Hariganga Heights

Completed

Amravati (M Corp.), Amravati 444606 |Promoter: Kalash Landmarks

31 Aug 2017Registered with MahaRERA
31 Dec 2019Promised completion
1Building
54Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
Flat, Shop54 units in all
Land area for this project
1,035 sq m (11,145 sq ft)
Permissible built-up area
2,097 sq m (22,572 sq ft)
Sanctioned built-up area
2,097 sq m (22,572 sq ft)
Address
Plot No 11 Survey No 12/2PIN 444606
Designated bank account
Akola Janata Commercial Cooperative Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.58836, 73.87469
Hariganga Heights is at latitude 18.58836, longitude 73.87469.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2019

The latest completion date on record passed 6 years and 10 months ago.

Registered
31 Aug 2017
Promised
31 Dec 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030001144631 Aug 201731 Dec 2019—Kalash LandmarksProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Hariganga Heights654

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

54 units registered

Flat · 44 unitsShop · 10 units
TypeCarpet areaUnits
Flat1,458.77 sq m · 15,702 sq ft44
Shop64.01 sq m · 689 sq ft10

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Hariganga Heights

  • Excavation100%
  • Basement (if any)70%
  • Podiums (if any)0%
  • Plinth70%
  • Stilt Floor50%
  • Slabs of Super Structure40%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)WILL BE DONE AS PER SANCTION0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWILL BE DONE AS PER SANCTION0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsWILL BE DONE AS PER SANCTION0%
  • Electrical meter room, sub-station, receiving stationWILL BE DONE AS PER SANCTION0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

16 documents held by Deedo, 20 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 1s

Form 2

Allotment letters

Registration certificate

Form 5

Form 4

Others

Layout plan

Document library

  • Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 14 Aug 2017View
  • Details of encumbrancesNON ECUMBERANCE.pdf · uploaded 14 Aug 2017View
  • Copy of Layout Approval (in case of layout)SANCTION MAP.pdf · uploaded 14 Aug 2017View
  • Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE.pdf · uploaded 15 Aug 2017View
  • Proforma of Allotment letterAGREE 1-ilovepdf-compressed.pdf · uploaded 15 Aug 2017View
  • Proforma of Allotment letterAGREE 2-ilovepdf-compressed.pdf · uploaded 15 Aug 2017View
  • Proforma of Allotment letterAGREE 3-ilovepdf-compressed.pdf · uploaded 15 Aug 2017View
  • Building Plan Approval (IOD)SANCTION MAP.pdf · uploaded 15 Aug 2017View
  • Declaration in FORM Bform b-ilovepdf-compressed.pdf · uploaded 15 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ilovepdf_merged (4)-ilovepdf-compressed.pdf · uploaded 15 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ilovepdf_merged (4).pdf · uploaded 15 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ilovepdf_merged (4)-ilovepdf-compressed.pdf · uploaded 15 Aug 2017View
  • Certificates of CA (Form 5)sign form 5.pdf · uploaded 23 Jan 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Archictek Certificate-ilovepdf-compressed.pdf · uploaded 24 Jan 2019View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 29 Jan 2020View

Promoter documents

  • Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 14 Aug 2017View
  • Declaration Form Bform b-ilovepdf-compressed.pdf · uploaded 15 Aug 2017View

Technical documents

  • Layout ApprovalSANCTION MAP.pdfView
  • Building Plan ApprovalSANCTION MAP.pdfView

Proforma allotment letter

  • Proforma allotment letterAGREE 3-ilovepdf-compressed.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

1112/2PLOT NO 11 SURVEY NO 12/2

As published on MahaRERA's project page

PLOT NO 11 SURVEY NO 12/2

Boundaries

North
Road 9 Meter
South
Plot No 12
East
Road 12 Meter
West
Plot No 9b 10a 10b

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRohit Punshi—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology