G B Desire

Lapsed

Amravati (M Corp.), Amravati 444606 |Promoter: G B Construction

Residential / Group HousingRERAP50300048120
12 Dec 2022Registered with MahaRERA
31 Mar 2025Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
401 sq m (4,321 sq ft)
Permissible built-up area
1,278 sq m (13,754 sq ft)
Sanctioned built-up area
1,278 sq m (13,754 sq ft)
Planning authority
Amravati Municipal COrporation
Address
FIELD SURVEY NO. 37/1, PLOT NO. 07, MAOUJE BENODA, PRAGANE BADNERA, Madhuban Layout, Dastur Nagar, AMravatiPIN 444606
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
G B Desire is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2025

The latest completion date on record passed 1 year and 7 months ago.

Registered
12 Dec 2022
Promised
31 Mar 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030004812012 Dec 202231 Mar 2025—G B ConstructionProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
G B Desire6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000030
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

G B Desire

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAS PER SANTIONED PLAN0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER SANTIONED PLAN0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAS PER SANTIONED PLAN0%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER SANTIONED PLAN0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER SANTIONED PLAN0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

6 documents held by Deedo, 23 filings listed on MahaRERA's project page

Title report

Encumbrance details (2)

Registration certificate

Other

Layout plan

Document library

  • Copy of the legal title reportLSR_compressed.pdf · uploaded 28 Oct 2022View
  • a Details of encumbrances concerned to FinanceFinancial Encumbrance.pdf · uploaded 28 Oct 2022View
Show all 29 documentsShow fewer documents

Document library

  • b Details of encumbrances concerned to LegalFinancial Encumbrance.pdf · uploaded 28 Oct 2022View
  • Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 28 Oct 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 28 Oct 2022Source
  • Declaration about Commencement CertificateDeclaration about commencement certificate.pdf · uploaded 28 Oct 2022Source
  • Declaration in FORM BForm B - Affidavit cum declaration.pdf · uploaded 28 Oct 2022Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 28 Oct 2022Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 28 Oct 2022Source
  • Deviation Report with respect to Allotment letterDeviation wrt allotment letter.pdf · uploaded 28 Oct 2022Source
  • Deviation Report with respect to model copy of AgreementDeviation wrt Agreement to Sale.pdf · uploaded 28 Oct 2022Source
  • Building Plan Approval / NA Order for plotted developmentGB saction Map.pdf · uploaded 31 Oct 2022Source
  • Proforma of Agreement for saleAgreement to Sale.pdf · uploaded 31 Oct 2022Source
  • CERSAI detailsCERSAI_Search_Report_200251030108_For_Asset_Based_Search_31_10_2022_20_02_37_945.pdf · uploaded 31 Oct 2022Source
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Declaration.pdf · uploaded 31 Oct 2022Source
  • a Details of encumbrances concerned to FinanceLegal Encumbrance.pdf · uploaded 6 Dec 2022View
  • b Details of encumbrances concerned to LegalLegal Encumbrance.pdf · uploaded 6 Dec 2022View
  • Proforma of Allotment letterAllotment Letter.pdf · uploaded 6 Dec 2022Source

Promoter documents

  • Legal Title reportLSR_compressed.pdf · uploaded 28 Oct 2022View
  • Declaration Form BForm B - Affidavit cum declaration.pdf · uploaded 28 Oct 2022Source

Technical documents

  • Layout ApprovalLayout Approval.pdfView
  • Building Plan ApprovalGB saction Map.pdfSource

Proforma allotment letter

  • Proforma allotment letterAllotment Letter.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

0737/1FIELD SURVEY NO. 37/1FIELD SURVEY NO. 37/1PLOT NO. 07PLOT NO. 07

As published on MahaRERA's project page

FIELD SURVEY NO. 37/1, PLOT NO. 07, MAOUJE BENODA, PRAGANE BADNERA

Boundaries

North
Road
South
Service Line
East
Plot No 6
West
Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGirish Nagpure—
Chartered accountantManish Khushlani—
Chartered accountantSkts & Associates—
EngineerAmit Mehare—

Source: MahaRERA project page. Contact details are not shown.