Certificate SignedThane (M Corp.), Thane 400607 |Promoter: Trinity Creative Homes LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 1BHK, 2BHK, 3BHK, 4BHK, Departmental store, largedepartmentalsto, Largedepartmentalsto, Office space, Shop281 units in all
- Address
- S.no.37/H.no, -11/B, S.no, -29 H.no, -1a, S.no, -29 H.no, -1b, Dhokali, ThanePIN 400607
- Designated bank account
- 76
- Developed in phases
- No
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 23 Jul 2024
- Promised
- 30 Jun 2028
- Revised
- 30 Oct 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700077151 | 23 Jul 2024 | 30 Jun 2028 | 30 Oct 2028 | Trinity Creative Homes LLP | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| La Residency | 32 | 281 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
8 of 281 units booked (3%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 41.81 sq m · 450 sq ft | 25 | 0 |
| 1BHK | 42.74 sq m · 460 sq ft | 21 | 0 |
| 1BHK | 69.21 sq m · 745 sq ft | 2 | 0 |
| 2BHK | 66.89 sq m · 720 sq ft | 21 | 0 |
| 2BHK | 72 sq m · 775 sq ft | 13 | 0 |
| 3BHK | 93.83 sq m · 1,010 sq ft | 18 | 0 |
| 3BHK | 120.77 sq m · 1,300 sq ft | 2 | 0 |
| 4BHK | 166.3 sq m · 1,790 sq ft | 3 | 0 |
Show all 48 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Departmental store | 205.31 sq m · 2,210 sq ft | 1 | 0 |
| Departmental store | 297.75 sq m · 3,205 sq ft | 1 | 0 |
| Departmental store | 315.4 sq m · 3,395 sq ft | 1 | 0 |
| Departmental store | 353.03 sq m · 3,800 sq ft | 1 | 0 |
| Departmental store | 361.85 sq m · 3,895 sq ft | 1 | 0 |
| Departmental store | 403.2 sq m · 4,340 sq ft | 1 | 0 |
| largedepartmentalsto | 782.24 sq m · 8,420 sq ft | 1 | 0 |
| Largedepartmentalsto | 665.18 sq m · 7,160 sq ft | 1 | 0 |
| Office space | 7.9 sq m · 85 sq ft | 5 | 0 |
| Office space | 13.47 sq m · 145 sq ft | 1 | 0 |
| Office space | 19.04 sq m · 205 sq ft | 4 | 0 |
| Office space | 21.37 sq m · 230 sq ft | 5 | 0 |
| Office space | 22.3 sq m · 240 sq ft | 15 | 0 |
| Office space | 22.76 sq m · 245 sq ft | 6 | 0 |
| Office space | 23.69 sq m · 255 sq ft | 5 | 0 |
| Office space | 24.15 sq m · 260 sq ft | 10 | 0 |
| Office space | 26.01 sq m · 280 sq ft | 5 | 0 |
| Office space | 26.48 sq m · 285 sq ft | 1 | 0 |
| Office space | 27.41 sq m · 295 sq ft | 5 | 0 |
| Office space | 27.87 sq m · 300 sq ft | 14 | 0 |
| Office space | 28.8 sq m · 310 sq ft | 10 | 0 |
| Office space | 29.73 sq m · 320 sq ft | 10 | 0 |
| Office space | 30.66 sq m · 330 sq ft | 5 | 0 |
| Office space | 32.05 sq m · 345 sq ft | 9 | 0 |
| Office space | 32.52 sq m · 350 sq ft | 1 | 0 |
| Office space | 33.44 sq m · 360 sq ft | 4 | 0 |
| Office space | 33.91 sq m · 365 sq ft | 2 | 0 |
| Office space | 41.34 sq m · 445 sq ft | 5 | 0 |
| Office space | 45.99 sq m · 495 sq ft | 4 | 0 |
| Office space | 47.38 sq m · 510 sq ft | 4 | 0 |
| Office space | 48.77 sq m · 525 sq ft | 4 | 0 |
| Office space | 55.74 sq m · 600 sq ft | 5 | 0 |
| Office space | 62.24 sq m · 670 sq ft | 5 | 0 |
| Office space | 65.03 sq m · 700 sq ft | 5 | 0 |
| Office space | 70.14 sq m · 755 sq ft | 5 | 0 |
| Shop | 34.84 sq m · 375 sq ft | 7 | 5 |
| Shop | 65.03 sq m · 700 sq ft | 1 | 0 |
| Shop | 68.28 sq m · 735 sq ft | 1 | 0 |
| Shop | 68.75 sq m · 740 sq ft | 4 | 3 |
| Shop | 69.21 sq m · 745 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 130 filings listed on MahaRERA's project page
Finance
- PAN CardTrinity Pan Card Copy.pdf · uploaded 21 Jun 2024Source
Legal
Migrated
- 1 PAN CardTrinity Pan Card Copy.pdf · uploaded 21 Jun 2024Source
- 1 a Details of encumbrances concerned to FinanceLegal Encumbrance (1).pdf · uploaded 27 Jun 2024Source
- 2 a Details of encumbrances concerned to FinanceFinancial encumbrance.pdf · uploaded 27 Jun 2024Source
- 1 b Details of encumbrances concerned to LegalLegal Encumbrance (1).pdf · uploaded 27 Jun 2024Source
Show all 131 documentsShow fewer documents
Migrated
- 2 b Details of encumbrances concerned to LegalFinancial encumbrance.pdf · uploaded 27 Jun 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentTRINITY CC PLANS.pdf · uploaded 27 Jun 2024Source
- 1 Declaration about Commencement CertificateDeclaration CC.pdf · uploaded 27 Jun 2024Source
- 1 Declaration in FORM BForm-B (1).pdf · uploaded 27 Jun 2024Source
- 1 CERSAI detailsCersai Declaration (11).pdf · uploaded 27 Jun 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed CA Certificate TRINITY (1).pdf · uploaded 27 Jun 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure(murji).pdf · uploaded 27 Jun 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A(Jayesh).pdf · uploaded 27 Jun 2024Source
- 1 Proforma of Agreement for saleLA_RESIDENCY_Agreement FINAL.pdf · uploaded 27 Jun 2024Source
- 1 Proforma of Allotment letterALLOTMENT LETTER FINAL (6).pdf · uploaded 27 Jun 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK LETTER.pdf · uploaded 27 Jun 2024Source
- 1 Deviation Report with respect to Allotment letterDeviation report of Allotment .pdf · uploaded 27 Jun 2024Source
- 1 Deviation Report with respect to model copy of AgreementFinal Devaition of Agreement for Sale _1-17.pdf · uploaded 27 Jun 2024Source
- 1 Copy of the legal title reportFinal Legal title report.pdf · uploaded 28 Jun 2024Source
- 1 Copy of Layout Approval (in case of layout)1 scan0440 FINAL (1).pdf · uploaded 28 Jun 2024Source
- 1 Building Plan Approval / NA Order for plotted development1 scan0440 FINAL (1).pdf · uploaded 28 Jun 2024Source
- 1 Other – LegalDeed of Conveyance (Khatau) (1)_1-46.pdf · uploaded 28 Jun 2024Source
- 2 Other – LegalDeed of Conveyance (Khatau)_1-28.pdf · uploaded 28 Jun 2024Source
- 3 Other – LegalDeed of Conveyance (Khatau)_29-56.pdf · uploaded 28 Jun 2024Source
- 1 Other – TechnicalAnnexure-A.pdf · uploaded 28 Jun 2024Source
- 2 Building Plan Approval / NA Order for plotted development2 scan0441.pdf · uploaded 1 Jul 2024Source
- 3 Building Plan Approval / NA Order for plotted development3 scan0442.pdf · uploaded 1 Jul 2024Source
- 4 Building Plan Approval / NA Order for plotted development4 scan0443.pdf · uploaded 1 Jul 2024Source
- 5 Building Plan Approval / NA Order for plotted development5scan0444.pdf · uploaded 1 Jul 2024Source
- 6 Building Plan Approval / NA Order for plotted development6 scan0445.pdf · uploaded 1 Jul 2024Source
- 7 Building Plan Approval / NA Order for plotted development7 scan0446.pdf · uploaded 1 Jul 2024Source
- 8 Building Plan Approval / NA Order for plotted development8 scan0447.pdf · uploaded 1 Jul 2024Source
- 9 Building Plan Approval / NA Order for plotted development9 scan0448.pdf · uploaded 1 Jul 2024Source
- 10 Building Plan Approval / NA Order for plotted development10 scan0449.pdf · uploaded 1 Jul 2024Source
- 11 Building Plan Approval / NA Order for plotted development11 scan0450.pdf · uploaded 1 Jul 2024Source
- 12 Building Plan Approval / NA Order for plotted development12 scan0451.pdf · uploaded 1 Jul 2024Source
- 13 Building Plan Approval / NA Order for plotted development13 scan0452.pdf · uploaded 1 Jul 2024Source
- 14 Building Plan Approval / NA Order for plotted development14 scan0453.pdf · uploaded 1 Jul 2024Source
- 15 Building Plan Approval / NA Order for plotted development15 scan0454.pdf · uploaded 1 Jul 2024Source
- 16 Building Plan Approval / NA Order for plotted development16 scan0455.pdf · uploaded 1 Jul 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1.pdf · uploaded 1 Jul 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINNERS CERTIFICATE Form 2.pdf · uploaded 1 Jul 2024Source
- 4 Other – LegalDeed of Conveyance (Khatau)_57-84.pdf · uploaded 2 Jul 2024Source
- 5 Other – LegalDeed of Conveyance (Khatau)_85-111.pdf · uploaded 2 Jul 2024Source
- 6 Other – LegalDeed of Conveyance (Khatau)_112-end.pdf · uploaded 2 Jul 2024Source
- 7 Other – Legals no 37 11 B_1-18.pdf · uploaded 2 Jul 2024Source
- 8 Other – Legals no 37 11 B_19-36.pdf · uploaded 2 Jul 2024Source
- 9 Other – LegalS no 37 11 B_37-54.pdf · uploaded 2 Jul 2024Source
- 10 Other – Legals no 37 11 B_55-71.pdf · uploaded 2 Jul 2024Source
- 11 Other – Legals no 37 11 B_72-end.pdf · uploaded 2 Jul 2024Source
- 2 Deviation Report with respect to model copy of AgreementFinal Devaition of Agreement for Sale _18-end (1).pdf · uploaded 9 Jul 2024Source
- 3 a Details of encumbrances concerned to FinanceAuthority Letter.pdf · uploaded 6 Aug 2024Source
- 3 b Details of encumbrances concerned to LegalAuthority Letter.pdf · uploaded 6 Aug 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 6 Aug 2024Source
- 4 a Details of encumbrances concerned to FinanceFinancial Encumbrance.pdf · uploaded 7 Aug 2024Source
- 4 b Details of encumbrances concerned to LegalFinancial Encumbrance.pdf · uploaded 7 Aug 2024Source
- 1 Disclosure of sold/ booked inventoryInventory Disclosure.pdf · uploaded 9 Aug 2024Source
- 2 Proforma of Agreement for saleLA_RESIDENCY Agreement.pdf · uploaded 9 Aug 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 22 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 22 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 22 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 28 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 28 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 28 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 30 Apr 2025Source
- 2 Copy of Layout Approval (in case of layout)2.pdf · uploaded 30 Apr 2025Source
- 3 Copy of Layout Approval (in case of layout)3.pdf · uploaded 30 Apr 2025Source
- 4 Copy of Layout Approval (in case of layout)4.pdf · uploaded 30 Apr 2025Source
- 5 Copy of Layout Approval (in case of layout)5.pdf · uploaded 30 Apr 2025Source
- 6 Copy of Layout Approval (in case of layout)6.pdf · uploaded 30 Apr 2025Source
- 7 Copy of Layout Approval (in case of layout)7.pdf · uploaded 30 Apr 2025Source
- 8 Copy of Layout Approval (in case of layout)8.pdf · uploaded 30 Apr 2025Source
- 9 Copy of Layout Approval (in case of layout)9.pdf · uploaded 30 Apr 2025Source
- 10 Copy of Layout Approval (in case of layout)10.pdf · uploaded 30 Apr 2025Source
- 11 Copy of Layout Approval (in case of layout)11.pdf · uploaded 30 Apr 2025Source
- 12 Copy of Layout Approval (in case of layout)12.pdf · uploaded 30 Apr 2025Source
- 13 Copy of Layout Approval (in case of layout)13.pdf · uploaded 30 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentTRINITY AMENDMENT CC CERTIFICATE .pdf · uploaded 30 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentRevised LOI Letter.pdf · uploaded 30 Apr 2025Source
- Withdrawal Update Form 1FORM-1 SIGNED.pdf · uploaded 8 Dec 2025Source
- Withdrawal Update Form 2Signed Form-2.pdf · uploaded 8 Dec 2025Source
- Withdrawal Update Form 3form 3.pdf · uploaded 8 Dec 2025Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 16 Apr 2026Source
- Withdrawal Update Form 1Form-1 Signed.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 2Form-2 Signed.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 3Form-3 Signed.pdf · uploaded 8 Jun 2026Source
- Withdrawal Update Form 1Form-1 LR.pdf · uploaded 13 Aug 2026Source
- Withdrawal Update Form 2Form-2 LR.pdf · uploaded 13 Aug 2026Source
- Withdrawal Update Form 3Form-3 LR.pdf · uploaded 13 Aug 2026Source
Technical
- Document1 scan0440 FINAL (1).pdf · uploaded 28 Jun 2024Source
- Document1 scan0440 FINAL (1).pdf · uploaded 28 Jun 2024Source
- Document2 scan0441.pdf · uploaded 1 Jul 2024Source
- Document3 scan0442.pdf · uploaded 1 Jul 2024Source
- Document4 scan0443.pdf · uploaded 1 Jul 2024Source
- Document5scan0444.pdf · uploaded 1 Jul 2024Source
- Document6 scan0445.pdf · uploaded 1 Jul 2024Source
- Document7 scan0446.pdf · uploaded 1 Jul 2024Source
- Document8 scan0447.pdf · uploaded 1 Jul 2024Source
- Document9 scan0448.pdf · uploaded 1 Jul 2024Source
- Document10 scan0449.pdf · uploaded 1 Jul 2024Source
- Document11 scan0450.pdf · uploaded 1 Jul 2024Source
- Document12 scan0451.pdf · uploaded 1 Jul 2024Source
- Document13 scan0452.pdf · uploaded 1 Jul 2024Source
- Document14 scan0453.pdf · uploaded 1 Jul 2024Source
- Document15 scan0454.pdf · uploaded 1 Jul 2024Source
- Document16 scan0455.pdf · uploaded 1 Jul 2024Source
- Document1.pdf · uploaded 30 Apr 2025Source
- Document2.pdf · uploaded 30 Apr 2025Source
- Document3.pdf · uploaded 30 Apr 2025Source
- Document4.pdf · uploaded 30 Apr 2025Source
- Document5.pdf · uploaded 30 Apr 2025Source
- Document6.pdf · uploaded 30 Apr 2025Source
- Document7.pdf · uploaded 30 Apr 2025Source
- Document8.pdf · uploaded 30 Apr 2025Source
- Document9.pdf · uploaded 30 Apr 2025Source
- Document10.pdf · uploaded 30 Apr 2025Source
- Document11.pdf · uploaded 30 Apr 2025Source
- Document12.pdf · uploaded 30 Apr 2025Source
- Document13.pdf · uploaded 30 Apr 2025Source
- DocumentRevised LOI Letter.pdf · uploaded 30 Apr 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Thane (M Corp.), Thane taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Adj New S No 34
- South
- Adj New S No 37
- East
- 40 M W Road
- West
- Adj New S No 29 H No 2
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Chartered accountant | Vikram Viresh Bhate | — |
Source: MahaRERA project page. Contact details are not shown.