Skip to content

Godrej Bayview

Certificate Signed

Navi Mumbai (M Corp.), Thane 400703 |Promoter: Suncity Infrastructures (Mumbai) LLP

Residential / Group HousingRERAP51700031726
8 Nov 2021Registered with MahaRERA
31 Dec 2028Promised completion
30 Apr 2029Revised completionPushed back 4 months
2Buildings
244Units registered167 booked (68%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
2
Unit types
2BHK, 3BHK244 units in all
Address
Plot 18, Plot 3, Juhu Chowpatty Road, VashiPIN 400703
Designated bank account
220
Developed in phases
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.07833, 72.99656
Godrej Bayview is at latitude 19.07833, longitude 72.99656.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
8 Nov 2021
Promised
31 Dec 2028
Revised
30 Apr 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000317268 Nov 202131 Dec 202830 Apr 2029Suncity Infrastructures (Mumbai) LLPProject page

2 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Tower 224113
Tower 324131

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

167 of 244 units booked (68%), as the promoter reported to MahaRERA

2BHK · 151 units3BHK · 93 units
BuildingTypeCarpet areaUnitsBooked
Tower 22BHK51.66 sq m · 556 sq ft127
Tower 22BHK51.83 sq m · 558 sq ft115
Tower 22BHK53.59 sq m · 577 sq ft129
Tower 22BHK53.77 sq m · 579 sq ft1211
Tower 22BHK56.82 sq m · 612 sq ft103
Tower 22BHK57.01 sq m · 614 sq ft108
Tower 23BHK66 sq m · 710 sq ft1211
Tower 23BHK66.13 sq m · 712 sq ft1210
Show all 17 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Tower 23BHK70.85 sq m · 763 sq ft1110
Tower 23BHK70.87 sq m · 763 sq ft1110
Tower 32BHK55.19 sq m · 594 sq ft114
Tower 32BHK55.23 sq m · 594 sq ft117
Tower 32BHK55.27 sq m · 595 sq ft2011
Tower 32BHK55.67 sq m · 599 sq ft2215
Tower 32BHK55.68 sq m · 599 sq ft2012
Tower 33BHK71.62 sq m · 771 sq ft2315
Tower 33BHK71.65 sq m · 771 sq ft2419

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 145 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardRevised PAN Card Suncity.pdf · uploaded 27 Oct 2021Source

Legal

  • Legal Title reportTitle Search Report_Juhu Village, Vashi-1-6_compressed.pdf · uploaded 27 Oct 2021Source
  • Legal Title reportTitle Search Report_Juhu Village, Vashi-7-11.pdf · uploaded 27 Oct 2021Source
  • Legal Title reportTitle Search Report_Juhu Village, Vashi-12-16_compressed.pdf · uploaded 27 Oct 2021Source
  • Legal Title reportTitle Search Report_Juhu Village, Vashi-17-21_compressed.pdf · uploaded 27 Oct 2021Source
  • Declaration Form BForm B- LLP v.pdf · uploaded 28 Oct 2021Source
  • OtherCRESAI Decleration.pdf · uploaded 29 Oct 2021Source
Show all 146 documentsShow fewer documents

Legal

  • OtherDecleration for Parking v1_compressed.pdf · uploaded 31 Oct 2021Source
  • OtherAmenities- RERA.pdf · uploaded 13 Dec 2021Source

Migrated

  • 1 PAN CardRevised PAN Card Suncity.pdf · uploaded 27 Oct 2021Source
  • 1 Copy of the legal title reportTitle Search Report_Juhu Village, Vashi-1-6_compressed.pdf · uploaded 27 Oct 2021Source
  • 2 Copy of the legal title reportTitle Search Report_Juhu Village, Vashi-7-11.pdf · uploaded 27 Oct 2021Source
  • 3 Copy of the legal title reportTitle Search Report_Juhu Village, Vashi-12-16_compressed.pdf · uploaded 27 Oct 2021Source
  • 4 Copy of the legal title reportTitle Search Report_Juhu Village, Vashi-17-21_compressed.pdf · uploaded 27 Oct 2021Source
  • 1 Details of encumbrancesEncumbrance Certificate.pdf · uploaded 27 Oct 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTURAL CERTIFICATE AUG 2021.pdf · uploaded 27 Oct 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_1.pdf · uploaded 27 Oct 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_2.pdf · uploaded 27 Oct 2021Source
  • 1 Declaration in FORM BForm B- LLP v.pdf · uploaded 28 Oct 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 28 Oct 2021Source
  • 1 Copy of Layout Approval (in case of layout)Layout 1.pdf · uploaded 29 Oct 2021Source
  • 1 OtherCRESAI Decleration.pdf · uploaded 29 Oct 2021Source
  • 2 OtherDecleration for Parking v1_compressed.pdf · uploaded 31 Oct 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentVashi 1.pdf · uploaded 1 Nov 2021Source
  • 1 Declaration about Commencement CertificateVashi- Decleration about CC.pdf · uploaded 1 Nov 2021Source
  • 1 Proforma of Allotment letterVashi AFS- 01112021.pdf · uploaded 1 Nov 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentVashi 1.pdf · uploaded 2 Nov 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentVashi 2.pdf · uploaded 2 Nov 2021Source
  • 3 Commencement Certificates / NA Order for plotted developmentVashi 3.pdf · uploaded 2 Nov 2021Source
  • 4 Commencement Certificates / NA Order for plotted developmentVashi 4.pdf · uploaded 2 Nov 2021Source
  • 5 Commencement Certificates / NA Order for plotted developmentVashi 5.pdf · uploaded 2 Nov 2021Source
  • 6 Commencement Certificates / NA Order for plotted developmentVashi 6.pdf · uploaded 2 Nov 2021Source
  • 7 Commencement Certificates / NA Order for plotted developmentVashi 7.pdf · uploaded 2 Nov 2021Source
  • 8 Commencement Certificates / NA Order for plotted developmentVashi 8.pdf · uploaded 2 Nov 2021Source
  • 9 Commencement Certificates / NA Order for plotted developmentVashi 9.pdf · uploaded 2 Nov 2021Source
  • 10 Commencement Certificates / NA Order for plotted developmentVashi 10.pdf · uploaded 2 Nov 2021Source
  • 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 3 Nov 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate updated_compressed-1-4.pdf · uploaded 13 Dec 2021Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate updated_compressed-5-9.pdf · uploaded 13 Dec 2021Source
  • 3 OtherAmenities- RERA.pdf · uploaded 13 Dec 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Godrej_Bayview_Form_5.pdf · uploaded 30 Sep 2022Source
  • 1 Proforma of Agreement for sale29102022 Godrej Bayview AFS_updated.pdf · uploaded 21 Dec 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Vashi_godrej bayview Form 2 Dec22.pdf · uploaded 23 Jan 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vashi_godrej bayview Form 3 Dec22,.pdf · uploaded 23 Jan 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)R_1 RERA Certificate Dec 2022.pdf · uploaded 24 Jan 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Godrej Bayview RERA certificate March 23.pdf · uploaded 9 Apr 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate Mar -23 Vashi Project_compressed.pdf · uploaded 20 Apr 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)engi GODREJ VASHI_Suncity APR' 23-Final.pdf · uploaded 25 Apr 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Godrej Bayview RERA certificate for June 2023.pdf · uploaded 6 Jul 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2.pdf · uploaded 13 Jul 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form.pdf · uploaded 13 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 22-23.pdf · uploaded 15 Sep 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Godrej Bayview Suncity_RERA certificate for Sep 2023.pdf · uploaded 17 Oct 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Eng Certificate_ 30th sept_ GODREJ VASHI_Suncity SEPT' 23-Final.pdf · uploaded 17 Oct 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3_Godrej Bayview 30th sept.pdf · uploaded 17 Oct 2023Source
  • 3 Proforma of Allotment letterVashi App Form.pdf · uploaded 17 Oct 2023Source
  • 1 Home Buyer /Allottee Grievance Redressal CellGrievance Redressal Cell Details.pdf · uploaded 27 Nov 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA certificate for Dec 2023 signed.pdf · uploaded 22 Jan 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ VASHI_Suncity DEC' 23 signed.pdf · uploaded 22 Jan 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Scanned CA certificate.pdf · uploaded 22 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Godrej Bayview QA Certificate FY 2022.pdf · uploaded 7 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A FY 2023.pdf · uploaded 7 Mar 2024Source
  • 1 Disclosure of sold/ booked inventoryQ3 FY 2024.pdf · uploaded 3 Apr 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Godrej Bayview RERA Archi Q4.pdf · uploaded 15 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Bayview Q4 Engg- RERA.pdf · uploaded 15 Apr 2024Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory Bayview Q4.pdf · uploaded 15 Apr 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 15 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QA Certificate FY 24.pdf · uploaded 24 Jun 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Bayview Rera Certificate June 2024.pdf · uploaded 20 Jul 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ VASHI_ENGG CERTIFICATE Q1.pdf · uploaded 20 Jul 2024Source
  • 3 Disclosure of sold/ booked inventoryDisclosure of Inventory Sold Q1 FY 25.pdf · uploaded 20 Jul 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE BAYVIEW Q1 compressed _compressed.pdf · uploaded 20 Jul 2024Source
  • Form 5 (FY 2023-2024)Form 5_Suncity Signed deliverables.pdf · uploaded 30 Sep 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Godrej Bayview Form 5 FY 2023 24.pdf · uploaded 7 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Godrej Bayview Form 5 FY 2023 24.pdf · uploaded 7 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Godrej Bayview Form 5 FY 2023 24.pdf · uploaded 7 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA certificate Vashi Sep 24.pdf · uploaded 18 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ VASHI_Suncity SEPT'24-Final.pdf · uploaded 18 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca certicate_compressed.pdf · uploaded 18 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryQ2 Fy 2024-25.pdf · uploaded 18 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA certificate Vashi Sep 24.pdf · uploaded 18 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ VASHI_Suncity SEPT'24-Final.pdf · uploaded 18 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca certicate_compressed.pdf · uploaded 18 Oct 2024Source
  • 1 Disclosure of sold/ booked inventoryQ2 Fy 2024-25.pdf · uploaded 18 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA certificate Vashi Sep 24.pdf · uploaded 18 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca certicate_compressed.pdf · uploaded 18 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)GODREJ VASHI_Suncity SEPT'24-Final.pdf · uploaded 18 Oct 2024Source
  • 3 Disclosure of sold/ booked inventoryQ2 Fy 2024-25.pdf · uploaded 18 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed_ Form1_RERA certificate Vashi Dec 24.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed_GODREJ VASHI_Suncity DEC'24-Final.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed_Form 3_CA CERTIFICATE (22).pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Inventory Sold Q3 FY 25.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Inventory Sold Q3 FY 25_Corrected .pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed_ Form1_RERA certificate Vashi Dec 24.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed_GODREJ VASHI_Suncity DEC'24-Final.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed_Form 3_CA CERTIFICATE (22).pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Inventory Sold Q3 FY 25.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Inventory Sold Q3 FY 25_Corrected .pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed_ Form1_RERA certificate Vashi Dec 24.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed_Form 3_CA CERTIFICATE (22).pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed_GODREJ VASHI_Suncity DEC'24-Final.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Inventory Sold Q3 FY 25.pdf · uploaded 20 Jan 2025Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Inventory Sold Q3 FY 25_Corrected .pdf · uploaded 20 Jan 2025Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Letter to Registrar.pdf · uploaded 18 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Certificate.pdf · uploaded 17 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Mar 25_compressed.pdf · uploaded 17 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Mar 2025.pdf · uploaded 17 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryMar 2025.pdf · uploaded 17 Apr 2025Source
  • Form 2A (FY 2024-2025)rev Bayview Q.A Certificate FY 2025.pdf · uploaded 9 Jun 2025Source
  • Withdrawal Update Form 1Withdrawal Application Form1 T2 and T3.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 2Form2 Bayview.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 3Bayview T2 and T3 CA Certificate Jun 25.pdf · uploaded 19 Jul 2025Source
  • Form 5 (FY 2024-2025)Godrej Bayview Form 5 FY 24-25.pdf · uploaded 28 Aug 2025Source
  • Withdrawal Update Form 1Signed_Withdrawal Application Form1_Bayview.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2RERA-GODREJ VASHI_Suncity EC_SEPTu002725-Final.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3Withdrawl update_form3_Bayview_Sept 2025.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 1Vashi Withdrawal Application Form1.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Form 2 Godrej Bayview Dec 2025.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Form 3 Godrej Bayview Dec 25.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 1Form 1 - Vashi - T2 and T3.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2Form 2 - Vashi - T2 and T3.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3Form 3 - Vashi - T2 and T3 - Signed.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)Form 2A - Bayview - Vashi - Signed.pdf · uploaded 15 Jun 2026Source
  • Withdrawal Update Form 1Form 1 - Bayview - Q1FY27 - Signed.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Bayview - Q1FY27 - Signed.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Bayview - Q1FY27 - Signed.pdf · uploaded 18 Jul 2026Source
  • Form 5 (FY 2025-2026)Godrej Bayview Form 5 FY 25-26.pdf · uploaded 23 Sep 2026Source

Technical

  • DocumentLayout 1.pdf · uploaded 29 Oct 2021Source
  • DocumentVashi 1.pdf · uploaded 1 Nov 2021Source

Technical (Architect)

  • DocumentRERA certificate Vashi Sep 24.pdf · uploaded 18 Oct 2024Source
  • DocumentRERA certificate Vashi Sep 24.pdf · uploaded 18 Oct 2024Source
  • DocumentRERA certificate Vashi Sep 24.pdf · uploaded 18 Oct 2024Source
  • DocumentSigned_ Form1_RERA certificate Vashi Dec 24.pdf · uploaded 20 Jan 2025Source
  • DocumentSigned_ Form1_RERA certificate Vashi Dec 24.pdf · uploaded 20 Jan 2025Source
  • DocumentSigned_ Form1_RERA certificate Vashi Dec 24.pdf · uploaded 20 Jan 2025Source
  • DocumentArch Certificate.pdf · uploaded 17 Apr 2025Source
  • DocumentForm 1 - Bayview - Q1FY27 - Signed.pdf · uploaded 18 Jul 2026Source

Technical (Engineer)

  • DocumentGODREJ VASHI_Suncity SEPT'24-Final.pdf · uploaded 18 Oct 2024Source
  • DocumentGODREJ VASHI_Suncity SEPT'24-Final.pdf · uploaded 18 Oct 2024Source
  • DocumentGODREJ VASHI_Suncity SEPT'24-Final.pdf · uploaded 18 Oct 2024Source
  • DocumentSigned_GODREJ VASHI_Suncity DEC'24-Final.pdf · uploaded 20 Jan 2025Source
  • DocumentSigned_GODREJ VASHI_Suncity DEC'24-Final.pdf · uploaded 20 Jan 2025Source
  • DocumentSigned_GODREJ VASHI_Suncity DEC'24-Final.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 2 Mar 2025.pdf · uploaded 17 Apr 2025Source
  • DocumentForm 2 - Bayview - Q1FY27 - Signed.pdf · uploaded 18 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Navi Mumbai (M Corp.), Thane taluka

Survey, CTS, gat or plot numbers

Plot 18Plot 3

Boundaries

North
JN Type 2 10 mt wide road
South
18 m wide road
East
Midland CHS Plot No 17
West
Type JN IV Plot No 2

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
EngineerRajendra V Joshi—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology