Maratha Commercial Complex

Completed

Washim (M Cl), Washim 444505 |Promoter: Dhanlakshmi Builders And Developers

7 Jul 2023Registered with MahaRERA
31 Aug 2024Promised completion
2Buildings
164Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Completed
Buildings
2
Unit types
Shop164 units in all
Land area for this project
11,149 sq m (1,20,001 sq ft)
Permissible built-up area
10,527 sq m (1,13,312 sq ft)
Sanctioned built-up area
10,527 sq m (1,13,312 sq ft)
Address
Plot No. 1 S.N. 323/1 & 324/1, WASHIM RISOD ROAD, RISOD NAKAPIN 444505
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.11146, 77.12661
Maratha Commercial Complex is at latitude 20.11146, longitude 77.12661.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Aug 2024

The latest completion date on record passed 2 years and 2 months ago.

Registered
7 Jul 2023
Promised
31 Aug 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P502000518517 Jul 202331 Aug 2024—Dhanlakshmi Builders And DevelopersProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
A Wing271
B Wing293

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

164 units registered

Shop · 164 units
BuildingTypeCarpet areaUnits
A WingShop35.83 sq m · 386 sq ft64
A WingShop46 sq m · 495 sq ft6
A WingShop107.16 sq m · 1,153 sq ft1
B WingShop21.53 sq m · 232 sq ft5
B WingShop23.93 sq m · 258 sq ft57
B WingShop26.62 sq m · 287 sq ft3
B WingShop31.2 sq m · 336 sq ft2
B WingShop31.26 sq m · 336 sq ft10
B WingShop35.83 sq m · 386 sq ft1
B WingShop39.5 sq m · 425 sq ft3
B WingShop39.7 sq m · 427 sq ft3
B WingShop44.03 sq m · 474 sq ft2
B WingShop46 sq m · 495 sq ft5
B WingShop80.83 sq m · 870 sq ft1
B WingShop123.76 sq m · 1,332 sq ft1

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A WingClosed/Covered00000
A WingOpen Space0000112
B WingClosed/Covered00000
B WingOpen Space0000191

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

A Wing

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B Wing

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsInternal Roads & Footpaths100%
  • Water SupplyNot applicable
  • Sewerage (Chamber, Lines, Septic Tank , STP)Sewerage lines and Septic Tank for common washroom0%
  • Storm Water DrainsStorm Water Drains100%
  • Landscaping & Tree PlantingTree Planting0%
  • Street LightingStreet Lighting0%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFire Protection And Fire Safety as per standard100%
  • Electrical meter room, sub-station, receiving stationElectrical Meter Room80%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingOpen Parking0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

22 documents held by Deedo, 47 filings listed on MahaRERA's project page

Encumbrances

Form 1s

Commencement certificates

Form b

Titles

Registration certificate

Other

Layout plan

Building plans

Document library

  • b Details of encumbrances concerned to Legal4 1 bself declaration.pdf · uploaded 11 Oct 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 11 Oct 2022View
  • CERSAI detailsCERSAI_Search_Report_200249333824_For_Asset_Based_Search_11_10_2022_17_26_16_071.pdf · uploaded 11 Oct 2022Source
  • CERSAI detailsCERSAI_Search_Report_200249336536_For_Asset_Based_Search_11_10_2022_17_34_55_899.pdf · uploaded 11 Oct 2022Source
  • Copy of Layout Approval (in case of layout)Layout Approval scan first floor a,b_11zon.pdf · uploaded 11 Oct 2022View
  • Building Plan Approval / NA Order for plotted development1 A Wing Exit Ground Floor.pdf · uploaded 11 Oct 2022View
  • Building Plan Approval / NA Order for plotted development1 Basement Floor A Wing_11zon.pdf · uploaded 11 Oct 2022View
  • Building Plan Approval / NA Order for plotted development2 B Wing Basement Ground And First Floor_11zon.pdf · uploaded 11 Oct 2022View
  • Building Plan Approval / NA Order for plotted development2 B Wing Existing Ground And Prop First Floor.pdf · uploaded 11 Oct 2022View
  • Building Plan Approval / NA Order for plotted development2 Basement Floor B Wing_11zon.pdf · uploaded 11 Oct 2022View
  • a Details of encumbrances concerned to FinanceEncub Fin.pdf · uploaded 11 Oct 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER FROM 2.pdf · uploaded 13 Oct 2022Source
  • a Details of encumbrances concerned to FinanceSign_Encumbrances.pdf · uploaded 20 Nov 2022View
  • b Details of encumbrances concerned to LegalSign_Encumbrances.pdf · uploaded 20 Nov 2022View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSign_Bank Account.pdf · uploaded 20 Nov 2022Source
  • Deviation Report with respect to Allotment letterSign_No Allotment Letter.pdf · uploaded 20 Nov 2022Source
  • Deviation Report with respect to model copy of AgreementSign_No Allotment Letter.pdf · uploaded 20 Nov 2022Source
  • Building Plan Approval / NA Order for plotted developmentsanction map323 1 AND 324 1_compressed.pdf · uploaded 12 Jan 2023View
  • Proforma of Agreement for saleAFS.pdf · uploaded 13 Feb 2023Source
  • Other – TechnicalOTHER.pdf · uploaded 13 Feb 2023Source
  • Commencement Certificates / NA Order for plotted developmentNew_MNC Construction Approval Certificate.pdf · uploaded 13 Feb 2023View
  • Proforma of Allotment letterALLOT 2-7_merged.pdf · uploaded 13 Feb 2023Source
  • Commencement Certificates / NA Order for plotted developmentCert_P_96360_75M5anJSign (1)_compressed.pdf · uploaded 12 Jun 2023View
  • Declaration in FORM BCCI12062023_000311.pdf · uploaded 12 Jun 2023View
  • Declaration about Commencement CertificateFormat – D Declaration 12062023 with Photo.pdf · uploaded 13 Jun 2023View
  • Copy of the legal title report26062023_compressed.pdf · uploaded 27 Jun 2023View
  • Copy of the legal title report26062023_0001_compressed.pdf · uploaded 27 Jun 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A Partner Declaration.pdf · uploaded 27 Jun 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 FOrm 02.pdf · uploaded 27 May 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3 FOrm 02.pdf · uploaded 27 May 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 FOrm 01.pdf · uploaded 27 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 FOrm 01.pdf · uploaded 27 May 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 FOrm 01.pdf · uploaded 27 May 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 FOrm 02 (1).pdf · uploaded 31 May 2024Source
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certicate.pdf · uploaded 6 Jun 2024Source
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 6 Jun 2024Source

Promoter documents

  • Declaration Form BCCI12062023_000311.pdf · uploaded 12 Jun 2023View
  • Legal Title report26062023_compressed.pdf · uploaded 27 Jun 2023View
  • Legal Title report26062023_0001_compressed.pdf · uploaded 27 Jun 2023View

Technical documents

  • Layout ApprovalLayout Approval scan first floor a,b_11zon.pdfView
  • Building Plan Approval1 A Wing Exit Ground Floor.pdfView
  • Building Plan Approval1 Basement Floor A Wing_11zon.pdfView
  • Building Plan Approval2 B Wing Basement Ground And First Floor_11zon.pdfView
  • Building Plan Approval2 B Wing Existing Ground And Prop First Floor.pdfView
  • Building Plan Approval2 Basement Floor B Wing_11zon.pdfView
  • Building Plan Approvalsanction map323 1 AND 324 1_compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOT 2-7_merged.pdfSource

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Washim (M Cl), Washim taluka

Survey, CTS, gat or plot numbers

1324/1Plot No. 1 S.N. 323/1

As published on MahaRERA's project page

Plot No. 1 S.N. 323/1 & 324/1

Boundaries

North
Remaining Land Of 324
South
Risod Road
East
Remaining Field Of Survey No 323
West
Field Of Survey No 321

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMahavir Badjatia—
Chartered accountantCa Pankaj Badlani—
EngineerPratik Varma—

Source: MahaRERA project page. Contact details are not shown.