Amber Heritage

Completed

Amravati (M Corp.), Amravati 444601 |Promoter: Amber Builders And Developers

Residential / Group HousingRERAP50300021337
21 Jun 2019Registered with MahaRERA
30 Nov 2020Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
463 sq m (4,982 sq ft)
Permissible built-up area
839 sq m (9,035 sq ft)
Sanctioned built-up area
839 sq m (9,035 sq ft)
Address
Survey No. 8/4, Plot No. 7, Rajapeth, AmravatiPIN 444601
Designated bank account
Yes Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Amber Heritage is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Nov 2020

The latest completion date on record passed 5 years and 11 months ago.

Registered
21 Jun 2019
Promised
30 Nov 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030002133721 Jun 201930 Nov 2020—Amber Builders And DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Amber Heritage5—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Amber Heritage

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAs per Plan100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per Plan100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingAs per Plan100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRain Water Harvesting100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationElectric Meter Room100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 17 filings listed on MahaRERA's project page

Title

Commencement certificate

Form b

Form 1

Form 2

Completion

Registration certificate

Form 4

Other

Allotment letter

Layout plan

Document library

  • Copy of the legal title reportSearch Report.pdf · uploaded 6 Jun 2019View
  • Building Plan Approval (IOD)Layout and Building Plan.pdf · uploaded 6 Jun 2019View
  • Copy of Layout Approval (in case of layout)Layout and Building Plan.pdf · uploaded 6 Jun 2019View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 6 Jun 2019View
  • Details of encumbrancesDeclaration.pdf · uploaded 11 Jun 2019View
  • Details of encumbrancesForm B.pdf · uploaded 11 Jun 2019View
  • Declaration in FORM BForm B.pdf · uploaded 11 Jun 2019View
  • Proforma of Allotment letterDeclaration.pdf · uploaded 11 Jun 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1.pdf · uploaded 13 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2.pdf · uploaded 13 Jun 2019View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 31 Aug 2019View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 28 Jul 2022View

Promoter documents

  • Legal Title reportSearch Report.pdf · uploaded 6 Jun 2019View
  • Declaration Form BForm B.pdf · uploaded 11 Jun 2019View

Technical documents

  • Building Plan ApprovalLayout and Building Plan.pdfView
  • Layout ApprovalLayout and Building Plan.pdfView

Proforma allotment letter

  • Proforma allotment letterDeclaration.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

78/4PLOT NO. 7SURVEY NO. 8/4

As published on MahaRERA's project page

SURVEY NO. 8/4, PLOT NO. 7

Boundaries

North
Layout Plot No 8
South
25 feet wide road in the layout
East
60 feet wide DP Road
West
10 feet wide passage-Road and open space

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGirish Nagpure—
Chartered accountantKaloti & Lathiya Chartered Accountants—
Chartered accountantV S Jakhotiya & Co Chartered Accountants—
EngineerAmit Mehare—
OtherAbhimanyu Rathi—
OtherAshish Monga—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology