BLD_007068Extended 43 mo6 floors
Building 1 · Nisarg Garden
Chandur · Phase Nisarg Garden Wing P · RERA P50100027492
6Sanctioned habitable floorsregistration certificate
31 Dec 2026Revised completionpromised 30 May 2023
Floors
6 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.
As registered
- RERA registration
- P50100027492 · registered 14 Dec 2020
- Promised completion
- 30 May 2023
- Revised completion
- 31 Dec 2026
- Sanctioned habitable floors
- 6
- Phase
- Nisarg Garden Wing P
Unit inventory
Apartments and other units by type, from MahaRERA's project page.
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 40.5 m² (436 sq.ft) | 8 | not published |
| 1BHK | 42 m² (452 sq.ft) | 8 | not published |
| Shop | 9.8 m² (105 sq.ft) | 1 | not published |
| Shop | 10.4 m² (112 sq.ft) | 2 | not published |
| Shop | 10.9 m² (118 sq.ft) | 2 | not published |
| Shop | 12.5 m² (135 sq.ft) | 2 | not published |
| Shop | 12.7 m² (137 sq.ft) | 2 | not published |
| Shop | 13 m² (140 sq.ft) | 2 | not published |
| Total | 27 |
Parking
Spaces as declared on MahaRERA's project page.
| Type | Two-wheeler | Four-wheeler | Visitor | Total |
|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 1 |
| Open Space | 0 | 0 | 0 | 0 |
Construction progress
Work completed on this building, as the promoter reported it to MahaRERA (Form 1).
- Excavation100%
- Basement (if any)100%
- Podiums (if any)0%
- Plinth100%
- Stilt Floor0%
- Slabs of Super Structure10%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
- Sanitary Fittings within the flats / premises0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology