Skip to content

Prabhukunj Appartment

Completed

Yavatmal (M Cl), Yavatmal 445001 |Promoter: Tuljai Developers

17 Aug 2017Registered with MahaRERA
31 Dec 2019Promised completion
1Building
13Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
Shop, Type 1, Type 2, Type 313 units in all
Land area for this project
520 sq m (5,595 sq ft)
Permissible built-up area
941 sq m (10,126 sq ft)
Sanctioned built-up area
941 sq m (10,126 sq ft)
Address
S No 9/1 A Plot 1PIN 445001
Designated bank account
Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.38786, 78.09496
Prabhukunj Appartment is at latitude 20.38786, longitude 78.09496.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2019

The latest completion date on record passed 6 years and 10 months ago.

Registered
17 Aug 2017
Promised
31 Dec 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5100000745917 Aug 201731 Dec 2019—Tuljai DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Prabhukunj Appartment313

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

13 units registered

Shop · 4 unitsType 1 · 1 unitType 2 · 4 unitsType 3 · 4 units
TypeCarpet areaUnits
Shop18.17 sq m · 196 sq ft4
Type 174.77 sq m · 805 sq ft1
Type 264.88 sq m · 698 sq ft4
Type 372.87 sq m · 784 sq ft4

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00000
Open Space00009

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Prabhukunj Appartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor90%
  • Slabs of Super Structure50%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL10%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK0%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingROOF WATER HARVESTING0%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationMETER BOX ONLY0%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open Parking9 CARS0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

15 documents held by Deedo, 17 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1

Form 2

Registration certificate

Form 5

Show all 32 documentsShow fewer documents

Occupancy / completion certificate

  • Occupancy / completion certificate27 Dec 2019ViewSource

Form 4

Other (2)

Layout plan

Building plan

Allotment letter

Document library

  • Copy of the legal title report712 ferfar.pdf · uploaded 31 Jul 2017View
  • Details of encumbrancesno encumbrances.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BForm B Affidavit.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect.pdf · uploaded 31 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentComencment.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Engineer.pdf · uploaded 31 Jul 2017View
  • Building Plan Approval (IOD)Map Sanctioned.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)LAYOUT.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterAnnexure A.pdf · uploaded 31 Jul 2017View
  • Certificates of CA (Form 5)Form 5.pdf · uploaded 15 Dec 2018View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentoc.pdf · uploaded 27 Dec 2019View
  • Architect’s Certificate on Completion of Project (Form 4)form 4.pdf · uploaded 27 Dec 2019View

Promoter documents

  • Legal Title report712 ferfar.pdf · uploaded 31 Jul 2017View
  • Declaration Form BForm B Affidavit.pdf · uploaded 31 Jul 2017View

Technical documents

  • Building Plan ApprovalMap Sanctioned.pdfView
  • Layout ApprovalLAYOUT.pdfView

Proforma allotment letter

  • Proforma allotment letterAnnexure A.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Yavatmal (M Cl), Yavatmal taluka

Survey, CTS, gat or plot numbers

1S NO 9/1 A PLOT 1

As published on MahaRERA's project page

S NO 9/1 A PLOT 1

Boundaries

North
Road
South
Plot 37 38
East
Part Of S No 9
West
Plot No 2

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRahul Sangle—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology