Amravati (M Corp.), Amravati 444602 |Promoter: Vijay Nanakram Talda

Residential / Group HousingRERAP50300027635
25 Dec 2020Registered with MahaRERA
1 Jun 2023Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
900 sq m (9,690 sq ft)
Permissible built-up area
561 sq m (6,038 sq ft)
Sanctioned built-up area
561 sq m (6,038 sq ft)
Address
47/4/A/1/1, National Hihway No.6, Nagpur-Amravati Road, Rahatgaon Amravati, Near Nirankari BhavanPIN 444602
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Govindam is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 1 Jun 2023

The latest completion date on record passed 3 years and 4 months ago.

Registered
25 Dec 2020
Promised
1 Jun 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030002763525 Dec 20201 Jun 2023—Vijay Nanakram TaldaProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Govindam2—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00003

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Govindam

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure90%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyTHROUGH BOREWELL ONLY15%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK ONLY40%
  • Storm Water DrainsTHROUGH NATURAL SLOPE OPEN DRAIN0%
  • Landscaping & Tree PlantingNOT YET STARTED0%
  • Street LightingWHEREVER REQUIRED0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking3 OPEN PARKING0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

32 documents held by Deedo, 36 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 2as

Registration certificate

Others

Form 1s

Form 2s

Form 5s

Completion

Form 4

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportTITLE SEARCH GOVINDAM_compressed (1).pdf · uploaded 9 Dec 2020View
  • Copy of Layout Approval (in case of layout)LAYOUT COPY GARDEN CITY.pdf · uploaded 9 Dec 2020View
  • Details of encumbrancesNO ECUMB GOVINDAM.pdf · uploaded 15 Dec 2020View
  • Building Plan Approval / NA Order for plotted developmentBUILDING PLAN APPROVAL.pdf · uploaded 15 Dec 2020View
  • Commencement Certificates / NA Order for plotted developmentCommencement-compressed.pdf · uploaded 15 Dec 2020View
  • Declaration in FORM BAFFIDAVIT GOVINDAM.pdf · uploaded 15 Dec 2020View
  • Proforma of Allotment letterSearch pending GOVINDAM.pdf · uploaded 15 Dec 2020View
  • Disclosure of sold/ booked inventorygovindam.pdf · uploaded 23 Jun 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 GOVINDAM.pdf · uploaded 15 Aug 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 GOVINDAM.pdf · uploaded 15 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A GOVINDAM.pdf · uploaded 15 Aug 2021View
  • Disclosure of sold/ booked inventoryGovindam.pdf · uploaded 20 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Govindam.pdf · uploaded 28 Sep 2021View
  • Disclosure of sold/ booked inventoryRERA GOVINDAM.pdf · uploaded 7 Oct 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1_compressed.pdf · uploaded 15 Oct 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2_compressed.pdf · uploaded 15 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2A.pdf · uploaded 15 Oct 2021View
  • Disclosure of sold/ booked inventoryGovindam.pdf · uploaded 13 Jan 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)GOVINDAM FORM 2.pdf · uploaded 15 Jan 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)GOVINDAM FORM 1.pdf · uploaded 15 Jan 2022View
  • Disclosure of sold/ booked inventoryGovindam 31032022.pdf · uploaded 28 Apr 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Govindam.pdf · uploaded 29 Apr 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Govindam.pdf · uploaded 30 Apr 2022View
  • Disclosure of sold/ booked inventoryGovindam 07042022.pdf · uploaded 15 Jul 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Govindam Form I.pdf · uploaded 2 Aug 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Govindam Form 2.pdf · uploaded 2 Aug 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Govindam.pdf · uploaded 20 Sep 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Govindam FY 2021-22.pdf · uploaded 18 Jan 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGovindam Occupancy Certificate.pdf · uploaded 4 Apr 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Govindam Form 4.pdf · uploaded 4 Apr 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5_2223_Govindam.pdf · uploaded 30 Sep 2023View

Promoter documents

  • Legal Title reportTITLE SEARCH GOVINDAM_compressed (1).pdf · uploaded 9 Dec 2020View
  • Declaration Form BAFFIDAVIT GOVINDAM.pdf · uploaded 15 Dec 2020View

Technical documents

  • Layout ApprovalLAYOUT COPY GARDEN CITY.pdfView
  • Building Plan ApprovalBUILDING PLAN APPROVAL.pdfView

Proforma allotment letter

  • Proforma allotment letterSearch pending GOVINDAM.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

47/4/A/1/1

As published on MahaRERA's project page

47/4/A/1/1

Boundaries

North
Dp Road 18m Wide
South
Open Space
East
Residential Plot
West
Plot No 2

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRohit Punshi—
Chartered accountantGaurava verma—
Engineerpankaj bajaj—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology