Seloo, Wardha 442104 |Promoter: Rajesh Motilal Jaiswal

12 Jan 2023Registered with MahaRERA
31 Dec 2025Promised completion
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Plotted
Status on MahaRERA
Completed
Land area for this project
4,537 sq m (48,838 sq ft)
Permissible built-up area
4,537 sq m (48,838 sq ft)
Sanctioned built-up area
0 sq m (0 sq ft)
Recreational open space
813 sq m (8,754 sq ft)
Planning authority
Chief Officer Seloo
Address
102/A/3, Survey No 102/A/3 Mauja Seloo Tah Seloo Dist Wardha, Survey No 102/A/3 Mauja Seloo Tah Seloo Dist WardhaPIN 442104
Designated bank account
Hdfc Bank
Developed in phases
No
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Raavee Ki Nagari is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2025

The latest completion date on record passed 10 months ago.

Registered
12 Jan 2023
Promised
31 Dec 2025

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5040004869812 Jan 202331 Dec 2025—Rajesh Motilal JaiswalProject page

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Building

  • ExcavationNot applicable
  • Basement (if any)Not applicable
  • Podiums (if any)Not applicable
  • PlinthNot applicable
  • Stilt FloorNot applicable
  • Slabs of Super StructureNot applicable
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
  • Sanitary Fittings within the flats / premisesNot applicable
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Common areas and amenities

  • Internal Roads & Footpathscomplete100%
  • Water SupplyBOREWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Not applicable
  • Storm Water DrainsNALI100%
  • Landscaping & Tree Plantingcomplete100%
  • Street Lightingcomplete100%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationcomplete100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

34 documents held by Deedo, 108 filings listed on MahaRERA's project page

Titles

Encumbrance

Commencement certificates

Form b

Others

Registration certificate

Form 1s

Form 2a

Form 5

Form 2s

Completion

Layout plan

Allotment letter

Document library

  • Copy of the legal title reportSEARCH_PART 1.pdf · uploaded 19 Nov 2022View
  • Copy of the legal title reportSEARCH_PART 2.pdf · uploaded 19 Nov 2022View
  • Copy of the legal title reportSEARCH_PART 3.pdf · uploaded 19 Nov 2022View
  • Copy of the legal title reportSEARCH_PART 4.pdf · uploaded 19 Nov 2022View
  • Copy of the legal title reportSEARCH_PART 5.pdf · uploaded 19 Nov 2022View
  • a Details of encumbrances concerned to FinanceENCUMBRANCE.pdf · uploaded 19 Nov 2022View
  • b Details of encumbrances concerned to LegalENCUMBRANCE.pdf · uploaded 19 Nov 2022View
  • Copy of Layout Approval (in case of layout)SANCTIONED MAP.pdf · uploaded 19 Nov 2022View
  • Building Plan Approval / NA Order for plotted developmentNA ORDER.pdf · uploaded 19 Nov 2022View
  • Commencement Certificates / NA Order for plotted developmentNA ORDER.pdf · uploaded 19 Nov 2022View
  • Declaration about Commencement CertificateFORMAT D.pdf · uploaded 19 Nov 2022View
  • Declaration in FORM BFORM B.pdf · uploaded 19 Nov 2022View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 19 Nov 2022View
  • Disclosure of sold/ booked inventoryBOOK SOLD INVENTORY.pdf · uploaded 19 Nov 2022Source
  • CERSAI detailsDECLARATION_CERSAI.pdf · uploaded 19 Nov 2022Source
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDECLARATION_SEPERATE BANK ACCOUNT.pdf · uploaded 19 Nov 2022Source
  • Deviation Report with respect to Allotment letterDEVIATION_ PROFORMA OF ALLOTMENT LETTER.pdf · uploaded 19 Nov 2022Source
  • CERSAI detailsCERSAI_Search_Report_200252678589_For_Asset_Based_Search_19_11_2022_18_51_47_411.pdf · uploaded 19 Nov 2022Source
  • Proforma of Agreement for saleAGREEMENT FOR SALE.pdf · uploaded 19 Dec 2022View
  • Deviation Report with respect to model copy of AgreementDEVIATION_ PROFORMA OF AGREEMENT TO SALE.pdf · uploaded 19 Dec 2022Source
  • Disclosure of Interest in Other Real Estate OrganizationsDECLA_ Rajesh.pdf · uploaded 6 Jan 2023Source
  • Disclosure of sold/ booked inventorybooked sold inventory_31-03-2023.pdf · uploaded 10 Nov 2023Source
  • Disclosure of sold/ booked inventoryBooked sold inventory_30-06-2023.pdf · uploaded 10 Nov 2023Source
  • Disclosure of sold/ booked inventoryBooked sold inventory_ 30-09-2023.pdf · uploaded 10 Nov 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form 1_31-03-2023.pdf · uploaded 10 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Form 1_30-06-2023.pdf · uploaded 10 Nov 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)3 Form 1_30-09-2023.pdf · uploaded 10 Nov 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)1 Form 2_31-03-2023.pdf · uploaded 10 Nov 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Form 2_30-06-2023.pdf · uploaded 10 Nov 2023Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)3 Form 2_30-09-2023.pdf · uploaded 10 Nov 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A_31-03-2023.pdf · uploaded 10 Nov 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5_ 22-23.pdf · uploaded 2 Dec 2023Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_31-03-2023.pdf · uploaded 28 Feb 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_30-06-2023.pdf · uploaded 28 Feb 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_30-09-2023.pdf · uploaded 28 Feb 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)self declaration.pdf · uploaded 28 Feb 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_31-03-2023.pdf · uploaded 28 Feb 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_30-06-2023.pdf · uploaded 28 Feb 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 1_30-09-2023.pdf · uploaded 28 Feb 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)self declaration.pdf · uploaded 28 Feb 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_31032024.pdf · uploaded 26 Dec 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_3062024.pdf · uploaded 26 Dec 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)DECLARATION_30092024.pdf · uploaded 26 Dec 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_31032024.pdf · uploaded 26 Dec 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_30062024.pdf · uploaded 26 Dec 2024Source
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)DECLARATION_30092024.pdf · uploaded 26 Dec 2024View
  • Disclosure of sold/ booked inventorysold inventory date 31_03_2024.pdf · uploaded 26 Dec 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A_31032024.pdf · uploaded 26 Dec 2024View
  • Disclosure of sold/ booked inventorysold inventory date 30_06_2024.pdf · uploaded 26 Dec 2024View
  • Disclosure of sold/ booked inventorysold inventory date 30_09_2024.pdf · uploaded 26 Dec 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5_31032024.pdf · uploaded 26 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)7 FORM 1_31122024.pdf · uploaded 13 May 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)8 FORM 1_31032025.pdf · uploaded 13 May 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)7 from 2 date 31 12 2024.pdf · uploaded 13 May 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)8 from 2 date 31 03 2025.pdf · uploaded 13 May 2025View
  • Disclosure of sold/ booked inventorysold inventory date 31 12 2024.pdf · uploaded 13 May 2025View
  • Disclosure of sold/ booked inventorysold inventory date 31 3 2025.pdf · uploaded 13 May 2025View
  • Form 11 Form 1_31-03-2023.pdf · uploaded 30 Jul 2025View
  • Form 21 Form 2_31-03-2023.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked Inventorybooked sold inventory_31-03-2023.pdf · uploaded 30 Jul 2025Source
  • Form 12 Form 1_30-06-2023.pdf · uploaded 30 Jul 2025View
  • Form 22 Form 2_30-06-2023.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked InventoryBooked sold inventory_30-06-2023.pdf · uploaded 30 Jul 2025Source
  • Form 13 Form 1_30-09-2023.pdf · uploaded 30 Jul 2025View
  • Form 23 Form 2_30-09-2023.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked InventoryBooked sold inventory_ 30-09-2023.pdf · uploaded 30 Jul 2025Source
  • Form 14 self declaration_31122023.pdf · uploaded 30 Jul 2025Source
  • Form 24 self declaration_31122023.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked Inventory4 self declaration_31122023.pdf · uploaded 30 Jul 2025Source
  • Form 14 FORM 1_31032024.pdf · uploaded 30 Jul 2025Source
  • Form 24 FORM 2_31032024.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold inventory date 31_03_2024.pdf · uploaded 30 Jul 2025View
  • Form 15 FORM 1_3062024.pdf · uploaded 30 Jul 2025Source
  • Form 25 FORM 2_30062024.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold inventory date 30_06_2024.pdf · uploaded 30 Jul 2025View
  • Form 16 DECLARATION_30092024.pdf · uploaded 30 Jul 2025Source
  • Form 26 DECLARATION_30092024.pdf · uploaded 30 Jul 2025Source
  • Disclosure of Sold and Booked Inventory6 DECLARATION_30092024.pdf · uploaded 30 Jul 2025Source
  • Form 17 FORM 1_31122024.pdf · uploaded 30 Jul 2025View
  • Form 27 from 2 date 31 12 2024.pdf · uploaded 30 Jul 2025View
  • Disclosure of Sold and Booked Inventorysold inventory date 31 12 2024.pdf · uploaded 30 Jul 2025View
  • Form 18 FORM 1_31032025.pdf · uploaded 30 Jul 2025View
  • Form 28 from 2 date 31 03 2025.pdf · uploaded 30 Jul 2025View
  • Disclosure of Sold and Booked Inventorysold inventory date 31 3 2025.pdf · uploaded 30 Jul 2025View
  • Withdrawal Update Form 18 FORM 1_31032025.pdf · uploaded 30 Jul 2025View
  • Withdrawal Update Form 2self declaration.pdf · uploaded 30 Jul 2025View
  • Withdrawal Update Form 18 FORM 1_31032025.pdf · uploaded 30 Jul 2025View
  • Withdrawal Update Form 2self declaration.pdf · uploaded 30 Jul 2025View
  • Withdrawal Update Form 1NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 2NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 1NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 2NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 1NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 2NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 1NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 2NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 1NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Withdrawal Update Form 2NIL REPORT_30092025.pdf · uploaded 17 Oct 2025View
  • Completion CertificateCOMPLETION_ALL DOCS.pdf · uploaded 29 Dec 2025View

Promoter documents

  • Legal Title reportSEARCH_PART 1.pdf · uploaded 19 Nov 2022View
  • Legal Title reportSEARCH_PART 2.pdf · uploaded 19 Nov 2022View
  • Legal Title reportSEARCH_PART 3.pdf · uploaded 19 Nov 2022View
  • Legal Title reportSEARCH_PART 4.pdf · uploaded 19 Nov 2022View
  • Legal Title reportSEARCH_PART 5.pdf · uploaded 19 Nov 2022View
  • Declaration Form BFORM B.pdf · uploaded 19 Nov 2022View

Technical documents

  • Layout ApprovalSANCTIONED MAP.pdfView
  • NA Order for Plotted DevelopmentNA ORDER.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Seloo, Seloo taluka

Survey, CTS, gat or plot numbers

102/A/3

As published on MahaRERA's project page

102/A/3

Boundaries

North
Survey No 102-A-4
South
Survey No 101
East
12m Service Road
West
Survey No 102-B-1

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectD S Bhaisare—
Chartered accountantDarshan Wakhariya—
EngineerSanjay Kakde—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology