Skip to content
Deedo home
Menu

Affordable Housing Project 860 Ews In Mhasala - 22part

Completed

Amravati (M Corp.), Amravati 444602 |Promoter: Suresh Bansiji Patil

Residential / Group HousingRERAP50300027865
10 Jan 2021Registered with MahaRERA
30 Sep 2022Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
3
Land area for this project
2,902 sq m (31,237 sq ft)
Permissible built-up area
3,309 sq m (35,620 sq ft)
Sanctioned built-up area
3,309 sq m (35,620 sq ft)
Recreational open space
2,902 sq m (31,237 sq ft)
Address
Survey No 22 Part, Plot No 1 To 16, Back Side Iti College, Near Krushna Nagar, Rahatgaon, Amravati, AmravatiPIN 444602
Designated bank account
Idbi Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Affordable Housing Project 860 Ews In Mhasala - 22part is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Sep 2022

The latest completion date on record passed 4 years and 1 month ago.

Registered
10 Jan 2021
Promised
30 Sep 2022

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030002786510 Jan 202130 Sep 2022—Suresh Bansiji PatilProject page

3 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Affordable Housing Project 860 Ews In Mhasala - 22part Wing AClosed/Covered00000
Affordable Housing Project 860 Ews In Mhasala - 22part Wing AOpen Space00001
Affordable Housing Project 860 Ews In Mhasala - 22part Wing BClosed/Covered00000
Affordable Housing Project 860 Ews In Mhasala - 22part Wing BOpen Space00001
Affordable Housing Project 860 Ews In Mhasala - 22part Wing CClosed/Covered00000
Affordable Housing Project 860 Ews In Mhasala - 22part Wing COpen Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Affordable Housing Project 860 Ews In Mhasala - 22part Wing A

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Affordable Housing Project 860 Ews In Mhasala - 22part Wing B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Affordable Housing Project 860 Ews In Mhasala - 22part Wing C

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsAS PER PLAN100%
  • Water SupplyAS PER PLAN100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN100%
  • Storm Water DrainsAS PER PLAN100%
  • Landscaping & Tree PlantingAS PER PLAN100%
  • Street LightingAS PER PLAN100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAS PER PLAN100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationAS PER PLAN100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingAS PER PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 19 filings listed on MahaRERA's project page

Title

Encumbrance

Commencement certificate

Form b

Form 1

Form 2

Form 2a

Registration certificate

Completion

Form 4

Other

Layout plan

Building plans

Allotment letter

Document library

  • Copy of the legal title reportLegal title.pdf · uploaded 18 Dec 2020View
  • Details of encumbrancesencumbrances.pdf · uploaded 18 Dec 2020View
  • Commencement Certificates / NA Order for plotted developmentpermit.pdf · uploaded 18 Dec 2020View
  • Copy of Layout Approval (in case of layout)layout.pdf · uploaded 18 Dec 2020View
  • Proforma of Allotment letteragreement to sale.pdf · uploaded 18 Dec 2020View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Archietc.pdf · uploaded 18 Dec 2020View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer.pdf · uploaded 18 Dec 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A.pdf · uploaded 18 Dec 2020View
  • Declaration in FORM Baffadavti.pdf · uploaded 18 Dec 2020View
  • Building Plan Approval / NA Order for plotted developmentdraw 1.pdf · uploaded 18 Dec 2020View
  • Building Plan Approval / NA Order for plotted developmentdraw2.pdf · uploaded 18 Dec 2020View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC.pdf · uploaded 3 Oct 2023View
  • Architect’s Certificate on Completion of Project (Form 4)form 4.pdf · uploaded 3 Oct 2023View

Promoter documents

  • Legal Title reportLegal title.pdf · uploaded 18 Dec 2020View
  • Declaration Form Baffadavti.pdf · uploaded 18 Dec 2020View

Technical documents

  • Layout Approvallayout.pdfView
  • Building Plan Approvaldraw 1.pdfView
  • Building Plan Approvaldraw2.pdfView

Proforma allotment letter

  • Proforma allotment letteragreement to sale.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

PLOT NO 1 TO 16SURVEY NO 22 PART

As published on MahaRERA's project page

SURVEY NO 22 PART, PLOT NO 1 TO 16

Boundaries

North
9 M Wide Road
South
Other Layout
East
Plot No 17
West
Other Layout

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDeep Dey—
Chartered accountantJichkar Galani & Co—
EngineerPrashant Ghuse—
OtherGannondunkerley—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology