Adil - 1

Completed

Amravati (M Corp.), Amravati 444602 |Promoter: Adil Construction

Residential / Group HousingRERAP50300018496
12 Nov 2018Registered with MahaRERA
30 Dec 2023Promised completion
1Building
19Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
2BHK, 3BHK, Residential19 units in all
Land area for this project
659 sq m (7,089 sq ft)
Permissible built-up area
1,646 sq m (17,722 sq ft)
Sanctioned built-up area
1,646 sq m (17,722 sq ft)
Address
Plot No. 3, Nazul Plot No. 18, Camp, AmravatiPIN 444602
Designated bank account
Axis Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Dec 2023

The latest completion date on record passed 2 years and 10 months ago.

Registered
12 Nov 2018
Promised
30 Dec 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030001849612 Nov 201830 Dec 2023—Adil ConstructionProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Adil - 1719

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

19 units registered

2BHK · 12 units3BHK · 6 unitsResidential · 1 unit
TypeCarpet areaUnits
2BHK56.8 sq m · 611 sq ft6
2BHK62.64 sq m · 674 sq ft6
3BHK92.34 sq m · 994 sq ft6
Residential100.02 sq m · 1,077 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Adil - 1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises95%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyAs per Plan10%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AS PER PLAN10%
  • Storm Water DrainsAS PER REQUIREMENT0%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalAS PER REQUIREMENT0%
  • Water conservation /Rain water harvestingAs per Plan0%
  • Energy managemcntAs per Plan0%
  • Fire protection and fire safety requirementsAs per Plan0%
  • Electrical meter room, sub-station, receiving stationAS PER REQUIREMENT0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

28 documents held by Deedo, 33 filings listed on MahaRERA's project page

Title

Form b

Allotment letter

Commencement certificates

Form 1s

Form 2s

Registration certificate

Form 5s

Encumbrances

Others

Completion

Form 4

Building plan

Layout plan

Document library

  • Copy of the legal title reportSEARCH REPORT REDUCED.pdf · uploaded 22 Oct 2018View
  • Details of encumbrancesFORM B - PROMOTER REDUCED.pdf · uploaded 22 Oct 2018View
  • Copy of Layout Approval (in case of layout)SANCTION PLAN REDUCED.pdf · uploaded 22 Oct 2018View
  • Proforma of Allotment letterAOS REDUCED.pdf · uploaded 22 Oct 2018View
  • Declaration in FORM BFORM B - PROMOTER REDUCED.pdf · uploaded 22 Oct 2018View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 22 Oct 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 REDUCED.pdf · uploaded 22 Oct 2018View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 REDUCED.pdf · uploaded 22 Oct 2018View
  • Building Plan Approval (IOD)SANCTION PLAN REDUCED.pdf · uploaded 22 Oct 2018View
  • Commencement Certificates / NA Order for plotted developmentCONSTRUCTION PERMISSION REDUCED.pdf · uploaded 22 Oct 2018View
  • OtherDECLARATION REDUCED.pdf · uploaded 22 Oct 2018View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Adil 18-19.pdf · uploaded 14 Oct 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Adil 19-20.pdf · uploaded 14 Oct 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Adil 20-21.pdf · uploaded 14 Oct 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 2 Sep 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 2 Sep 2022View
  • Building Plan Approval (IOD)Adil Construction map scan_compressed.pdf · uploaded 2 Sep 2022View
  • b Details of encumbrances concerned to LegalEncumbrance Legal.pdf · uploaded 3 Sep 2022View
  • Declaration about Commencement CertificateDeclaration about commencement certificate.pdf · uploaded 3 Sep 2022View
  • Disclosure of sold/ booked inventorySold Unsold Declaration.pdf · uploaded 3 Sep 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate Bank.pdf · uploaded 3 Sep 2022View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_31122022.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_31122022.pdf · uploaded 16 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form5_Adil_Construction_2122.pdf · uploaded 16 Feb 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC_20240615_0001.pdf · uploaded 15 Jun 2024View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4_20240615_0001.pdf · uploaded 15 Jun 2024View

Promoter documents

  • Legal Title reportSEARCH REPORT REDUCED.pdf · uploaded 22 Oct 2018View
  • Declaration Form BFORM B - PROMOTER REDUCED.pdf · uploaded 22 Oct 2018View

Technical documents

  • Building Plan ApprovalAdil Construction map scan_compressed.pdfView
  • Layout ApprovalSANCTION PLAN REDUCED.pdfView
  • Building Plan ApprovalSANCTION PLAN REDUCED.pdfView

Other legal documents

  • OtherDECLARATION REDUCED.pdfView

Proforma allotment letter

  • Proforma allotment letterAOS REDUCED.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

183NAZUL PLOT NO. 18PLOT NO. 3

As published on MahaRERA's project page

PLOT NO. 3, NAZUL PLOT NO. 18

Boundaries

North
Layout Plot No 4
South
Layout Plot No 2
East
Road Circuit House To Biyani Chowk
West
Service Line

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMr Satish Deshmukh—
EngineerPankaj Deshmukh—
OtherMr Rajendra Belankar—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology