Adarsh Residency

Lapsed

Amravati (M Corp.), Amravati 444606 |Promoter: Jitendra Keshwani

Residential / Group HousingRERAP50300004588
9 Aug 2017Registered with MahaRERA
31 Dec 2017Promised completion
1Building
15Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Unit types
1BHK, 2BHK, 3BHK15 units in all
Land area for this project
456 sq m (4,908 sq ft)
Permissible built-up area
636 sq m (6,845 sq ft)
Sanctioned built-up area
636 sq m (6,845 sq ft)
Address
Mouje Jevad, Survey No 48PIN 444606
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 18.51657, 73.80368
Adarsh Residency is at latitude 18.51657, longitude 73.80368.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2017

The latest completion date on record passed 8 years and 10 months ago.

Registered
9 Aug 2017
Promised
31 Dec 2017

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P503000045889 Aug 201731 Dec 2017—Jitendra KeshwaniProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Adarsh Residency615

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

15 units registered

1BHK · 1 unit2BHK · 11 units3BHK · 3 units
TypeCarpet areaUnits
1BHK26.71 sq m · 288 sq ft1
2BHK32.34 sq m · 348 sq ft2
2BHK34.31 sq m · 369 sq ft4
2BHK34.32 sq m · 369 sq ft3
2BHK38.89 sq m · 419 sq ft2
3BHK47.16 sq m · 508 sq ft3

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00002
Open Space000061

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Adarsh Residency

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises80%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyFrom Muncipal Corporation100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)STP Installed100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterSeptic Tank100%
  • Solid Waste Management And DisposalSeptic Tank100%
  • Water conservation /Rain water harvestingPits to be provided0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFire Noc and Fire fighting Equipments0%
  • Electrical meter room, sub-station, receiving stationSub Station and Electrical Meters100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

10 documents held by Deedo, 13 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Form 1

Form 2

Registration certificate

Other

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title reportLegal Title Report-ilovepdf-compressed.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesNon Encumbearnce-ilovepdf-compressed.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterUndertaking Against Agreemnet.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BForm B-ilovepdf-compressed.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2-ilovepdf-compressed.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)Layout Plan-ilovepdf-compressed.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)Building Plan-ilovepdf-compressed.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Updated-ilovepdf-compressed.pdf · uploaded 31 Jul 2017View

Promoter documents

  • Legal Title reportLegal Title Report-ilovepdf-compressed.pdf · uploaded 31 Jul 2017View
  • Declaration Form BForm B-ilovepdf-compressed.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalLayout Plan-ilovepdf-compressed.pdfView
  • Building Plan ApprovalBuilding Plan-ilovepdf-compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterUndertaking Against Agreemnet.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

48SURVEY NO 48

As published on MahaRERA's project page

MOUJE JEVAD, SURVEY NO 48

Boundaries

North
Layout Plot No 5
South
40 Ft Road
East
Service Lane And Plot No 2
West
30ft Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShrikant Hinge—
EngineerMangesh Gulhane—
OtherRafuik Bhai—
OtherRihaz Bhai—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology