BLD_007107Completed2 floors

B Wing · Maratha Commercial Complex

Washim (M Cl) · RERA P50200051851

2Sanctioned habitable floorsregistration certificate
31 Aug 2024Promised completion

Floors

2 sanctioned habitable floors, as registered. MahaRERA doesn't publish flat-by-flat records, so floors are shown without flats.

As registered

RERA registration
P50200051851 · registered 7 Jul 2023
Promised completion
31 Aug 2024
Sanctioned habitable floors
2

Unit inventory

Apartments and other units by type, from MahaRERA's project page.

TypeCarpet areaUnitsBooked
Shop21.5 m² (232 sq.ft)5not published
Shop23.9 m² (258 sq.ft)57not published
Shop26.6 m² (287 sq.ft)3not published
Shop31.2 m² (336 sq.ft)2not published
Shop31.3 m² (336 sq.ft)10not published
Shop35.8 m² (386 sq.ft)1not published
Shop39.5 m² (425 sq.ft)3not published
Shop39.7 m² (427 sq.ft)3not published
Shop44 m² (474 sq.ft)2not published
Shop46 m² (495 sq.ft)5not published
Shop80.8 m² (870 sq.ft)1not published
Shop123.8 m² (1,332 sq.ft)1not published
Total93

Parking

Spaces as declared on MahaRERA's project page.

TypeTwo-wheelerFour-wheelerVisitorTotal
Closed/Covered0000
Open Space000191

Construction progress

Work completed on this building, as the promoter reported it to MahaRERA (Form 1).

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Data through9 Oct 2026SourcesMahaRERA registration certificate · MahaRERA project pageFloors and units are as registered; a promoter can revise them in later filings.Methodology