Skip to content

Cyber Works

Certificate Signed

Navi Mumbai (M Corp.), Thane 400703 |Promoter: Greenscape Ventures

10 Oct 2019Registered with MahaRERA
31 Dec 2026Promised completion
1Building
185Units registered61 booked (33%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
Gym, IT Office, Restaurant, Shop185 units in all
Address
A-606/1a, Midc South Central Road, T.t.c Industrial AreaPIN 400703
Designated bank account
85
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.14287, 73.01295
Cyber Works is at latitude 19.14287, longitude 73.01295.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
10 Oct 2019
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170002266310 Oct 201931 Dec 202631 Dec 2026Greenscape VenturesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Cyber Works27185

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

61 of 185 units booked (33%), as the promoter reported to MahaRERA

Gym · 1 unitIT Office · 152 unitsRestaurant · 3 unitsShop · 29 units
TypeCarpet areaUnitsBooked
Gym120.45 sq m · 1,297 sq ft10
IT Office81.13 sq m · 873 sq ft20
IT Office81.43 sq m · 877 sq ft8222
IT Office106.38 sq m · 1,145 sq ft328
IT Office156.41 sq m · 1,684 sq ft357
IT Office173.45 sq m · 1,867 sq ft10
Restaurant106.38 sq m · 1,145 sq ft20
Restaurant120.45 sq m · 1,297 sq ft10
Show all 16 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop42.17 sq m · 454 sq ft33
Shop44.93 sq m · 484 sq ft33
Shop47.7 sq m · 513 sq ft86
Shop48.39 sq m · 521 sq ft21
Shop52.54 sq m · 566 sq ft11
Shop53.92 sq m · 580 sq ft11
Shop67.95 sq m · 731 sq ft87
Shop68.93 sq m · 742 sq ft32

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 249 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPan Card - Greenscape Ventures.pdf · uploaded 25 Sep 2019Source

Legal

  • Legal Title reportPlot No A 606 1A Title Report.pdf · uploaded 25 Sep 2019Source
  • Declaration Form BGreenscape (Mahape) - Form B - Declaration.pdf · uploaded 25 Sep 2019Source
  • Declaration Form BForm B_11zon (1).pdf · uploaded 27 Feb 2025Source
  • Declaration Form BRevised Form B (1).pdf · uploaded 6 Mar 2025Source

Migrated

  • 1 PAN CardPan Card - Greenscape Ventures.pdf · uploaded 25 Sep 2019Source
Show all 251 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportPlot No A 606 1A Title Report.pdf · uploaded 25 Sep 2019Source
  • 1 Details of encumbrancesGreenscape (Mahape) - Declaration of encumbrances.pdf · uploaded 25 Sep 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC LETTER.pdf · uploaded 25 Sep 2019Source
  • 1 Declaration in FORM BGreenscape (Mahape) - Form B - Declaration.pdf · uploaded 25 Sep 2019Source
  • 1 Proforma of Allotment letterletter in lieu of agreement.pdf · uploaded 25 Sep 2019Source
  • 1 Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 26 Sep 2019Source
  • 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval - 6.pdf · uploaded 26 Sep 2019Source
  • 2 Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval - 2.pdf · uploaded 26 Sep 2019Source
  • 3 Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval - 3.pdf · uploaded 26 Sep 2019Source
  • 4 Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval - 4.pdf · uploaded 26 Sep 2019Source
  • 5 Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval - 5.pdf · uploaded 26 Sep 2019Source
  • 6 Building Plan Approval / NA Order for plotted developmentBuilding Plan Approval - 1.pdf · uploaded 26 Sep 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Greenscape Cyber Works.pdf · uploaded 27 Sep 2019Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Greenscape Ventures Form 2A.pdf · uploaded 12 Mar 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Cyber Works - Form 2.pdf · uploaded 9 Dec 2020Source
  • 1 Declaration about Commencement CertificateDeclaration Ventures.pdf · uploaded 15 Oct 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentDrawing A_606_1A_compressed.pdf · uploaded 3 Apr 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentApproval A-606-1A.pdf · uploaded 3 Apr 2023Source
  • 1 Proforma of Agreement for saleAgreement.pdf · uploaded 4 Dec 2023Source
  • 2 Proforma of Agreement for saleNEW Cyber works Agreement.pdf · uploaded 13 Dec 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 -Sept.pdf · uploaded 3 Apr 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2- dec.pdf · uploaded 3 Apr 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 -march.pdf · uploaded 3 Apr 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Final to be uploaded.pdf · uploaded 3 Apr 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 -Final to be uploaded.pdf · uploaded 3 Apr 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Final to be uploaded.pdf · uploaded 3 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)30-09-2022.pdf · uploaded 25 Apr 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)31-12-2022.pdf · uploaded 25 Apr 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)31-03-2023.pdf · uploaded 25 Apr 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Sept 2022.pdf · uploaded 18 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Dec 2022.pdf · uploaded 18 Jul 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-March 2023.pdf · uploaded 18 Jul 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- June 2023.pdf · uploaded 18 Jul 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Sept 2023.pdf · uploaded 18 Jul 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 -Dec 2023.pdf · uploaded 18 Jul 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- March 2024.pdf · uploaded 18 Jul 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - June 2023.pdf · uploaded 18 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - September 2023.pdf · uploaded 18 Jul 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - December 2023.pdf · uploaded 18 Jul 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- March 2024.pdf · uploaded 18 Jul 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form - June 2023.pdf · uploaded 18 Jul 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3-Sept 2023.pdf · uploaded 18 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3- Dec 2023.pdf · uploaded 18 Jul 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3- March 2024.pdf · uploaded 18 Jul 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 24.pdf · uploaded 7 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 2024.pdf · uploaded 7 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 24.pdf · uploaded 7 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 2024.pdf · uploaded 7 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ventures Form 3 June 24.pdf · uploaded 14 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ventures Form 3 June 24.pdf · uploaded 14 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 - Cyber Works - 2019-20.pdf · uploaded 9 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 - Cyber Works - 2020-21.pdf · uploaded 9 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 - Cyber Works - 2021-22.pdf · uploaded 9 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 - Cyber Works - 2022-23.pdf · uploaded 9 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Cyber Works - 2023-24.pdf · uploaded 9 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 CYBER WORKS Sept Quarter.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CYBER WORKS Sept Quarter.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 CYBER WORKS Sept Quarter.pdf · uploaded 20 Jan 2025Source
  • 1 Declaration in FORM BForm B_11zon (1).pdf · uploaded 27 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2022.pdf · uploaded 27 Feb 2025Source
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2024_compressed.pdf · uploaded 27 Feb 2025Source
  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2024.pdf · uploaded 27 Feb 2025Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 27 Feb 2025Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2024.pdf · uploaded 27 Feb 2025Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2023.pdf · uploaded 27 Feb 2025Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2023.pdf · uploaded 27 Feb 2025Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2023.pdf · uploaded 27 Feb 2025Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2023.pdf · uploaded 27 Feb 2025Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2022.pdf · uploaded 27 Feb 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2022.pdf · uploaded 27 Feb 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 27 Feb 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2023_11zon.pdf · uploaded 27 Feb 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2023.pdf · uploaded 27 Feb 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2022.pdf · uploaded 27 Feb 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sept 2022.pdf · uploaded 27 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2023.pdf · uploaded 27 Feb 2025Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Dec 2024_compressed.pdf · uploaded 27 Feb 2025Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sept 2024.pdf · uploaded 27 Feb 2025Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 2024.pdf · uploaded 27 Feb 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - March 2023.pdf · uploaded 27 Feb 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 24_compressed.pdf · uploaded 27 Feb 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Dec 2023.pdf · uploaded 27 Feb 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 2023.pdf · uploaded 27 Feb 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Dec 2022.pdf · uploaded 27 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sept 2022.pdf · uploaded 27 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Aug 2019.pdf · uploaded 27 Feb 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sept 2023.pdf · uploaded 27 Feb 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 2023.pdf · uploaded 27 Feb 2025Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 2024.pdf · uploaded 27 Feb 2025Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sept 2024.pdf · uploaded 27 Feb 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)June 2024.pdf · uploaded 27 Feb 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)March 2024.pdf · uploaded 27 Feb 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 2023.pdf · uploaded 27 Feb 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sept 2023.pdf · uploaded 27 Feb 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)March 2023.pdf · uploaded 27 Feb 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Dec 2022.pdf · uploaded 27 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Sept 2022.pdf · uploaded 27 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Aug 2019.pdf · uploaded 27 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 27 Feb 2025Source
  • 1 CERSAI detailsNo encumbrances.pdf · uploaded 27 Feb 2025Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 27 Feb 2025Source
  • 1 Details of encumbrancesEncumbrance Letter (1).pdf · uploaded 6 Mar 2025Source
  • 1 Declaration in FORM BRevised Form B (1).pdf · uploaded 6 Mar 2025Source
  • 1 CERSAI detailsCERSAI Declaration (1).pdf · uploaded 6 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FY 2019-20.pdf · uploaded 10 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FY 2020-21.pdf · uploaded 10 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FY 2021-22.pdf · uploaded 10 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FY 2022-23.pdf · uploaded 10 Mar 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FY 2023-24.pdf · uploaded 10 Mar 2025Source
  • 1 Copy of Layout Approval (in case of layout)1.pdf · uploaded 20 Mar 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate 03 01 2025_11zon.pdf · uploaded 20 Mar 2025Source
  • 1 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 20 Mar 2025Source
  • 2 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 20 Mar 2025Source
  • 3 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 20 Mar 2025Source
  • 4 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 20 Mar 2025Source
  • 5 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 20 Mar 2025Source
  • 6 Building Plan Approval / NA Order for plotted development7.pdf · uploaded 20 Mar 2025Source
  • 7 Building Plan Approval / NA Order for plotted development8.pdf · uploaded 20 Mar 2025Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 20 Mar 2025Source
  • 1 Disclosure of sold/ booked inventory31-03-2023_11zon.pdf · uploaded 9 Apr 2025Source
  • 2 Disclosure of sold/ booked inventory30-06-2023_11zon.pdf · uploaded 9 Apr 2025Source
  • 3 Disclosure of sold/ booked inventory30-09-2023_11zon.pdf · uploaded 9 Apr 2025Source
  • 4 Disclosure of sold/ booked inventory31-12-2023_11zon.pdf · uploaded 9 Apr 2025Source
  • 5 Disclosure of sold/ booked inventory31-03-2024_11zon.pdf · uploaded 9 Apr 2025Source
  • 6 Disclosure of sold/ booked inventory31-12-2024_11zon.pdf · uploaded 9 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorycircular 29 3112204.pdf · uploaded 25 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Cyber Works as on March 2025.pdf · uploaded 8 May 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)26 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 8 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Cyber Works as on March 2025.pdf · uploaded 8 May 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)21 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 8 May 2025Source
  • 1 Disclosure of sold/ booked inventoryCyber Works 30-06-2024_11zon.pdf · uploaded 15 May 2025Source
  • 2 Disclosure of sold/ booked inventoryCyber Works 30-06-2024_11zon.pdf · uploaded 15 May 2025Source
  • 3 Disclosure of sold/ booked inventoryCyber Works 30-09-2024_11zon.pdf · uploaded 15 May 2025Source
  • 4 Disclosure of sold/ booked inventorycircular 29 3112204.pdf · uploaded 15 May 2025Source
  • 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate - CYBER WORKS.pdf · uploaded 15 May 2025Source
  • 1 Disclosure of sold/ booked inventoryCircular 29 31032025_compressed.pdf · uploaded 19 May 2025Source
  • 2 Disclosure of sold/ booked inventory12 Disclosure of sold_ booked inventory.pdf · uploaded 19 May 2025Source
  • 3 Disclosure of sold/ booked inventoryJun e 2024 WOrkls.pdf · uploaded 19 May 2025Source
  • 4 Disclosure of sold/ booked inventory11 Disclosure Sep 2024.pdf · uploaded 19 May 2025Source
  • 5 Disclosure of sold/ booked inventory12 Disclosure of sold_ booked inventory.pdf · uploaded 19 May 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)27 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 20 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)22 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 20 May 2025Source
  • Form 1Form 1 - Cyber Works as on March 2025.pdf · uploaded 8 Sep 2025Source
  • Form 1Form 1 - Cyber Works as on June 2025.pdf · uploaded 8 Sep 2025Source
  • Form 2Form 2 - Cyber Works as on March 2025.pdf · uploaded 8 Sep 2025Source
  • Form 2Form 2 - Cyber Works as on June 2025.pdf · uploaded 8 Sep 2025Source
  • Form 3Form 3 - Cyber Works as on March 2025.pdf · uploaded 8 Sep 2025Source
  • Form 3Form 3 - Cyber Works as on June 2025.pdf · uploaded 8 Sep 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Cyber Works as on March 2025.pdf · uploaded 8 Sep 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 - Cyber Works as on June 2025.pdf · uploaded 8 Sep 2025Source
  • Withdrawal Update Form 1Form 1 - Cyber Works as on June 2025.pdf · uploaded 17 Sep 2025Source
  • Withdrawal Update Form 2Form 2 - Cyber Works as on June 2025.pdf · uploaded 17 Sep 2025Source
  • Withdrawal Update Form 3Form 3 - Cyber Works as on June 2025.pdf · uploaded 17 Sep 2025Source
  • Withdrawal Update Form 1Form 1 - Cyber Works as on Sep 2025.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 2Form 2 - Cyber Works as on Sep 2025.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 3Form 3 - Cyber Works as on Sep 2025.pdf · uploaded 24 Nov 2025Source
  • Withdrawal Update Form 1Form 1 - Cyber Works as on Dec 2025.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 2Form 2 - Cyber Works as on Dec 2025.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 3Form 3 - Cyber Works as on Dec 2025_compressed.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 1Form 1 - Cyber Works as on March 2026.pdf · uploaded 7 May 2026Source
  • Withdrawal Update Form 2Form 2 - Cyber Works as on March 2026.pdf · uploaded 7 May 2026Source
  • Withdrawal Update Form 3Form 3 - Cyber Works as on March 2026.pdf · uploaded 7 May 2026Source
  • Form 2A (FY 2024-2025)Form 2A FY 2024-25.pdf · uploaded 7 May 2026Source
  • Form 5 (FY 2024-2025)Form 5 FY 2024-25.pdf · uploaded 7 May 2026Source
  • Form 2A (FY 2025-2026)Cyber Works Form 2A 2025-26.pdf · uploaded 22 Jun 2026Source
  • Withdrawal Update Form 1Form 1 - Cyber Works as on June 2026.pdf · uploaded 27 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Cyber Works as on June 2026.pdf · uploaded 27 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Cyber Works as on June 2026_compressed.pdf · uploaded 27 Jul 2026Source
  • Withdrawal Update Form 1Form 1 - Cyber Works as on June 2026.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 1Form 1 - Cyber Works as on June 2026.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Cyber Works as on June 2026.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - Cyber Works as on June 2026.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Cyber Works as on June 2026_compressed.pdf · uploaded 30 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - Cyber Works as on June 2026_compressed (1).pdf · uploaded 30 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5 - Cyber Works - 2025-26_compressed.pdf · uploaded 6 Oct 2026Source

Technical

  • DocumentLayout Approval.pdf · uploaded 26 Sep 2019Source
  • DocumentBuilding Plan Approval - 6.pdf · uploaded 26 Sep 2019Source
  • DocumentBuilding Plan Approval - 2.pdf · uploaded 26 Sep 2019Source
  • DocumentBuilding Plan Approval - 3.pdf · uploaded 26 Sep 2019Source
  • DocumentBuilding Plan Approval - 4.pdf · uploaded 26 Sep 2019Source
  • DocumentBuilding Plan Approval - 5.pdf · uploaded 26 Sep 2019Source
  • DocumentBuilding Plan Approval - 1.pdf · uploaded 26 Sep 2019Source
  • DocumentDrawing A_606_1A_compressed.pdf · uploaded 3 Apr 2023Source
  • Document1.pdf · uploaded 20 Mar 2025Source
  • Document2.pdf · uploaded 20 Mar 2025Source
  • Document3.pdf · uploaded 20 Mar 2025Source
  • Document4.pdf · uploaded 20 Mar 2025Source
  • Document5.pdf · uploaded 20 Mar 2025Source
  • Document6.pdf · uploaded 20 Mar 2025Source
  • Document7.pdf · uploaded 20 Mar 2025Source
  • Document8.pdf · uploaded 20 Mar 2025Source
  • DocumentPage 1 - Highlighted (Permissible) (Sanctioned BUA) (Parking).pdf · uploaded 13 Aug 2026Source
  • DocumentPage 2 - Ground Floor and Podium Floor Plans.pdf · uploaded 22 Aug 2026Source
  • DocumentPage 3 - 4th and 7th Floor Plan.pdf · uploaded 22 Aug 2026Source
  • DocumentPage 4 - 9th Floor and Typical Floor Plans.pdf · uploaded 22 Aug 2026Source
  • DocumentPage 5 - Typical Floor Plans.pdf · uploaded 22 Aug 2026Source
  • DocumentPage 6 - Typical Floor Plans.pdf · uploaded 22 Aug 2026Source
  • DocumentPage 7 - Floors Plans.pdf · uploaded 22 Aug 2026Source
  • DocumentPage 8 - Floor Plans.pdf · uploaded 22 Aug 2026Source
  • DocumentPage 9 - Elevation.pdf · uploaded 22 Aug 2026Source
  • DocumentPage 10 - Elevation.pdf · uploaded 22 Aug 2026Source

Technical (Architect)

  • DocumentForm 1 June 24.pdf · uploaded 7 Oct 2024Source
  • DocumentForm 1 June 24.pdf · uploaded 7 Oct 2024Source
  • DocumentForm 1 CYBER WORKS Sept Quarter.pdf · uploaded 20 Jan 2025Source
  • DocumentForm 1 Dec 2022.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Dec 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Sept 2022.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Dec 2022.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 March 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Sept 2023_11zon.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 June 2024.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Sept 2022.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Dec 2022.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 March 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 June 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Sept 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Dec 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 March 2024.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 June 2024.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Sept 2024.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 Dec 2024_compressed.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 1 - Cyber Works as on March 2025.pdf · uploaded 8 May 2025Source
  • Document26 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 8 May 2025Source
  • Document27 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 20 May 2025Source
  • DocumentForm 1 - Cyber Works as on June 2026.pdf · uploaded 30 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 June 2024.pdf · uploaded 7 Oct 2024Source
  • DocumentForm 2 June 2024.pdf · uploaded 7 Oct 2024Source
  • DocumentForm 2 CYBER WORKS Sept Quarter.pdf · uploaded 20 Jan 2025Source
  • DocumentAug 2019.pdf · uploaded 27 Feb 2025Source
  • DocumentSept 2022.pdf · uploaded 27 Feb 2025Source
  • DocumentDec 2022.pdf · uploaded 27 Feb 2025Source
  • DocumentMarch 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentJune 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentSept 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentDec 2023.pdf · uploaded 27 Feb 2025Source
  • DocumentMarch 2024.pdf · uploaded 27 Feb 2025Source
  • DocumentJune 2024.pdf · uploaded 27 Feb 2025Source
  • DocumentSept 2024.pdf · uploaded 27 Feb 2025Source
  • DocumentDec 2024.pdf · uploaded 27 Feb 2025Source
  • DocumentForm 2 - Cyber Works as on March 2025.pdf · uploaded 8 May 2025Source
  • Document21 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 8 May 2025Source
  • Document22 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 20 May 2025Source
  • DocumentForm 2 - Cyber Works as on June 2026.pdf · uploaded 30 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Navi Mumbai (M Corp.), Thane taluka

Survey, CTS, gat or plot numbers

A-606/1A

Boundaries

North
Plot No A-606 1-B
South
Village Road
East
Midc 20m Wide Road
West
Plot No A-607

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantNaina Jain—
EngineerSiddheshwar Jagtap—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology