Skip to content
Deedo home
Menu

Sai Shopping Complex

Completed

Ghatanji (M Cl), Yavatmal 445301 |Promoter: Sai Developers

15 Sep 2017Registered with MahaRERA
1 Aug 2020Promised completion
2Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
2
Land area for this project
1,242 sq m (13,368 sq ft)
Permissible built-up area
1,238 sq m (13,325 sq ft)
Sanctioned built-up area
1,238 sq m (13,325 sq ft)
Address
3, 4/73, 76.2PIN 445301
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.07992, 72.91744
Sai Shopping Complex is at latitude 19.07992, longitude 72.91744.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 1 Aug 2020

The latest completion date on record passed 6 years and 2 months ago.

Registered
15 Sep 2017
Promised
1 Aug 2020

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5100001317115 Sep 20171 Aug 2020—Sai DevelopersProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building B3—
Sai Shopping Complex A Type3—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Building BClosed/Covered00001
Building BOpen Space00000
Sai Shopping Complex A TypeClosed/Covered00000
Sai Shopping Complex A TypeOpen Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building B

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Sai Shopping Complex A Type

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK100%
  • Storm Water Drains300MM HUME PIPE100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingPIPELINES DONE50%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingPARKING AS DESIGNATED AS P2 IN PLAN100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

17 documents held by Deedo, 22 filings listed on MahaRERA's project page

Title report

Commencement certificate

Form B

Form 1

Form 2

Allotment letter (3)

Show all 39 documentsShow fewer documents

Occupancy / completion certificate

  • Occupancy / completion certificate25 Nov 2019ViewSource

Registration certificate

Form 2A

Form 5

Form 4

Other (2)

Layout plan

Building plan

Document library

  • Copy of the legal title reportTitle Certificate.pdf · uploaded 5 Sep 2017View
  • Details of encumbrancesTitle Certificate.pdf · uploaded 5 Sep 2017View
  • Copy of Layout Approval (in case of layout)LAYOUT PLAN.pdf · uploaded 5 Sep 2017View
  • Declaration in FORM BDeclaration.pdf · uploaded 5 Sep 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)02_Architect's Certificate.PDF · uploaded 5 Sep 2017View
  • Building Plan Approval (IOD)Sanction plan.pdf · uploaded 5 Sep 2017View
  • Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 5 Sep 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER’S CERTIFICATE.pdf · uploaded 5 Sep 2017View
  • OtherAMALGAMATION.pdf · uploaded 5 Sep 2017View
  • Proforma of Allotment letterSale-Deed-1-6.pdf · uploaded 5 Sep 2017View
  • Proforma of Allotment letterSale-Deed-7-12.pdf · uploaded 5 Sep 2017View
  • Proforma of Allotment letterSale-Deed-13-18.pdf · uploaded 5 Sep 2017View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentUntitled-3_compressed.pdf · uploaded 25 Nov 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)sai develpers 222.pdf · uploaded 6 Aug 2020View
  • Architect’s Certificate on Completion of Project (Form 4)sai developers 111.pdf · uploaded 6 Aug 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)anual report.pdf · uploaded 6 Aug 2020View

Promoter documents

  • Legal Title reportTitle Certificate.pdf · uploaded 5 Sep 2017View
  • Declaration Form BDeclaration.pdf · uploaded 5 Sep 2017View

Technical documents

  • Layout ApprovalLAYOUT PLAN.pdfView
  • Building Plan ApprovalSanction plan.pdfView

Other legal documents

  • OtherAMALGAMATION.pdfView

Proforma allotment letter

  • Proforma allotment letterSale-Deed-7-12.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

Survey, CTS, gat or plot numbers

34/7376.2

As published on MahaRERA's project page

3,4/73,76.2

Boundaries

North
9 M Wide Layout Road
South
Open Plots Of Other Layout
East
Plot No 5 To 10
West
Service Road And Main Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnand Jain—
ArchitectAnand Jain—
ArchitectAnand Jain—
ArchitectAnand Jain—
OtherShrikant Shaligram Meher—
OtherShrikant Shaligram Meher—
OtherShrikant Shaligram Meher—
OtherShrikant Shaligram Meher—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology