Skip to content
Deedo home
Menu

Indrayani Pride

Completed

Amravati (M Corp.), Amravati 444601 |Promoter: Govind Shridhar Tatte

Residential / Group HousingRERAP50300032002
3 Dec 2021Registered with MahaRERA
31 Dec 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
333 sq m (3,584 sq ft)
Permissible built-up area
1,116 sq m (12,008 sq ft)
Sanctioned built-up area
1,066 sq m (11,470 sq ft)
Address
Plot No. 5A And 5B 185/3 Mouje Rahatgaon, Arjun Nagar road, Plot No 5A And 5 B from field Survey No 185/3PIN 444601
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Indrayani Pride is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2024

The latest completion date on record passed 1 year and 10 months ago.

Registered
3 Dec 2021
Promised
31 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P503000320023 Dec 202131 Dec 2024—Govind Shridhar TatteProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Indrayani Pride8—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Indrayani Pride

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER MAP0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER MAP0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

20 documents held by Deedo, 24 filings listed on MahaRERA's project page

Form b

Title

Allotment letters

Encumbrance

Commencement certificates

Registration certificate

Completion

Form 4

Form 1s

Form 2s

Other

Layout plan

Building plan

Document library

  • Details of encumbrancesEncum cert.pdf · uploaded 6 Nov 2021View
  • Building Plan Approval / NA Order for plotted developmentSantion Map (2).pdf · uploaded 6 Nov 2021View
  • Declaration in FORM BForm B.pdf · uploaded 6 Nov 2021View
  • Proforma of Allotment lettert allotment.pdf · uploaded 6 Nov 2021View
  • Copy of the legal title reportsearch report t_11zon.pdf · uploaded 10 Nov 2021View
  • Proforma of Allotment letterallotment pdf.pdf · uploaded 20 Nov 2021View
  • Copy of Layout Approval (in case of layout)layout (3)_compressed.pdf · uploaded 26 Nov 2021View
  • Commencement Certificates / NA Order for plotted developmentCC_.pdf · uploaded 26 Nov 2021View
  • Declaration about Commencement Certificatedeclaration about commencement cert.pdf · uploaded 26 Nov 2021View
  • CERSAI detailsEncum cert.pdf · uploaded 26 Nov 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc TATHE.pdf · uploaded 3 Apr 2023View
  • Architect’s Certificate on Completion of Project (Form 4)form 4 pride.pdf · uploaded 9 Jun 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)AC 311223.pdf · uploaded 11 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)AC 310324.pdf · uploaded 11 Jan 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)AC 300624.pdf · uploaded 11 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 311223.pdf · uploaded 11 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 3110324.pdf · uploaded 11 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 300624.pdf · uploaded 11 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)EC 30092.pdf · uploaded 11 Jan 2025View

Promoter documents

  • Declaration Form BForm B.pdf · uploaded 6 Nov 2021View
  • Legal Title reportsearch report t_11zon.pdf · uploaded 10 Nov 2021View

Technical documents

  • Building Plan ApprovalSantion Map (2).pdfView
  • Layout Approvallayout (3)_compressed.pdfView

Proforma allotment letter

  • Proforma allotment lettert allotment.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

5B 185/3 Mouje RahatgaonPlot No. 5A

As published on MahaRERA's project page

Plot No. 5A And 5B 185/3 Mouje Rahatgaon

Boundaries

North
Plot No 4 B
South
Plot No 6
East
Road in the layout
West
Approved Layout of survey no 185 1 A

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGovind Tatte—
Chartered accountantCA Raunak Agrawal—
Chartered accountantCA Tapesh Mundada—
EngineerAmar Deshmukh—
OtherRishabh Khandelwal—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology