Skip to content

Aniruddha Icon

Certificate Signed

Navi Mumbai (M Corp.), Thane 400706 |Promoter: Hariom Developers

8 Jun 2023Registered with MahaRERA
31 Dec 2027Promised completion
30 Apr 2028Revised completionPushed back 4 months
1Building
104Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
2BHK, 3BHK, 4BHK, Shop104 units in all
Address
Plot No.24, Sec-29, Nerul East, Sec-29, Nerul EastPIN 400706
Designated bank account
82
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.03647, 73.01895
Aniruddha Icon is at latitude 19.03647, longitude 73.01895.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
8 Jun 2023
Promised
31 Dec 2027
Revised
30 Apr 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000512628 Jun 202331 Dec 202730 Apr 2028Hariom DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Aniruddha Icon17104

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 104 units booked (0%), as the promoter reported to MahaRERA

2BHK · 55 units3BHK · 34 units4BHK · 2 unitsShop · 13 units
TypeCarpet areaUnitsBooked
2BHK50.41 sq m · 543 sq ft20
2BHK56.72 sq m · 611 sq ft10
2BHK56.78 sq m · 611 sq ft10
2BHK59.42 sq m · 640 sq ft10
2BHK59.48 sq m · 640 sq ft140
2BHK63.91 sq m · 688 sq ft20
2BHK66.12 sq m · 712 sq ft20
2BHK66.72 sq m · 718 sq ft140
Show all 24 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK66.99 sq m · 721 sq ft10
2BHK86.81 sq m · 934 sq ft10
2BHK86.85 sq m · 935 sq ft160
3BHK82.46 sq m · 888 sq ft10
3BHK84.03 sq m · 904 sq ft20
3BHK84.04 sq m · 905 sq ft310
4BHK115.65 sq m · 1,245 sq ft20
Shop16.62 sq m · 179 sq ft10
Shop40.47 sq m · 436 sq ft20
Shop42.63 sq m · 459 sq ft10
Shop43.05 sq m · 463 sq ft10
Shop44.44 sq m · 478 sq ft10
Shop44.88 sq m · 483 sq ft20
Shop49.3 sq m · 531 sq ft30
Shop50.81 sq m · 547 sq ft10
Shop60.16 sq m · 648 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 128 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardHari Om Developers Pan Card 000254.pdf · uploaded 18 Apr 2023Source

Legal

  • Legal Title reportTitle Report_Compressed.pdf · uploaded 18 Apr 2023Source
  • Declaration Form BForm B.pdf · uploaded 22 Apr 2023Source

Migrated

  • 1 PAN CardHari Om Developers Pan Card 000254.pdf · uploaded 18 Apr 2023Source
  • 1 Copy of the legal title reportTitle Report_Compressed.pdf · uploaded 18 Apr 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Hari om_Compressed.pdf · uploaded 18 Apr 2023Source
  • 1 Copy of Layout Approval (in case of layout)LayOut Plan.pdf · uploaded 21 Apr 2023Source
Show all 129 documentsShow fewer documents

Migrated

  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA plot 24 sec 29 nerul Rcc Letter_.pdf · uploaded 21 Apr 2023Source
  • 1 Deviation Report with respect to Allotment letterDevation Letter.pdf · uploaded 21 Apr 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDevation Letter.pdf · uploaded 21 Apr 2023Source
  • 1 a Details of encumbrances concerned to FinanceFinance Encumbrance.pdf · uploaded 22 Apr 2023Source
  • 2 a Details of encumbrances concerned to Financelegal encumbrance.pdf · uploaded 22 Apr 2023Source
  • 1 b Details of encumbrances concerned to LegalFinance Encumbrance.pdf · uploaded 22 Apr 2023Source
  • 2 b Details of encumbrances concerned to Legallegal encumbrance.pdf · uploaded 22 Apr 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentscan1.pdf · uploaded 22 Apr 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentscan2.pdf · uploaded 22 Apr 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentscan3.pdf · uploaded 22 Apr 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentscan4.pdf · uploaded 22 Apr 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentscan5.pdf · uploaded 22 Apr 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentscan6.pdf · uploaded 22 Apr 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentscan7.pdf · uploaded 22 Apr 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentscan8.pdf · uploaded 22 Apr 2023Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 22 Apr 2023Source
  • 2 Copy of Layout Approval (in case of layout)1 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 24 Apr 2023Source
  • 1 CERSAI detailsCERSAI_Search_Report_200266813809_For_Asset_Based_Search_24_04_2023_12_08_32_375.pdf · uploaded 24 Apr 2023Source
  • 2 CERSAI detailsCERSAI_Search_Report_200266813877_For_Asset_Based_Search_24_04_2023_12_08_42_289.pdf · uploaded 24 Apr 2023Source
  • 1 Other – TechnicalCredai Certificate.pdf · uploaded 24 Apr 2023Source
  • 1 Proforma of Agreement for saleRERA-Agreement-Hari Om-Nerul.pdf · uploaded 25 Apr 2023Source
  • 1 Proforma of Allotment letterRERA Allotment-Aniruddha-ICON-.pdf · uploaded 25 Apr 2023Source
  • 1 Disclosure of Interest in Other Real Estate Organizationskrunal chawala.pdf · uploaded 26 Apr 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsArjun Deshmukh (1).pdf · uploaded 26 Apr 2023Source
  • 3 Disclosure of Interest in Other Real Estate Organizationsvinod Kumar Chavala.pdf · uploaded 26 Apr 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsNirmala Deshmukh (2).pdf · uploaded 26 Apr 2023Source
  • 1 Declaration about Commencement CertificateLayOut Plan.pdf · uploaded 27 Apr 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameOrder 34 20230502_15094410.pdf · uploaded 2 May 2023Source
  • 2 Declaration about Commencement CertificateFormat D20230503_17250668.pdf · uploaded 3 May 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ilovepdf_merged(1).pdf · uploaded 5 Jun 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-ANIRUDDHA ICON_SEP 23.pdf · uploaded 13 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-ANIRUDDHA ICON_DEC 23.pdf · uploaded 13 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-ANIRUDDHA ICON_SEP 23.pdf · uploaded 13 Feb 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-ANIRUDDHA ICON_DEC 23.pdf · uploaded 13 Feb 2024Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD-ANIRUDDHA ICON_SEP 23.pdf · uploaded 13 Feb 2024Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD-ANIRUDDHA ICON_DEC 23.pdf · uploaded 13 Feb 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-ANIRUDDHA ICON_SEP 23.pdf · uploaded 13 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 21 Feb 2024Source
  • 9 Building Plan Approval / NA Order for plotted development1_compressed.pdf · uploaded 27 Mar 2024Source
  • 10 Building Plan Approval / NA Order for plotted development2_compressed.pdf · uploaded 27 Mar 2024Source
  • 11 Building Plan Approval / NA Order for plotted development3_compressed.pdf · uploaded 27 Mar 2024Source
  • 12 Building Plan Approval / NA Order for plotted development4_compressed.pdf · uploaded 27 Mar 2024Source
  • 13 Building Plan Approval / NA Order for plotted development5_compressed.pdf · uploaded 27 Mar 2024Source
  • 14 Building Plan Approval / NA Order for plotted development6_compressed.pdf · uploaded 27 Mar 2024Source
  • 15 Building Plan Approval / NA Order for plotted development7_compressed.pdf · uploaded 27 Mar 2024Source
  • 16 Building Plan Approval / NA Order for plotted development8_compressed.pdf · uploaded 27 Mar 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 27 Mar 2024Source
  • 2 Proforma of Agreement for saleFinal RERA-Agreement-Hari Om-Nerul Revised.pdf · uploaded 26 Jun 2024Source
  • 3 Proforma of Agreement for salePDF.pdf · uploaded 1 Jul 2024Source
  • 3 a Details of encumbrances concerned to FinanceSelf - Declaration Regarding Encumbrance.pdf · uploaded 8 Aug 2024Source
  • 3 b Details of encumbrances concerned to LegalSelf - Declaration Regarding Encumbrance.pdf · uploaded 8 Aug 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ MARCH 24.pdf · uploaded 7 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ JUNE 24.pdf · uploaded 7 Apr 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ SEP 24.pdf · uploaded 7 Apr 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ DEC 24.pdf · uploaded 7 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ MARCH 24_compressed.pdf · uploaded 7 Apr 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ JUNE 24_compressed.pdf · uploaded 7 Apr 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ SEP 24_compressed.pdf · uploaded 7 Apr 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ DEC 24_compressed.pdf · uploaded 7 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ MARCH 24.pdf · uploaded 7 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ JUNE 24.pdf · uploaded 7 Apr 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ SEP 24.pdf · uploaded 7 Apr 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ DEC 24.pdf · uploaded 7 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD_ MARCH 24.pdf · uploaded 7 Apr 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD_ JUNE 24.pdf · uploaded 7 Apr 2025Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD_ SEP 24.pdf · uploaded 7 Apr 2025Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD _DEC 24.pdf · uploaded 7 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 23-24.pdf · uploaded 11 Apr 2025Source
  • 1 Proforma of Agreement for saleFinal RERA-Agreement-Hari Om-Nerul New 5-4-25.pdf · uploaded 10 May 2025Source
  • Form 1FORM 1_ MARCH 25.pdf · uploaded 11 Jul 2025Source
  • Form 2FORM 2_ MARCH 25.pdf · uploaded 11 Jul 2025Source
  • Form 3FORM 3_ MARCH 25_ ANIRUDDHA ICON_compressed.pdf · uploaded 11 Jul 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ MARCH 25.pdf · uploaded 11 Jul 2025Source
  • Withdrawal Update Form 1FORM 1_ MARCH 25.pdf · uploaded 11 Jul 2025Source
  • Withdrawal Update Form 2FORM 2_ MARCH 25.pdf · uploaded 11 Jul 2025Source
  • Withdrawal Update Form 3FORM 3_ MARCH 25_ ANIRUDDHA ICON_compressed.pdf · uploaded 11 Jul 2025Source
  • Withdrawal Update Form 1FORM 1_ JUNE 25_ ANIRUDDHA ICON.pdf · uploaded 23 Jul 2025Source
  • Withdrawal Update Form 2FORM 2_ JUNE 25_ ANIRUDDHA ICON.pdf · uploaded 23 Jul 2025Source
  • Withdrawal Update Form 3FORM 3_ JUNE 25_ ANIRUDDHA ICON.pdf · uploaded 23 Jul 2025Source
  • Form 2A (FY 2024-2025)FORM 2A_2024-25.pdf · uploaded 19 Jan 2026Source
  • Withdrawal Update Form 1FORM 1_ SEP 25_ ANIRUDDHA ICON (1).pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 1FORM 1_DEC 25_ANIRUDDHA ICON.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 2FORM 2_ SEP 25_ ANIRUDDHA ICON (1).pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 2FORM 2_DEC 25_ANIRUDDHA ICON.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 3FORM 3_ SEP 25_ ANIRUDDHA ICON (1).pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 3FORM 3_ DEC 25_ ANIRUDDHA ICON.pdf · uploaded 4 Mar 2026Source
  • Withdrawal Update Form 1FORM 1_ MARCH 26_ ANIRUDDHA ICON.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 2FORM 2_ MARCH 26_ ANIRUDDHA ICON.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 3FORM 3_ MARCH 26_ ANIRUDDHA ICON.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 1FORM 1_ JUNE 26_ ANIRUDDHA ICON.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 2FORM 2_ JUNE 26_ ANIRUDDHA ICON.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 3FORM 3_ JUNE 26_ ANNIRUDDHA ICON.pdf · uploaded 21 Jul 2026Source

Technical

  • DocumentLayOut Plan.pdf · uploaded 21 Apr 2023Source
  • Documentscan1.pdf · uploaded 22 Apr 2023Source
  • Documentscan2.pdf · uploaded 22 Apr 2023Source
  • Documentscan3.pdf · uploaded 22 Apr 2023Source
  • Documentscan4.pdf · uploaded 22 Apr 2023Source
  • Documentscan5.pdf · uploaded 22 Apr 2023Source
  • Documentscan6.pdf · uploaded 22 Apr 2023Source
  • Documentscan7.pdf · uploaded 22 Apr 2023Source
  • Documentscan8.pdf · uploaded 22 Apr 2023Source
  • Document1 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 24 Apr 2023Source
  • Other – TechnicalCredai Certificate.pdf · uploaded 24 Apr 2023Source
  • Document1_compressed.pdf · uploaded 27 Mar 2024Source
  • Document2_compressed.pdf · uploaded 27 Mar 2024Source
  • Document3_compressed.pdf · uploaded 27 Mar 2024Source
  • Document4_compressed.pdf · uploaded 27 Mar 2024Source
  • Document5_compressed.pdf · uploaded 27 Mar 2024Source
  • Document6_compressed.pdf · uploaded 27 Mar 2024Source
  • Document7_compressed.pdf · uploaded 27 Mar 2024Source
  • Document8_compressed.pdf · uploaded 27 Mar 2024Source

Technical (Architect)

  • DocumentFORM 1_ MARCH 24.pdf · uploaded 7 Apr 2025Source
  • DocumentFORM 1_ JUNE 24.pdf · uploaded 7 Apr 2025Source
  • DocumentFORM 1_ SEP 24.pdf · uploaded 7 Apr 2025Source
  • DocumentFORM 1_ DEC 24.pdf · uploaded 7 Apr 2025Source
  • DocumentFORM 1_ JUNE 26_ ANIRUDDHA ICON.pdf · uploaded 21 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2_ MARCH 24.pdf · uploaded 7 Apr 2025Source
  • DocumentFORM 2_ JUNE 24.pdf · uploaded 7 Apr 2025Source
  • DocumentFORM 2_ SEP 24.pdf · uploaded 7 Apr 2025Source
  • DocumentFORM 2_ DEC 24.pdf · uploaded 7 Apr 2025Source
  • DocumentFORM 2_ JUNE 26_ ANIRUDDHA ICON.pdf · uploaded 21 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Navi Mumbai (M Corp.), Thane taluka

Survey, CTS, gat or plot numbers

PLOT NO.24SEC29

Boundaries

North
Plot No 23
South
Plot No 25
East
15 Mtr Existing Road
West
Railway Corridor

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectDimensions Architects Pvt Ltd—
Chartered accountantB R Sawant & Co—
Chartered accountantCa Sushant Alme—
Chartered accountantNirav M Haria And Co—
EngineerAgharkar Consultants—
EngineerBipin Maurya—
OtherRajendra D Tambe—
OtherShree Kodiyar Constructions—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology