Garden City - Gulmohar

Completed

Amravati (M Corp.), Amravati 444602 |Promoter: Garden City

Residential / Group HousingRERAP50300021825
29 Jul 2019Registered with MahaRERA
30 Mar 2025Promised completion
1Building
28Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
Residential28 units in all
Land area for this project
978 sq m (10,524 sq ft)
Permissible built-up area
2,878 sq m (30,983 sq ft)
Sanctioned built-up area
2,878 sq m (30,983 sq ft)
Address
Field Survey No 128/2, Plot No 1, Ring Road, Navsari, AmravatiPIN 444602
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Garden City - Gulmohar is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Mar 2025

The latest completion date on record passed 1 year and 7 months ago.

Registered
29 Jul 2019
Promised
30 Mar 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030002182529 Jul 201930 Mar 2025—Garden CityProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Gulmohar928

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

28 units registered

Residential · 28 units
TypeCarpet areaUnits
Residential89.27 sq m · 961 sq ft28

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Gulmohar

  • Excavation90%
  • Basement (if any)90%
  • Podiums (if any)0%
  • Plinth90%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
  • Sanitary Fittings within the flats / premises35%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Common areas and amenities

  • Internal Roads & FootpathsAS PER PLAN0%
  • Water SupplyBOREWELL AND PUMP INSTALLED60%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN30%
  • Storm Water DrainsAS PER PLAN0%
  • Landscaping & Tree PlantingAT THE TIME OF COMPLETION OF PROJECT0%
  • Street LightingAS PER PLAN0%
  • Community BuildingsAT THE TIME OF COMPLETION OF PROJECT0%
  • Treatment And Disposal Of Sewage And Sullage WaterWORK IN PROGRESS0%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAT THE TIME OF COMPLETION OF PROJECT0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsN.A0%
  • Electrical meter room, sub-station, receiving stationAS PER REQUIREMENT OF AUTHORITY0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER PLAN0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 19 filings listed on MahaRERA's project page

Title

Commencement certificate

Encumbrance

Form b

Form 1

Form 2s

Registration certificate

Form 5

Form 2a

Form 4

Other

Layout plan

Allotment letter

Document library

  • Copy of Layout Approval (in case of layout)scan copy gulmohar.pdf · uploaded 24 Jul 2019View
  • Building Plan Approval (IOD)scan copy gulmohar.pdf · uploaded 24 Jul 2019View
  • Details of encumbrancesDECLARATION.pdf · uploaded 24 Jul 2019View
  • Proforma of Allotment letterSR.pdf · uploaded 24 Jul 2019View
  • Copy of the legal title reportSEARCH.pdf · uploaded 24 Jul 2019View
  • Declaration in FORM BE.pdf · uploaded 24 Jul 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate.pdf · uploaded 24 Jul 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate(C).pdf · uploaded 24 Jul 2019View
  • Commencement Certificates / NA Order for plotted developmentAMC Permission.pdf · uploaded 24 Jul 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)GULMOHAR.pdf · uploaded 4 Apr 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGULMOHAR.pdf · uploaded 4 Apr 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Gulmohar_20240406_0001_compressed.pdf · uploaded 6 Apr 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)GULMOHAR 19-20.pdf · uploaded 6 Apr 2024View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 GulMohar 20-Apr-2024 11-30-32.pdf · uploaded 22 Apr 2024View

Promoter documents

  • Legal Title reportSEARCH.pdf · uploaded 24 Jul 2019View
  • Declaration Form BE.pdf · uploaded 24 Jul 2019View

Technical documents

  • Layout Approvalscan copy gulmohar.pdfView
  • Building Plan Approvalscan copy gulmohar.pdfView

Proforma allotment letter

  • Proforma allotment letterSR.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

1128/2FIELD SURVEY NO 128/2PLOT NO 1

As published on MahaRERA's project page

FIELD SURVEY NO 128/2, PLOT NO 1

Boundaries

North
Layout Of Fs No 128 By 1
South
Layout Of Fs No 128 By 3
East
12 Metre Wide Road
West
Layout Of Fs No 129

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShailendra Deshmukh & Assosciates—
Chartered accountantKaloti & Lathiya Chartered Accountants—
Chartered accountantVs Jakhotiya & Co—
EngineerSanchit Pradip Patil—
OtherNice Construction—
OtherRaju Thakare—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology