Continental Signature

Active

Navi Mumbai (M Corp.), Thane 400706 |Promoter: Sacvir Realtors LLP

9 Aug 2024Registered with MahaRERA
31 Dec 2029Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Active
Buildings
1
Land area for this project
2,660 sq m (28,630 sq ft)
Permissible built-up area
12,345 sq m (1,32,884 sq ft)
Sanctioned built-up area
12,345 sq m (1,32,884 sq ft)
Recreational open space
0 sq m (0 sq ft)
Planning authority
navi mumbai municipal corporation
Address
Gut No. 17, Plot No. 182 D, Sector 17, Sector 17, NerulPIN 400706
Designated bank account
Au Small Finance Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
Yes

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Continental Signature is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2029

Registered
9 Aug 2024
Promised
31 Dec 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000773349 Aug 202431 Dec 2029—Sacvir Realtors LLPProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
ContinentalSignature25—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered12518300308
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

ContinentalSignature

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure63%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises29%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & Footpaths0%
  • Water Supply0%
  • Sewerage (Chamber, Lines, Septic Tank , STP)0%
  • Storm Water Drains0%
  • Landscaping & Tree Planting0%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingOnly Rain Water Harvesting Tank to be provided100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirements0%
  • Electrical meter room, sub-station, receiving station0%
  • Aggregate area of recreational Open Space0%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

57 documents held by Deedo, 71 filings listed on MahaRERA's project page

Others

Registration certificate

Document library

  • Copy of the legal title reportJimmy Park RERA Title report.pdf · uploaded 4 Apr 2024View
  • a Details of encumbrances concerned to Financedetails of encumbrance.pdf · uploaded 4 Apr 2024View
  • b Details of encumbrances concerned to Legaldetails of encumbrance.pdf · uploaded 4 Apr 2024View
  • CERSAI detailsCERSAI_Search_Report.pdf · uploaded 4 Apr 2024View
  • Proforma of Allotment letterCS Allotment Letter Draft.pdf · uploaded 4 Apr 2024View
  • Deviation Report with respect to Allotment letterALLOTMENT LETTER (2).pdf · uploaded 5 Apr 2024View
  • Commencement Certificates / NA Order for plotted developmentCC covering letter (1).pdf · uploaded 5 Apr 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnexure A sachin dhkatode.pdf · uploaded 6 Apr 2024View
  • Disclosure of Interest in Other Real Estate OrganizationsAnexure A virji dhadhi (1).pdf · uploaded 24 Apr 2024View
  • Proforma of Agreement for saleDraft Agreement for Sale.pdf · uploaded 16 May 2024View
  • Deviation Report with respect to model copy of AgreementDeviation Report.pdf · uploaded 30 May 2024View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 3 Jul 2024View
  • a Details of encumbrances concerned to FinanceSelf Declaration.pdf · uploaded 3 Jul 2024View
  • b Details of encumbrances concerned to LegalSelf Declaration.pdf · uploaded 3 Jul 2024View
  • Declaration about Commencement CertificateFormat D_page-0001.pdf · uploaded 4 Jul 2024View
  • Declaration in FORM BForm B - Promoter .pdf · uploaded 5 Jul 2024View
  • Copy of Layout Approval (in case of layout)CC drawings 19-03-2024_compressed.pdf · uploaded 9 Jul 2024View
  • Building Plan Approval / NA Order for plotted developmentCC drawings 19-03-2024_compressed.pdf · uploaded 9 Jul 2024View
  • Other – TechnicalANEEXUER R1.pdf · uploaded 10 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Jimmy Park_Form 1_page-0001.pdf · uploaded 10 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_page-0001.pdf · uploaded 10 Jul 2024View
  • Deviation Report with respect to model copy of AgreementDraft Agreement for Sale 22032024 .pdf · uploaded 29 Apr 2025View
  • Proforma of Agreement for saleDraft Agreement for Sale 22032024 .pdf · uploaded 29 Apr 2025View
  • a Details of encumbrances concerned to FinanceEncumbrance on redevelopment of Jimmy Park.pdf · uploaded 30 Apr 2025View
  • b Details of encumbrances concerned to LegalEncumbrance on redevelopment of Jimmy Park.pdf · uploaded 30 Apr 2025View
  • Disclosure of sold/ booked inventoryDisclosure of Inventory.pdf · uploaded 23 Jul 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 as on 31122024.pdf · uploaded 23 Jul 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 as on 31122024.pdf · uploaded 23 Jul 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 as on 310325.pdf · uploaded 23 Jul 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 as on 310325.pdf · uploaded 23 Jul 2025View
  • Disclosure for secured/unsecured finance availed for the projectDiclouser of secured and unsecured finance_with CA certi.pdf · uploaded 24 Jul 2025View
  • Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Order no 56_Format B Banks letter head.pdf · uploaded 24 Jul 2025View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameCir 43_declaration cum undertaking.pdf · uploaded 24 Jul 2025View
  • Withdrawal Update Form 1Form 1 as on 3112025.pdf · uploaded 22 Apr 2026View
  • Withdrawal Update Form 2Form 2 as on 31 12 2025.pdf · uploaded 22 Apr 2026View
  • Withdrawal Update Form 1Form 1 as on 3112025.pdf · uploaded 22 Apr 2026View
  • Withdrawal Update Form 2Form 2 as on 31 12 2025.pdf · uploaded 22 Apr 2026View
  • Withdrawal Update Form 1Form 1 as on 3112025.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 2Form 2 as on 31 12 2025.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 1Form 1 as on 3112025.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 2Form 2 as on 31 12 2025.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 1Form 1 30092025.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 2Form 2 30092025.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 1Form 1 30092025.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 2Form 2 30092025.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 1Form 1 as on 3112025.pdf · uploaded 27 Apr 2026View
  • Withdrawal Update Form 2Form 2 as on 31 12 2025.pdf · uploaded 27 Apr 2026View
  • Form 2A (FY 2024-2025)Form 2A_2024-25.pdf · uploaded 12 May 2026View
  • Form 2A (FY 2025-2026)Form 2A_2025-26.pdf · uploaded 12 May 2026View
  • Form 5 (FY 2024-2025)Continental Signture form 5 2024-25.pdf · uploaded 3 Jun 2026View
  • Withdrawal Update Form 1Form1as on 31032026.pdf · uploaded 17 Jun 2026View
  • Withdrawal Update Form 2Form 2 as on 31032026.pdf · uploaded 17 Jun 2026View
  • Withdrawal Update Form 1Form 1 as on 30062026.pdf · uploaded 7 Aug 2026View
  • Withdrawal Update Form 2Form 2 as on 30062026.pdf · uploaded 7 Aug 2026View

Promoter documents

  • Legal Title reportJimmy Park RERA Title report.pdf · uploaded 4 Apr 2024View
  • Declaration Form BForm B - Promoter .pdf · uploaded 5 Jul 2024View

Technical documents

  • Layout ApprovalCC drawings 19-03-2024_compressed.pdfView
  • Building Plan ApprovalCC drawings 19-03-2024_compressed.pdfView
  • Building Plan Approval01-Highlighted carpet area and FSI parking.pdfView
  • Building Plan Approval02-1st floor podium plan.pdfView
  • Building Plan Approval03-2nd floor podium plan.pdfView
  • Building Plan Approval04-3rd floor podium plan.pdfView
  • Building Plan Approval05-4th floor podum plan.pdfView
  • Building Plan Approval06-5th floor podium plan.pdfView
  • Building Plan Approval07-6th floor podium plan.pdfView
  • Building Plan Approval08-7th and 8th floor plan.pdfView
  • Building Plan Approval09-9th floor to 24th floor plan.pdfView
  • Building Plan Approval10-refuge floor plan.pdfView
  • Building Plan Approval11-Elevation and section plan.pdfView

Commencement certificates and NA orders

  • Commencement certificate / NA orderSource

Proforma allotment letter

  • Proforma allotment letterCS Allotment Letter Draft.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Navi Mumbai (M Corp.), Thane taluka

Survey, CTS, gat or plot numbers

Gut No. 17Plot No. 182 DSector 17

As published on MahaRERA's project page

Gut No. 17, Plot No. 182 D, Sector 17

Boundaries

North
Ayappa Garden
South
Main Road
East
Jimmy Park 2
West
Punit Park

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHiten sethi—
ArchitectHiten Shethi & Associates—
Chartered accountantManish Ranpariya—
Chartered accountantR C & Jain Associates LLP—
Chartered accountantTodi Tulsyan & Co.—
EngineerUniversal Consultants and Valuers LLP—

Source: MahaRERA project page. Contact details are not shown.

Data through12 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology