BLD_007264Completed7 floors

Icon Dreams · Icon Dreams

Amravati (M Corp.) · RERA P50300013147

7Sanctioned habitable floorsregistration certificate
31 Dec 2022Revised completionpromised 31 Dec 2019

Floors

7 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50300013147 · registered 14 Sep 2017
Promised completion
31 Dec 2019
Revised completion
31 Dec 2022
Sanctioned habitable floors
7

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
3BHK46.1 m² (496 sq.ft)1not published
3BHK46.6 m² (502 sq.ft)1not published
3BHK57 m² (613 sq.ft)1not published
3BHK57 m² (614 sq.ft)4not published
3BHK57.5 m² (619 sq.ft)4not published
3BHK60.5 m² (652 sq.ft)1not published
3BHK63.5 m² (683 sq.ft)6not published
3BHK74 m² (797 sq.ft)1not published
Total19

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space000100

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%