Benchmark Greens
Certificate SignedVangani (Ct), Thane 421503 |Promoter: Benchmark Empire
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 15
- Unit types
- Premium Villa, 1BHK, 1RK, Executive Villa, 0165 units in all
- Address
- Survey No. 109, Hissa No.3/P, Gat No.258, BEDISGAON ROAD, VANGANIPIN 421503
- Designated bank account
- 220
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 7 years and 6 months
- Registered
- 15 Sep 2017
- Promised
- 30 Jun 2021
- Revised
- 31 Dec 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700013160 | 15 Sep 2017 | 30 Jun 2021 | 31 Dec 2028 | Benchmark Empire | Project page |
15 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building 1 | 1 | 4 |
| Building 10 | 1 | 2 |
| Building 11 | 8 | 50 |
| Building 12 | 8 | 55 |
| Building 2 | 1 | 6 |
| Building 3 | 1 | 8 |
| Building 4 | 1 | 8 |
| Building 5 | 1 | 10 |
Show all 15 buildingsShow fewer buildings
| Building | Sanctioned floors | Units |
|---|---|---|
| Building 6 | 1 | 9 |
| Building 7 | 1 | 8 |
| Building 8 | 1 | 2 |
| Building 9 | 1 | 2 |
| Proposed 1 | 0 | 0 |
| Proposed 2 | 0 | 0 |
| Proposed 3 | 1 | 1 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
38 of 165 units booked (23%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building 1 | Premium Villa | 17.98 sq m · 194 sq ft | 2 | 2 |
| Building 1 | Premium Villa | 25.48 sq m · 274 sq ft | 2 | 2 |
| Building 10 | Premium Villa | 25.48 sq m · 274 sq ft | 2 | 2 |
| Building 11 | 1BHK | 27.4 sq m · 295 sq ft | 12 | 0 |
| Building 11 | 1BHK | 28.61 sq m · 308 sq ft | 1 | 0 |
| Building 11 | 1BHK | 30.22 sq m · 325 sq ft | 14 | 0 |
| Building 11 | 1BHK | 30.28 sq m · 326 sq ft | 7 | 0 |
| Building 11 | 1BHK | 31.94 sq m · 344 sq ft | 7 | 0 |
Show all 33 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building 11 | 1RK | 17.83 sq m · 192 sq ft | 7 | 0 |
| Building 11 | 1RK | 24.4 sq m · 263 sq ft | 2 | 0 |
| Building 12 | 1BHK | 24.4 sq m · 263 sq ft | 2 | 0 |
| Building 12 | 1BHK | 27.4 sq m · 295 sq ft | 12 | 0 |
| Building 12 | 1BHK | 28.61 sq m · 308 sq ft | 1 | 0 |
| Building 12 | 1BHK | 30.22 sq m · 325 sq ft | 14 | 0 |
| Building 12 | 1BHK | 30.27 sq m · 326 sq ft | 7 | 0 |
| Building 12 | 1BHK | 30.28 sq m · 326 sq ft | 6 | 0 |
| Building 12 | 1BHK | 31.94 sq m · 344 sq ft | 6 | 0 |
| Building 12 | 1RK | 17.83 sq m · 192 sq ft | 7 | 0 |
| Building 2 | Executive Villa | 17.98 sq m · 194 sq ft | 5 | 5 |
| Building 2 | Premium Villa | 25.48 sq m · 274 sq ft | 1 | 1 |
| Building 3 | Executive Villa | 17.98 sq m · 194 sq ft | 7 | 7 |
| Building 3 | Premium Villa | 25.48 sq m · 274 sq ft | 1 | 1 |
| Building 4 | Executive Villa | 17.98 sq m · 194 sq ft | 7 | 7 |
| Building 4 | Premium Villa | 25.48 sq m · 274 sq ft | 1 | 1 |
| Building 5 | Executive Villa | 17.98 sq m · 194 sq ft | 9 | 6 |
| Building 5 | Premium Villa | 25.48 sq m · 274 sq ft | 1 | 1 |
| Building 6 | Premium Villa | 41.85 sq m · 450 sq ft | 9 | 1 |
| Building 7 | Premium Villa | 41.85 sq m · 450 sq ft | 8 | 0 |
| Building 8 | Executive Villa | 41.85 sq m · 450 sq ft | 2 | 0 |
| Building 9 | Premium Villa | 25.48 sq m · 274 sq ft | 2 | 2 |
| Proposed 1 | 0 | — | 0 | 0 |
| Proposed 2 | 0 | — | 0 | 0 |
| Proposed 3 | 1RK | 1 sq m · 11 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 103 filings listed on MahaRERA's project page
Legal
- Legal Title reportTitle Certificate.pdf · uploaded 7 Sep 2017Source
- Declaration Form BForm B Promoter-ilovepdf-compressed2.pdf · uploaded 12 Sep 2017Source
- Declaration Form BManoj.pdf · uploaded 12 Sep 2017Source
- Other – LegalPERT.pdf · uploaded 20 Feb 2025Source
- Declaration Form BForm B.pdf · uploaded 20 Feb 2025Source
- Declaration Form BForm B- Nov 2024.pdf · uploaded 21 Mar 2025Source
Show all 105 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportTitle Certificate.pdf · uploaded 7 Sep 2017Source
- 1 Details of encumbrancesCertificate - Manoj Kedare.pdf · uploaded 7 Sep 2017Source
- 1 Copy of Layout Approval (in case of layout)PLAN PASS COPY.pdf · uploaded 7 Sep 2017Source
- 1 Building Plan Approval (IOD)PLAN PASS COPY.pdf · uploaded 7 Sep 2017Source
- 1 Certificates of CA (Form 3)Form 3-ilovepdf-compressed.pdf · uploaded 7 Sep 2017Source
- 1 Declaration in FORM BForm B Promoter-ilovepdf-compressed2.pdf · uploaded 12 Sep 2017Source
- 2 Declaration in FORM BManoj.pdf · uploaded 12 Sep 2017Source
- 1 Proforma of Allotment letterFinal MASTER AGREEMENT VANGANI-RAHUL SHELAR -AS PER RERA ACT.pdf · uploaded 12 Sep 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentNAOrder_compressed.pdf · uploaded 8 Aug 2021Source
- 1 Declaration about Commencement CertificateCC_1_compressed.pdf · uploaded 8 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)June_compressed.pdf · uploaded 15 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Sept.pdf · uploaded 15 Nov 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Dec_compressed.pdf · uploaded 15 Nov 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Mar.pdf · uploaded 15 Nov 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)June_compressed.pdf · uploaded 15 Nov 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Sept.pdf · uploaded 15 Nov 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Dec.pdf · uploaded 15 Nov 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Mar.pdf · uploaded 15 Nov 2021Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Mar.pdf · uploaded 15 Nov 2021Source
- 1 Disclosure of sold/ booked inventoryBuilding no 1.pdf · uploaded 15 Nov 2021Source
- 2 Disclosure of sold/ booked inventoryBuilding no 2.pdf · uploaded 15 Nov 2021Source
- 3 Disclosure of sold/ booked inventoryBuilding no 3.pdf · uploaded 15 Nov 2021Source
- 4 Disclosure of sold/ booked inventoryBuilding no 4.pdf · uploaded 15 Nov 2021Source
- 5 Disclosure of sold/ booked inventoryBuilding no 5.pdf · uploaded 15 Nov 2021Source
- 6 Disclosure of sold/ booked inventoryBuilding no 6.pdf · uploaded 15 Nov 2021Source
- 7 Disclosure of sold/ booked inventoryBuilding no 7.pdf · uploaded 15 Nov 2021Source
- 8 Disclosure of sold/ booked inventoryBuilding no 8.pdf · uploaded 15 Nov 2021Source
- 9 Disclosure of sold/ booked inventoryBuilding no 9.pdf · uploaded 15 Nov 2021Source
- 10 Disclosure of sold/ booked inventoryBuilding no 10.pdf · uploaded 15 Nov 2021Source
- 11 Disclosure of sold/ booked inventoryBuilding no 11.pdf · uploaded 15 Nov 2021Source
- 12 Disclosure of sold/ booked inventoryBuilding no 12.pdf · uploaded 15 Nov 2021Source
- 13 Disclosure of sold/ booked inventoryBuilding no 13.pdf · uploaded 15 Nov 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5_18-19.pdf · uploaded 30 Nov 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form5_19-2020.pdf · uploaded 30 Nov 2021Source
- 1 Copy of Layout Approval (in case of layout)Revised Layout.pdf · uploaded 31 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ilovepdf_merged_compressed.pdf · uploaded 31 Jan 2025Source
- 1 Certificates of CA (Form 3)Form-3_Q3_FY24-25.pdf · uploaded 31 Jan 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ilovepdf_merged_compressed.pdf · uploaded 31 Jan 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ilovepdf_merged_compressed.pdf · uploaded 31 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - BUILDING 1.pdf · uploaded 31 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentRevised NA order_compressed.pdf · uploaded 31 Jan 2025Source
- 1 Building Plan Approval (IOD)Revised Plan.pdf · uploaded 31 Jan 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 31 Jan 2025Source
- 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 31 Jan 2025Source
- 1 Declaration in FORM BForm B.pdf · uploaded 20 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_B1_merged_compressed.pdf · uploaded 20 Feb 2025Source
- 2 Certificates of CA (Form 3)FORM 3.pdf · uploaded 20 Feb 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_B1_merged_compressed.pdf · uploaded 20 Feb 2025Source
- 1 Other – LegalPERT.pdf · uploaded 20 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)ilovepdf_merged (1).pdf · uploaded 20 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)ilovepdf_merged.pdf · uploaded 20 Feb 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023-24.pdf · uploaded 20 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_B1_merged_compressed.pdf · uploaded 10 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_B1_merged_compressed.pdf · uploaded 10 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 22-23.pdf · uploaded 10 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A 24-25.pdf · uploaded 10 Mar 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23.pdf · uploaded 10 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A 23-24.pdf · uploaded 10 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)1_2A_JUNE 2019_FY 2019_20.pdf · uploaded 12 Mar 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2_Form 2A - SEPTEMBER 2019 - FY 2019-20.pdf · uploaded 12 Mar 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)3_Form 2A - DECEMBER 2019 - FY 2019-20.pdf · uploaded 12 Mar 2025Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)4_MARCH 2020 - FY 2020-21.pdf · uploaded 12 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)1_2A_JUNE_2020_FY_2020_21.pdf · uploaded 12 Mar 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2_Form 2A - SEPTEMBER 2020 - FY 2020-21.pdf · uploaded 12 Mar 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)4_Form 2A - MARCH 2021 - FY 2021-22.pdf · uploaded 12 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)1_Form 2A - JUNE 2021 - FY 2021-22.pdf · uploaded 12 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1_ Form 2A - JUNE 2023 - FY 2023-24.pdf · uploaded 12 Mar 2025Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)4_MARCH 2020 - FY 2020-21.pdf · uploaded 14 Mar 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2_Form 2A - SEPTEMBER 2021 - FY 2021-22.pdf · uploaded 14 Mar 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)3_Form 2A - DECEMBER 2021 - FY 2021-22.pdf · uploaded 14 Mar 2025Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)4_Form 2A - MARCH 2021 - FY 2021-22.pdf · uploaded 14 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM_FY 2022-23_compressed.pdf · uploaded 14 Mar 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM_FY 2023-24_compressed.pdf · uploaded 14 Mar 2025Source
- 1 Other – TechnicalPERT_BUILDING_NO_6_7_8_11_12_compressed.pdf · uploaded 15 Mar 2025Source
- 1 Declaration in FORM BForm B- Nov 2024.pdf · uploaded 21 Mar 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold_ booked inventory1.pdf · uploaded 21 Mar 2025Source
- Form 2A (FY 2017-2018)Form 2A- March 2018.pdf · uploaded 25 Oct 2025Source
- Form 2A (FY 2018-2019)Form 2A- March 2019.pdf · uploaded 25 Oct 2025Source
- Form 2A (FY 2019-2020)Form 2A- March 2020.pdf · uploaded 25 Oct 2025Source
- Form 2A (FY 2020-2021)Form 2A- March 2021.pdf · uploaded 25 Oct 2025Source
- Form 2A (FY 2021-2022)Form 2A- March 2022.pdf · uploaded 26 Oct 2025Source
- Form 2A (FY 2022-2023)Form 2A- March 2023.pdf · uploaded 26 Oct 2025Source
- Form 2A (FY 2023-2024)Form 2A- March 2024.pdf · uploaded 26 Oct 2025Source
- Form 2A (FY 2024-2025)Form 2A- March 2025.pdf · uploaded 26 Oct 2025Source
Technical
- DocumentPLAN PASS COPY.pdf · uploaded 7 Sep 2017Source
- DocumentPLAN PASS COPY.pdf · uploaded 7 Sep 2017Source
- DocumentRevised Layout.pdf · uploaded 31 Jan 2025Source
- DocumentRevised Plan.pdf · uploaded 31 Jan 2025Source
- Other – TechnicalPERT_BUILDING_NO_6_7_8_11_12_compressed.pdf · uploaded 15 Mar 2025Source
Technical (Architect)
Technical (Engineer)
- DocumentFORM 2 - BUILDING 1.pdf · uploaded 31 Jan 2025Source
- Documentilovepdf_merged_compressed.pdf · uploaded 31 Jan 2025Source
- Documentilovepdf_merged_compressed.pdf · uploaded 31 Jan 2025Source
- DocumentForm 2_B1_merged_compressed.pdf · uploaded 20 Feb 2025Source
- DocumentForm 2_B1_merged_compressed.pdf · uploaded 10 Mar 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Vangani (CT), Ambarnath taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Gat No 259
- South
- Existing Road
- East
- Existing Road
- West
- Gat No 256
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Orcholis (Partner : Amit Vadnere) | — |
| Chartered accountant | Mayur Gurunath Shinde | — |
| Engineer | Orchilos (Partner Milind Shinde) | — |
| Other | M/s. Rahul Enterprises | — |
| Registered real estate agent | Bhavesh Haridas Chandra | — |
Source: MahaRERA project page. Contact details are not shown.