Affordable Housing Project Mouja Badnera S No 10/3 Plot Number 8 To 13

Completed

Amravati (M Corp.), Amravati 444601 |Promoter: Pmay Amravati Municipal Corporation

Residential / Group HousingRERAP50300031430
23 Oct 2021Registered with MahaRERA
31 Mar 2022Promised completion
2Buildings
48Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
2
Unit types
1BHK48 units in all
Land area for this project
1,310 sq m (14,101 sq ft)
Permissible built-up area
2,066 sq m (22,242 sq ft)
Sanctioned built-up area
2,066 sq m (22,242 sq ft)
Address
Mouja Badnera S No 10/3 Plot Number 8 To 13, Ambadevi Rajkamal Road, Rajkamal ChowkPIN 444601
Designated bank account
Idbi Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Affordable Housing Project Mouja Badnera S No 10/3 Plot Number 8 To 13 is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Mar 2022

The latest completion date on record passed 4 years and 7 months ago.

Registered
23 Oct 2021
Promised
31 Mar 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030003143023 Oct 202131 Mar 2022—Pmay Amravati Municipal CorporationProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing A1116
Wing B1632

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

48 units registered

1BHK · 48 units
BuildingTypeCarpet areaUnits
Wing A1BHK32.84 sq m · 353 sq ft16
Wing B1BHK32.84 sq m · 353 sq ft32

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Wing AClosed/Covered00007
Wing AOpen Space00000
Wing BClosed/Covered000012
Wing BOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Wing B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL AND MUNICIPAL CORPORATION100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)0100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street Lighting0100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage Water0100%
  • Solid Waste Management And Disposal0100%
  • Water conservation /Rain water harvesting0100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirements0100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

14 documents held by Deedo, 19 filings listed on MahaRERA's project page

Encumbrance

Form b

Form 2a

Commencement certificates

Title

Form 1

Form 2

Registration certificate

Others

Layout plan

Building plan

Document library

  • Details of encumbrancesENCUMBRANCE CERTIFICATE.pdf · uploaded 20 Aug 2021View
  • Declaration in FORM BFORM B_compressed.pdf · uploaded 20 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)QUALITY ASSURANCE CERTIFICATE_compressed.pdf · uploaded 20 Aug 2021View
  • Proforma of Allotment letterAGREEMENT TO SALE PDF.pdf · uploaded 20 Aug 2021Source
  • OtherAADHAR CARD OF SURESH PATIL_compressed.pdf · uploaded 20 Aug 2021Source
  • Copy of Layout Approval (in case of layout)LAYOUT MAP.pdf · uploaded 10 Oct 2021View
  • Building Plan Approval / NA Order for plotted developmentSANCTIONED MAP_compressed.pdf · uploaded 10 Oct 2021View
  • Commencement Certificates / NA Order for plotted developmentBUILDING PERMISSION AND COMMENCMENT CERTIFICATE_compressed.pdf · uploaded 10 Oct 2021View
  • Copy of the legal title reportbadnera 10 3.pdf · uploaded 15 Oct 2021View
  • Declaration about Commencement CertificateBadnera - 10-3.pdf · uploaded 15 Oct 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)BADNERA 10 3 ARCHITECT.pdf · uploaded 15 Oct 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)BADNERA 10 3 ENGINEER_compressed.pdf · uploaded 15 Oct 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 3 Oct 2023Source

Promoter documents

  • Declaration Form BFORM B_compressed.pdf · uploaded 20 Aug 2021View
  • Legal Title reportbadnera 10 3.pdf · uploaded 15 Oct 2021View

Technical documents

  • Layout ApprovalLAYOUT MAP.pdfView
  • Building Plan ApprovalSANCTIONED MAP_compressed.pdfView

Other legal documents

  • OtherAADHAR CARD OF SURESH PATIL_compressed.pdfSource

Proforma allotment letter

  • Proforma allotment letterAGREEMENT TO SALE PDF.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

10/3MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13

As published on MahaRERA's project page

MOUJA BADNERA S NO 10/3 PLOT NUMBER 8 TO 13

Boundaries

North
Road
South
Others Plot
East
Road
West
Plot Number 14

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDeep Mihir Dey—
Chartered accountantS S Shrimali & Associates—
EngineerDeep Mihir Dey—
OtherEco Technology Private Limited—
OtherGannon Dunkerley And Company Limited—
OtherPrashant Ghushe—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology