Certificate SignedNavi Mumbai (M Corp.), Thane 400706 |Promoter: Hariom Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK, 3BHK, 4BHK, Shop104 units in all
- Address
- Plot No.24, Sec-29, Nerul East, Sec-29, Nerul EastPIN 400706
- Designated bank account
- 82
- Developed in phases
- No
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 8 Jun 2023
- Promised
- 31 Dec 2027
- Revised
- 30 Apr 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700051262 | 8 Jun 2023 | 31 Dec 2027 | 30 Apr 2028 | Hariom Developers | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Aniruddha Icon | 17 | 104 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
0 of 104 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 50.41 sq m · 543 sq ft | 2 | 0 |
| 2BHK | 56.72 sq m · 611 sq ft | 1 | 0 |
| 2BHK | 56.78 sq m · 611 sq ft | 1 | 0 |
| 2BHK | 59.42 sq m · 640 sq ft | 1 | 0 |
| 2BHK | 59.48 sq m · 640 sq ft | 14 | 0 |
| 2BHK | 63.91 sq m · 688 sq ft | 2 | 0 |
| 2BHK | 66.12 sq m · 712 sq ft | 2 | 0 |
| 2BHK | 66.72 sq m · 718 sq ft | 14 | 0 |
Show all 24 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 66.99 sq m · 721 sq ft | 1 | 0 |
| 2BHK | 86.81 sq m · 934 sq ft | 1 | 0 |
| 2BHK | 86.85 sq m · 935 sq ft | 16 | 0 |
| 3BHK | 82.46 sq m · 888 sq ft | 1 | 0 |
| 3BHK | 84.03 sq m · 904 sq ft | 2 | 0 |
| 3BHK | 84.04 sq m · 905 sq ft | 31 | 0 |
| 4BHK | 115.65 sq m · 1,245 sq ft | 2 | 0 |
| Shop | 16.62 sq m · 179 sq ft | 1 | 0 |
| Shop | 40.47 sq m · 436 sq ft | 2 | 0 |
| Shop | 42.63 sq m · 459 sq ft | 1 | 0 |
| Shop | 43.05 sq m · 463 sq ft | 1 | 0 |
| Shop | 44.44 sq m · 478 sq ft | 1 | 0 |
| Shop | 44.88 sq m · 483 sq ft | 2 | 0 |
| Shop | 49.3 sq m · 531 sq ft | 3 | 0 |
| Shop | 50.81 sq m · 547 sq ft | 1 | 0 |
| Shop | 60.16 sq m · 648 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 128 filings listed on MahaRERA's project page
Finance
- PAN CardHari Om Developers Pan Card 000254.pdf · uploaded 18 Apr 2023Source
Legal
Migrated
- 1 PAN CardHari Om Developers Pan Card 000254.pdf · uploaded 18 Apr 2023Source
- 1 Copy of the legal title reportTitle Report_Compressed.pdf · uploaded 18 Apr 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate Hari om_Compressed.pdf · uploaded 18 Apr 2023Source
- 1 Copy of Layout Approval (in case of layout)LayOut Plan.pdf · uploaded 21 Apr 2023Source
Show all 129 documentsShow fewer documents
Migrated
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA plot 24 sec 29 nerul Rcc Letter_.pdf · uploaded 21 Apr 2023Source
- 1 Deviation Report with respect to Allotment letterDevation Letter.pdf · uploaded 21 Apr 2023Source
- 1 Deviation Report with respect to model copy of AgreementDevation Letter.pdf · uploaded 21 Apr 2023Source
- 1 a Details of encumbrances concerned to FinanceFinance Encumbrance.pdf · uploaded 22 Apr 2023Source
- 2 a Details of encumbrances concerned to Financelegal encumbrance.pdf · uploaded 22 Apr 2023Source
- 1 b Details of encumbrances concerned to LegalFinance Encumbrance.pdf · uploaded 22 Apr 2023Source
- 2 b Details of encumbrances concerned to Legallegal encumbrance.pdf · uploaded 22 Apr 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentscan1.pdf · uploaded 22 Apr 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentscan2.pdf · uploaded 22 Apr 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentscan3.pdf · uploaded 22 Apr 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentscan4.pdf · uploaded 22 Apr 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentscan5.pdf · uploaded 22 Apr 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentscan6.pdf · uploaded 22 Apr 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentscan7.pdf · uploaded 22 Apr 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentscan8.pdf · uploaded 22 Apr 2023Source
- 1 Declaration in FORM BForm B.pdf · uploaded 22 Apr 2023Source
- 2 Copy of Layout Approval (in case of layout)1 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 24 Apr 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200266813809_For_Asset_Based_Search_24_04_2023_12_08_32_375.pdf · uploaded 24 Apr 2023Source
- 2 CERSAI detailsCERSAI_Search_Report_200266813877_For_Asset_Based_Search_24_04_2023_12_08_42_289.pdf · uploaded 24 Apr 2023Source
- 1 Other – TechnicalCredai Certificate.pdf · uploaded 24 Apr 2023Source
- 1 Proforma of Agreement for saleRERA-Agreement-Hari Om-Nerul.pdf · uploaded 25 Apr 2023Source
- 1 Proforma of Allotment letterRERA Allotment-Aniruddha-ICON-.pdf · uploaded 25 Apr 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizationskrunal chawala.pdf · uploaded 26 Apr 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsArjun Deshmukh (1).pdf · uploaded 26 Apr 2023Source
- 3 Disclosure of Interest in Other Real Estate Organizationsvinod Kumar Chavala.pdf · uploaded 26 Apr 2023Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsNirmala Deshmukh (2).pdf · uploaded 26 Apr 2023Source
- 1 Declaration about Commencement CertificateLayOut Plan.pdf · uploaded 27 Apr 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameOrder 34 20230502_15094410.pdf · uploaded 2 May 2023Source
- 2 Declaration about Commencement CertificateFormat D20230503_17250668.pdf · uploaded 3 May 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)ilovepdf_merged(1).pdf · uploaded 5 Jun 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-ANIRUDDHA ICON_SEP 23.pdf · uploaded 13 Feb 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-ANIRUDDHA ICON_DEC 23.pdf · uploaded 13 Feb 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-ANIRUDDHA ICON_SEP 23.pdf · uploaded 13 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2-ANIRUDDHA ICON_DEC 23.pdf · uploaded 13 Feb 2024Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD-ANIRUDDHA ICON_SEP 23.pdf · uploaded 13 Feb 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD-ANIRUDDHA ICON_DEC 23.pdf · uploaded 13 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3-ANIRUDDHA ICON_SEP 23.pdf · uploaded 13 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 21 Feb 2024Source
- 9 Building Plan Approval / NA Order for plotted development1_compressed.pdf · uploaded 27 Mar 2024Source
- 10 Building Plan Approval / NA Order for plotted development2_compressed.pdf · uploaded 27 Mar 2024Source
- 11 Building Plan Approval / NA Order for plotted development3_compressed.pdf · uploaded 27 Mar 2024Source
- 12 Building Plan Approval / NA Order for plotted development4_compressed.pdf · uploaded 27 Mar 2024Source
- 13 Building Plan Approval / NA Order for plotted development5_compressed.pdf · uploaded 27 Mar 2024Source
- 14 Building Plan Approval / NA Order for plotted development6_compressed.pdf · uploaded 27 Mar 2024Source
- 15 Building Plan Approval / NA Order for plotted development7_compressed.pdf · uploaded 27 Mar 2024Source
- 16 Building Plan Approval / NA Order for plotted development8_compressed.pdf · uploaded 27 Mar 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 27 Mar 2024Source
- 2 Proforma of Agreement for saleFinal RERA-Agreement-Hari Om-Nerul Revised.pdf · uploaded 26 Jun 2024Source
- 3 Proforma of Agreement for salePDF.pdf · uploaded 1 Jul 2024Source
- 3 a Details of encumbrances concerned to FinanceSelf - Declaration Regarding Encumbrance.pdf · uploaded 8 Aug 2024Source
- 3 b Details of encumbrances concerned to LegalSelf - Declaration Regarding Encumbrance.pdf · uploaded 8 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ MARCH 24.pdf · uploaded 7 Apr 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ JUNE 24.pdf · uploaded 7 Apr 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ SEP 24.pdf · uploaded 7 Apr 2025Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ DEC 24.pdf · uploaded 7 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ MARCH 24_compressed.pdf · uploaded 7 Apr 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ JUNE 24_compressed.pdf · uploaded 7 Apr 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ SEP 24_compressed.pdf · uploaded 7 Apr 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_ DEC 24_compressed.pdf · uploaded 7 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ MARCH 24.pdf · uploaded 7 Apr 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ JUNE 24.pdf · uploaded 7 Apr 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ SEP 24.pdf · uploaded 7 Apr 2025Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_ DEC 24.pdf · uploaded 7 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD_ MARCH 24.pdf · uploaded 7 Apr 2025Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD_ JUNE 24.pdf · uploaded 7 Apr 2025Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD_ SEP 24.pdf · uploaded 7 Apr 2025Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD _DEC 24.pdf · uploaded 7 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 23-24.pdf · uploaded 11 Apr 2025Source
- 1 Proforma of Agreement for saleFinal RERA-Agreement-Hari Om-Nerul New 5-4-25.pdf · uploaded 10 May 2025Source
- Form 1FORM 1_ MARCH 25.pdf · uploaded 11 Jul 2025Source
- Form 2FORM 2_ MARCH 25.pdf · uploaded 11 Jul 2025Source
- Form 3FORM 3_ MARCH 25_ ANIRUDDHA ICON_compressed.pdf · uploaded 11 Jul 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD_ MARCH 25.pdf · uploaded 11 Jul 2025Source
- Withdrawal Update Form 1FORM 1_ MARCH 25.pdf · uploaded 11 Jul 2025Source
- Withdrawal Update Form 2FORM 2_ MARCH 25.pdf · uploaded 11 Jul 2025Source
- Withdrawal Update Form 3FORM 3_ MARCH 25_ ANIRUDDHA ICON_compressed.pdf · uploaded 11 Jul 2025Source
- Withdrawal Update Form 1FORM 1_ JUNE 25_ ANIRUDDHA ICON.pdf · uploaded 23 Jul 2025Source
- Withdrawal Update Form 2FORM 2_ JUNE 25_ ANIRUDDHA ICON.pdf · uploaded 23 Jul 2025Source
- Withdrawal Update Form 3FORM 3_ JUNE 25_ ANIRUDDHA ICON.pdf · uploaded 23 Jul 2025Source
- Form 2A (FY 2024-2025)FORM 2A_2024-25.pdf · uploaded 19 Jan 2026Source
- Withdrawal Update Form 1FORM 1_ SEP 25_ ANIRUDDHA ICON (1).pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 1FORM 1_DEC 25_ANIRUDDHA ICON.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 2FORM 2_ SEP 25_ ANIRUDDHA ICON (1).pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 2FORM 2_DEC 25_ANIRUDDHA ICON.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 3FORM 3_ SEP 25_ ANIRUDDHA ICON (1).pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 3FORM 3_ DEC 25_ ANIRUDDHA ICON.pdf · uploaded 4 Mar 2026Source
- Withdrawal Update Form 1FORM 1_ MARCH 26_ ANIRUDDHA ICON.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 2FORM 2_ MARCH 26_ ANIRUDDHA ICON.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 3FORM 3_ MARCH 26_ ANIRUDDHA ICON.pdf · uploaded 30 Apr 2026Source
- Withdrawal Update Form 1FORM 1_ JUNE 26_ ANIRUDDHA ICON.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 2FORM 2_ JUNE 26_ ANIRUDDHA ICON.pdf · uploaded 21 Jul 2026Source
- Withdrawal Update Form 3FORM 3_ JUNE 26_ ANNIRUDDHA ICON.pdf · uploaded 21 Jul 2026Source
Technical
- DocumentLayOut Plan.pdf · uploaded 21 Apr 2023Source
- Documentscan1.pdf · uploaded 22 Apr 2023Source
- Documentscan2.pdf · uploaded 22 Apr 2023Source
- Documentscan3.pdf · uploaded 22 Apr 2023Source
- Documentscan4.pdf · uploaded 22 Apr 2023Source
- Documentscan5.pdf · uploaded 22 Apr 2023Source
- Documentscan6.pdf · uploaded 22 Apr 2023Source
- Documentscan7.pdf · uploaded 22 Apr 2023Source
- Documentscan8.pdf · uploaded 22 Apr 2023Source
- Document1 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 24 Apr 2023Source
- Other – TechnicalCredai Certificate.pdf · uploaded 24 Apr 2023Source
- Document1_compressed.pdf · uploaded 27 Mar 2024Source
- Document2_compressed.pdf · uploaded 27 Mar 2024Source
- Document3_compressed.pdf · uploaded 27 Mar 2024Source
- Document4_compressed.pdf · uploaded 27 Mar 2024Source
- Document5_compressed.pdf · uploaded 27 Mar 2024Source
- Document6_compressed.pdf · uploaded 27 Mar 2024Source
- Document7_compressed.pdf · uploaded 27 Mar 2024Source
- Document8_compressed.pdf · uploaded 27 Mar 2024Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Navi Mumbai (M Corp.), Thane taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Plot No 23
- South
- Plot No 25
- East
- 15 Mtr Existing Road
- West
- Railway Corridor
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Dimensions Architects Pvt Ltd | — |
| Chartered accountant | B R Sawant & Co | — |
| Chartered accountant | Ca Sushant Alme | — |
| Chartered accountant | Nirav M Haria And Co | — |
| Engineer | Agharkar Consultants | — |
| Engineer | Bipin Maurya | — |
| Other | Rajendra D Tambe | — |
| Other | Shree Kodiyar Constructions | — |
Source: MahaRERA project page. Contact details are not shown.