Pratapgad Apartment

Lapsed

Pipri (Ct), Wardha 442001 |Promoter: Pioneer Builders

Residential / Group HousingRERAP50400031868
22 Nov 2021Registered with MahaRERA
31 Dec 2024Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Lapsed
Buildings
1
Land area for this project
432 sq m (4,652 sq ft)
Permissible built-up area
964 sq m (10,378 sq ft)
Sanctioned built-up area
964 sq m (10,378 sq ft)
Recreational open space
0 sq m (0 sq ft)
Address
Survey No 321/1 Plot No 1, Pipri Meghe, WardhaPIN 442001
Designated bank account
Hdfc Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Pratapgad Apartment is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2024

The latest completion date on record passed 1 year and 10 months ago.

Registered
22 Nov 2021
Promised
31 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5040003186822 Nov 202131 Dec 2024—Pioneer BuildersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Pratapgad Apartment6—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00001
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Pratapgad Apartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOREWELL AND SUPPLY FROM JEEVAN PRADHIKARAN100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationELECTRIC METER ROOM100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

21 documents held by Deedo, 34 filings listed on MahaRERA's project page

Others

Allotment letters

Form b

Title

Registration certificate

Form 5s

Form 1

Form 2s

Form 2a

Completion

Form 4

Layout plan

Document library

  • Details of encumbrancesENCUMBRANCE CERTIFICATE.pdf · uploaded 2 Oct 2021Source
  • Copy of Layout Approval (in case of layout)LAYOUT MAP.pdf · uploaded 2 Oct 2021View
  • Building Plan Approval / NA Order for plotted developmentSANCTION MAP_BUILDING.pdf · uploaded 2 Oct 2021Source
  • Commencement Certificates / NA Order for plotted developmentNA ORDER_LAYOUT.pdf · uploaded 2 Oct 2021Source
  • Commencement Certificates / NA Order for plotted developmentSDO_BUILDING DEVELOPMENT PERMISSION.pdf · uploaded 2 Oct 2021Source
  • Declaration in FORM BFORM B.pdf · uploaded 2 Oct 2021View
  • Disclosure of sold/ booked inventoryBOOK SOLD INVENTORY.pdf · uploaded 2 Oct 2021View
  • Proforma of Allotment letterAGREEMENT TO SALE_FORMAT.pdf · uploaded 2 Oct 2021View
  • Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 2 Oct 2021View
  • OtherPURCHASE DEED_PART 1.pdf · uploaded 2 Oct 2021View
  • OtherPURCHASE DEED_PART 2.pdf · uploaded 2 Oct 2021View
  • OtherPURCHASE DEED_PART 3.pdf · uploaded 2 Oct 2021View
  • Copy of the legal title reportFORMAT A_SEARCH.pdf · uploaded 9 Nov 2021View
  • Declaration about Commencement CertificateFORMAT D_COMMENCMENT DECLARATION.pdf · uploaded 9 Nov 2021Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 21-22.pdf · uploaded 6 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)form 2A_31_03_2023.pdf · uploaded 2 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_31_03_2023.pdf · uploaded 2 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2_30_06_2023.pdf · uploaded 2 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_30_09_2023.pdf · uploaded 2 Jan 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5_31_03_2023.pdf · uploaded 2 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_31_03_2023.pdf · uploaded 2 Jan 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_30_06_2023.pdf · uploaded 2 Jan 2024Source
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_30_09_2023.pdf · uploaded 2 Jan 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOCCUPANCY CERTIFICATE-PRATAPGAD APARTMENT.pdf · uploaded 5 Dec 2024View
  • Status of Formation of Legal Entity (Society/Co Op etc.)Association of Person_compressed.pdf · uploaded 5 Dec 2024View
  • Architect’s Certificate on Completion of Project (Form 4)FORM 4.pdf · uploaded 30 Dec 2024View

Promoter documents

  • Declaration Form BFORM B.pdf · uploaded 2 Oct 2021View
  • Legal Title reportFORMAT A_SEARCH.pdf · uploaded 9 Nov 2021View

Technical documents

  • Layout ApprovalLAYOUT MAP.pdfView
  • Building Plan ApprovalSANCTION MAP_BUILDING.pdfSource

Other legal documents

  • OtherPURCHASE DEED_PART 1.pdfView
  • OtherPURCHASE DEED_PART 2.pdfView
  • OtherPURCHASE DEED_PART 3.pdfView

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Pipri (CT), Wardha taluka

Survey, CTS, gat or plot numbers

1321/1SURVEY NO 321/1 PLOT NO 1

As published on MahaRERA's project page

SURVEY NO 321/1 PLOT NO 1

Boundaries

North
Layout Road
South
Plot No 12
East
Plot No 2
West
Layout Road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSwapnil Khedikar—
Chartered accountantDarshan Wakhariya—
EngineerRoshan Satpute—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology