Aakar Prime

Completed

Amravati (M Corp.), Amravati 444602 |Promoter: Rohit Ashokrao Jiwarkar

Residential / Group HousingRERAP50300049011
24 Jan 2023Registered with MahaRERA
31 Oct 2025Promised completion
1Building
12Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Unit types
3BHK12 units in all
Land area for this project
395 sq m (4,252 sq ft)
Permissible built-up area
1,264 sq m (13,601 sq ft)
Sanctioned built-up area
1,264 sq m (13,601 sq ft)
Address
Plot No 48 Nazul Plot 2 Sheet No 14, CAMP ROAD, AMRAVATI CAMPPIN 444602
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.99745, 73.78980
Aakar Prime is at latitude 19.99745, longitude 73.78980.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Oct 2025

The latest completion date on record passed 1 year ago.

Registered
24 Jan 2023
Promised
31 Oct 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030004901124 Jan 202331 Oct 2025—Rohit Ashokrao JiwarkarProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Aakar Prime1712

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

12 units registered

3BHK · 12 units
TypeCarpet areaUnits
3BHK77.3 sq m · 832 sq ft6
3BHK80.91 sq m · 871 sq ft6

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space000034

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Aakar Prime

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBore well and pump installed100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)As per plan100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingAs per plan100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAs per plan100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

9 documents held by Deedo, 32 filings listed on MahaRERA's project page

Others

Registration certificate

Allotment letter

Building plan

Layout plan

Document library

  • Copy of the legal title reportsearch reportC.pdf · uploaded 10 Nov 2022Source
  • Building Plan Approval / NA Order for plotted developmentSANCTION DRAWING.pdf · uploaded 10 Nov 2022View
  • Copy of Layout Approval (in case of layout)PR card.pdf · uploaded 10 Nov 2022View
  • Commencement Certificates / NA Order for plotted developmentCOMM GOV.pdf · uploaded 10 Nov 2022Source
  • Declaration about Commencement CertificateFormat D.pdf · uploaded 10 Nov 2022Source
  • Declaration in FORM BForm B Affidevit.pdf · uploaded 10 Nov 2022Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1c.pdf · uploaded 10 Nov 2022Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2C.pdf · uploaded 10 Nov 2022Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)From 2A.pdf · uploaded 10 Nov 2022Source
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samebank declaration.pdf · uploaded 16 Nov 2022Source
  • a Details of encumbrances concerned to FinanceNon encum.pdf · uploaded 21 Nov 2022Source
  • b Details of encumbrances concerned to LegalNon encum.pdf · uploaded 21 Nov 2022Source
  • Proforma of Allotment letterAllotment letter.pdf · uploaded 21 Nov 2022View
  • Deviation Report with respect to model copy of Agreementdeviation Agreement.pdf · uploaded 21 Nov 2022Source
  • Deviation Report with respect to Allotment letterdeviation Al.pdf · uploaded 21 Nov 2022Source
  • Proforma of Agreement for salerevisedagreement.pdf · uploaded 16 Dec 2022View
  • a Details of encumbrances concerned to FinanceNon encum aakar.pdf · uploaded 3 Jan 2023Source
  • b Details of encumbrances concerned to LegalNon encum aakar.pdf · uploaded 3 Jan 2023Source
  • Disclosure of Interest in Other Real Estate OrganizationsAdobe Scan 03-Jan-2023.pdf · uploaded 3 Jan 2023Source
  • Other – FinanceRERA REPLY.pdf · uploaded 9 Jan 2023View
  • CERSAI detailsCERSAI_Search_Report_200257632305_For_Asset_Based_Search_16_01_2023_14_12_06_528.pdf · uploaded 16 Jan 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)akar f1q1.pdf · uploaded 28 Jul 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)akar f2q1.pdf · uploaded 28 Jul 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)akar f2aq1.pdf · uploaded 28 Jul 2023Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentROHIT SIR.pdf · uploaded 23 Mar 2024Source
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4 AAKAR.pdf · uploaded 13 Apr 2024Source

Promoter documents

  • Legal Title reportsearch reportC.pdf · uploaded 10 Nov 2022Source
  • Declaration Form BForm B Affidevit.pdf · uploaded 10 Nov 2022Source

Technical documents

  • Building Plan ApprovalSANCTION DRAWING.pdfView
  • Layout ApprovalPR card.pdfView

Financial documents

  • Other – FinanceRERA REPLY.pdf · uploaded 9 Jan 2023View

Proforma allotment letter

  • Proforma allotment letterAllotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

2Plot No 48 Nazul Plot 2 Sheet No 14

As published on MahaRERA's project page

Plot No 48 Nazul Plot 2 Sheet No 14

Boundaries

North
Plot No 49
South
Plot No 47
East
Road
West
Service Lane

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectTejas P Patil—
Chartered accountantMs Paresh R Sahu Co—
EngineerRitesh J Laddha—

Source: MahaRERA project page. Contact details are not shown.