Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 5
- Unit types
- 1BHK, 2BHK, 1RK122 units in all
- Address
- New Survey No 287/2, Murbad, MurbadPIN 421401
- Designated bank account
- 229
- Developed in phases
- Yes
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 31 Dec 2026
- Registered
- 22 Nov 2021
- Promised
- 31 Dec 2026
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700031861 | 22 Nov 2021 | 31 Dec 2026 | 31 Dec 2026 | Techcons Constructional Engineering Co | Project page |
5 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Techcons Basera- A Wing | 9 | 44 |
| Techcons Basera- B Wing | 9 | 35 |
| Techcons Basera- C Wing | 9 | 43 |
| Techcons Basera- D Wing | 7 | — |
| Techcons Basera- E Wing | 8 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
88 of 122 units booked (72%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Techcons Basera- A Wing | 1BHK | 38.61 sq m · 416 sq ft | 30 | 26 |
| Techcons Basera- A Wing | 2BHK | 50.54 sq m · 544 sq ft | 14 | 14 |
| Techcons Basera- B Wing | 1BHK | 38.61 sq m · 416 sq ft | 35 | 24 |
| Techcons Basera- C Wing | 1BHK | 38.61 sq m · 416 sq ft | 36 | 20 |
| Techcons Basera- C Wing | 1RK | 27.48 sq m · 296 sq ft | 7 | 4 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 170 filings listed on MahaRERA's project page
Finance
- PAN CardFirm PAN.pdf · uploaded 30 Oct 2021Source
Legal
Migrated
- 1 PAN CardFirm PAN.pdf · uploaded 30 Oct 2021Source
- 1 Copy of the legal title reportTITLE REPORT.pdf · uploaded 30 Oct 2021Source
- 1 Details of encumbrancesEncumbrances certificate.pdf · uploaded 30 Oct 2021Source
- 1 Copy of Layout Approval (in case of layout)Approved plans copy-1.pdf · uploaded 30 Oct 2021Source
Show all 171 documentsShow fewer documents
Migrated
- 2 Copy of Layout Approval (in case of layout)Approved plans copy-2.pdf · uploaded 30 Oct 2021Source
- 3 Copy of Layout Approval (in case of layout)Approved plans copy-3.pdf · uploaded 30 Oct 2021Source
- 4 Copy of Layout Approval (in case of layout)Approved plans copy-4.pdf · uploaded 30 Oct 2021Source
- 5 Copy of Layout Approval (in case of layout)Approved plans copy-5.pdf · uploaded 30 Oct 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentIOD.pdf · uploaded 30 Oct 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement certificate.pdf · uploaded 30 Oct 2021Source
- 1 Declaration about Commencement CertificateDeceleration about CC.pdf · uploaded 30 Oct 2021Source
- 1 Declaration in FORM BForm B Affidavit.pdf · uploaded 30 Oct 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 ENGINEEER CERTIFICATE.pdf · uploaded 30 Oct 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA Certificate.pdf · uploaded 30 Oct 2021Source
- 1 Proforma of Allotment letterAGREEMENT TO SALE.pdf · uploaded 30 Oct 2021Source
- 2 Proforma of Allotment letterLETTER OF ALLOTMENT.pdf · uploaded 30 Oct 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 ARCHITECT CERTIFICATE.pdf · uploaded 9 Nov 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect_Certificate__1_.pdf · uploaded 15 Nov 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Techcons_Constructional_Engineer_Certificate.pdf · uploaded 15 Nov 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 MARCH 22.pdf · uploaded 15 Nov 2022Source
- 6 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 6 Dec 2022Source
- 7 Copy of Layout Approval (in case of layout)Plan 2.pdf · uploaded 6 Dec 2022Source
- 8 Copy of Layout Approval (in case of layout)Plan 3.pdf · uploaded 6 Dec 2022Source
- 9 Copy of Layout Approval (in case of layout)Plan 4.pdf · uploaded 6 Dec 2022Source
- 10 Copy of Layout Approval (in case of layout)Plan 5.pdf · uploaded 6 Dec 2022Source
- 11 Copy of Layout Approval (in case of layout)Plan 6.pdf · uploaded 6 Dec 2022Source
- 12 Copy of Layout Approval (in case of layout)Plan 7.pdf · uploaded 6 Dec 2022Source
- 13 Copy of Layout Approval (in case of layout)Plan 8.pdf · uploaded 6 Dec 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentCC.pdf · uploaded 6 Dec 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 6 Dec 2022Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Sold Inventor- Sep 2022.pdf · uploaded 13 Dec 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects_certificate_compressed.pdf · uploaded 23 Dec 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers_certificate_compressed.pdf · uploaded 23 Dec 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects_certificate_compressed.pdf · uploaded 24 Feb 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)engineers_certificate_compressed.pdf · uploaded 24 Feb 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Dec 22_compressed.pdf · uploaded 24 Feb 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 signed copy_compressed.pdf · uploaded 1 Sep 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 22-23_compressed.pdf · uploaded 30 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Techcons - 2021-22.pdf · uploaded 30 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Techcons - 2022-23.pdf · uploaded 30 Sep 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)From -1 Techcons Basera Sep 23_compressed.pdf · uploaded 3 Nov 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)From - 3 Techocons Basera Sep 2023_compressed.pdf · uploaded 3 Nov 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_Engg_Cert_compressed.pdf · uploaded 4 Nov 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 December 23.pdf · uploaded 16 Feb 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 December 23.pdf · uploaded 16 Feb 2024Source
- 2 Disclosure of sold/ booked inventoryDiscolsure_of_sold__book_inventory_compressed__1_.pdf · uploaded 16 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed form 3 Promoters Acceptance_compressed.pdf · uploaded 16 Feb 2024Source
- 3 Disclosure of sold/ booked inventoryDisclosure of Inventory.pdf · uploaded 16 May 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signned form 3 - Techcons - March 2024.pdf · uploaded 16 May 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 May 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - March 2024.pdf · uploaded 24 May 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 31 May 2024Source
- 14 Copy of Layout Approval (in case of layout)MYSCAN 1.pdf · uploaded 12 Jun 2024Source
- 15 Copy of Layout Approval (in case of layout)MYSCAN 2.pdf · uploaded 12 Jun 2024Source
- 16 Copy of Layout Approval (in case of layout)MYSCAN 3.pdf · uploaded 12 Jun 2024Source
- 17 Copy of Layout Approval (in case of layout)MYSCAN 4.pdf · uploaded 12 Jun 2024Source
- 18 Copy of Layout Approval (in case of layout)MYSCAN 5.pdf · uploaded 12 Jun 2024Source
- 19 Copy of Layout Approval (in case of layout)MYSCAN 6.pdf · uploaded 12 Jun 2024Source
- 20 Copy of Layout Approval (in case of layout)MYSCAN 7.pdf · uploaded 12 Jun 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentMYSCAN 1.pdf · uploaded 12 Jun 2024Source
- 4 Building Plan Approval / NA Order for plotted developmentMYSCAN 2.pdf · uploaded 12 Jun 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentMYSCAN 3.pdf · uploaded 12 Jun 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentMYSCAN 4.pdf · uploaded 12 Jun 2024Source
- 7 Building Plan Approval / NA Order for plotted developmentMYSCAN 5.pdf · uploaded 12 Jun 2024Source
- 8 Building Plan Approval / NA Order for plotted developmentMYSCAN 6.pdf · uploaded 12 Jun 2024Source
- 9 Building Plan Approval / NA Order for plotted developmentMYSCAN 7.pdf · uploaded 12 Jun 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 6 Aug 2024Source
- 2 Declaration about Commencement CertificateDeclaration_Rera_compressed.pdf · uploaded 6 Aug 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentMurbad E wing Plan_compressed.pdf · uploaded 25 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3 - Techcons - June 24.pdf · uploaded 5 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Techcons.pdf · uploaded 5 Nov 2024Source
- 2 Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 5 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3.pdf · uploaded 8 Nov 2024Source
- 3 Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 8 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert Sept 24.pdf · uploaded 13 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch Cert.pdf · uploaded 27 Nov 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FOrm 2A 21-22.pdf · uploaded 18 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate.pdf · uploaded 19 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 - Mar 24.pdf · uploaded 22 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3 - Dec 24 Techcons.pdf · uploaded 3 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure.pdf · uploaded 3 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)HPSC1816_compressed.pdf · uploaded 5 Feb 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentHPSC1814.pdf · uploaded 5 Feb 2025Source
- 2 Building Plan Approval / NA Order for plotted developmentHPSC1815.pdf · uploaded 5 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 13 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 24 Feb 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of Inventory - March 25_compressed.pdf · uploaded 25 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Form 3_compressed.pdf · uploaded 30 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 16 Jun 2025Source
- 1 Copy of Layout Approval (in case of layout)Plan_160723.pdf · uploaded 16 Jul 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 25.pdf · uploaded 28 Jul 2025Source
- 1 Disclosure of sold/ booked inventoryDisclosure of sold booked_compressed.pdf · uploaded 28 Jul 2025Source
- Form 1Form 1 - june 25.pdf · uploaded 13 Nov 2025Source
- Form 1Form 1 - Sept 25 - Techcons.pdf · uploaded 13 Nov 2025Source
- Form 1Form 1.pdf · uploaded 13 Nov 2025Source
- Form 2Form 2 - June 25.pdf · uploaded 13 Nov 2025Source
- Form 2Form 2 - Sept 25 - Techcons_compressed.pdf · uploaded 13 Nov 2025Source
- Form 2Form 2 - March 25.pdf · uploaded 13 Nov 2025Source
- Form 3Form 3 - June 25.pdf · uploaded 13 Nov 2025Source
- Form 3Form 3 - Sept 25 - Techcons.pdf · uploaded 13 Nov 2025Source
- Form 3RERA Form 3_compressed.pdf · uploaded 13 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of sold booked_compressed.pdf · uploaded 13 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure - Sept 25 - Techcons_compressed.pdf · uploaded 13 Nov 2025Source
- Disclosure of Sold and Booked InventoryDisclosure of Inventory - March 25_compressed.pdf · uploaded 13 Nov 2025Source
- Form 5 (FY 2024-2025)Form 5 - Techcons - 24-25_compressed.pdf · uploaded 11 Dec 2025Source
- Form 2A (FY 2021-2022)FOrm 2A 21-22.pdf · uploaded 15 Dec 2025Source
- Form 2A (FY 2022-2023)Form 2A 22-23.pdf · uploaded 15 Dec 2025Source
- Form 2A (FY 2023-2024)Form 2A - March 24.pdf · uploaded 15 Dec 2025Source
- Form 2A (FY 2024-2025)Form 2A - March 25_organized.pdf · uploaded 15 Dec 2025Source
- Form 5 (FY 2021-2022)Signed Form 5.pdf · uploaded 15 Dec 2025Source
- Form 5 (FY 2022-2023)Signed form 5.pdf · uploaded 15 Dec 2025Source
- Form 5 (FY 2023-2024)Form 5 - Mar 24.pdf · uploaded 15 Dec 2025Source
- Withdrawal Update Form 1Form 1 - Techcons - Dec 25.pdf · uploaded 6 Feb 2026Source
- Withdrawal Update Form 2Form 2 - Techcons - Dec 25.pdf · uploaded 6 Feb 2026Source
- Withdrawal Update Form 3Form 3 - Techcons - Dec 25_compressed.pdf · uploaded 6 Feb 2026Source
- Withdrawal Update Form 1Form 1 - Techcons - March 26.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 2Form 2 - Techcons - March 26.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 3Form 3 - Techcons - March 26.pdf · uploaded 28 Apr 2026Source
- Withdrawal Update Form 1Form 1 - Techcons Basera - June 2026.pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 2Form 2 - Techcons Basera - June 2026 (1).pdf · uploaded 24 Aug 2026Source
- Withdrawal Update Form 3Form 3 - Techcons Basera - June 2026.pdf · uploaded 24 Aug 2026Source
Technical
- DocumentApproved plans copy-1.pdf · uploaded 30 Oct 2021Source
- DocumentApproved plans copy-2.pdf · uploaded 30 Oct 2021Source
- DocumentApproved plans copy-3.pdf · uploaded 30 Oct 2021Source
- DocumentApproved plans copy-4.pdf · uploaded 30 Oct 2021Source
- DocumentApproved plans copy-5.pdf · uploaded 30 Oct 2021Source
- DocumentIOD.pdf · uploaded 30 Oct 2021Source
- DocumentPlan 1.pdf · uploaded 6 Dec 2022Source
- DocumentPlan 2.pdf · uploaded 6 Dec 2022Source
- DocumentPlan 4.pdf · uploaded 6 Dec 2022Source
- DocumentPlan 5.pdf · uploaded 6 Dec 2022Source
- DocumentPlan 6.pdf · uploaded 6 Dec 2022Source
- DocumentPlan 7.pdf · uploaded 6 Dec 2022Source
- DocumentPlan 8.pdf · uploaded 6 Dec 2022Source
- DocumentPlan 3.pdf · uploaded 6 Dec 2022Source
- DocumentCC.pdf · uploaded 6 Dec 2022Source
- DocumentMYSCAN 1.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 2.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 3.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 4.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 5.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 6.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 7.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 1.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 2.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 3.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 4.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 5.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 6.pdf · uploaded 12 Jun 2024Source
- DocumentMYSCAN 7.pdf · uploaded 12 Jun 2024Source
- DocumentHPSC1816_compressed.pdf · uploaded 5 Feb 2025Source
- DocumentHPSC1814.pdf · uploaded 5 Feb 2025Source
- DocumentHPSC1815.pdf · uploaded 5 Feb 2025Source
- DocumentPlan_160723.pdf · uploaded 16 Jul 2025Source
- OthersWing B OC Plan.pdf · uploaded 12 Jan 2026Source
- OthersWing B OC.pdf · uploaded 12 Jan 2026Source
- OthersA_wing_OC_Copy.pdf · uploaded 12 Jan 2026Source
- OthersA Wing Oc Plan_compressed.pdf · uploaded 17 Jan 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Murbad, Murbad taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Land Survey No 287-3 Pt belonging to Babu Thakray
- South
- Land Survey No 287-2 Vaishay Samajh Hall
- East
- Land Survey No 287-2 Pt
- West
- Land Survey No287-1
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | M Square Architects | — |
| Chartered accountant | Shah Shah and Shah Chartered Accountants | — |
| Engineer | Atul Kudtarkar and Associates | — |
| Engineer | Mohit Kakamari | — |
Source: MahaRERA project page. Contact details are not shown.