BLD_007239Completed8 floors

Bakul · Garden City

Amravati (M Corp.) · RERA P50300014417

8Sanctioned habitable floorsregistration certificate
30 Dec 2026Promised completion

Floors

8 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50300014417 · registered 29 Nov 2017
Promised completion
30 Dec 2026
Sanctioned habitable floors
8

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
COMMERCIAL12.9 m² (139 sq.ft)2not published
COMMERCIAL13 m² (140 sq.ft)2not published
COMMERCIAL13.5 m² (145 sq.ft)2not published
COMMERCIAL13.7 m² (147 sq.ft)2not published
COMMERCIAL14.9 m² (160 sq.ft)4not published
COMMERCIAL15.8 m² (170 sq.ft)4not published
COMMERCIAL21.6 m² (233 sq.ft)2not published
RESIDENTIAL59.5 m² (641 sq.ft)2not published
RESIDENTIAL59.6 m² (642 sq.ft)24not published
Total44

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered00056
Open Space0001

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation90%
  • Basement (if any)90%
  • Podiums (if any)0%
  • Plinth90%
  • Stilt Floor0%
  • Slabs of Super Structure37%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks37%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology