploaded 4 Nov 2024Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc badnera.pdf · uploaded 4 Nov 2024Source

Promoter documents

  • Legal Title reportTITLE.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BDECLARATION.pdf · uploaded 31 Jul 2017Source

Technical documents

  • Layout ApprovalLAYOUT.pdfSource
  • Building Plan ApprovalCOM-1.pdfSource

Proforma allotment letter

  • Proforma allotment letterA-1.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

12

As published on MahaRERA's project page

1 AND 2

Boundaries

North
Plot No 3
South
Other Layout
East
Plot No 12 13 14 15
West
Badenra Yavatmal Road

Source: registration certificates and MahaRERA's project page, as stated there.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology