Jamunabai Tower
Certificate SignedKatemanevali, Thane 421306 |Promoter: Nageshwar Construction
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Address
- 43PIN 421306
- Designated bank account
- 108
- Developed in phases
- Yes
Location
Coordinates as published by MahaRERA
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion promised for 30 Dec 2025
The latest completion date on record passed 10 months ago.
- Registered
- 5 Oct 2017
- Promised
- 30 Dec 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700013418 | 5 Oct 2017 | 30 Dec 2025 | 30 Dec 2025 | Nageshwar Construction | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building I | 9 | — |
| Building II | 8 | — |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Documents
1 document held by Deedo, 160 filings listed on MahaRERA's project page
Legal
Migrated
- 1 Copy of the legal title reportTitle Certificate compressed.pdf · uploaded 25 Sep 2017Source
- 1 Details of encumbrancesNo Encumberance Letter compressed.pdf · uploaded 25 Sep 2017Source
- 1 Copy of Layout Approval (in case of layout)building plan compressed.pdf · uploaded 25 Sep 2017Source
- 1 Building Plan Approval (IOD)Commencement certificate compressed.pdf · uploaded 25 Sep 2017Source
Show all 161 documentsShow fewer documents
Migrated
- 1 Declaration in FORM BAffidavit compressed.pdf · uploaded 25 Sep 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect's Certificate compressed.pdf · uploaded 25 Sep 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM - 2 wing I compressed.pdf · uploaded 25 Sep 2017Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM - 2 Wing II compressed.pdf · uploaded 25 Sep 2017Source
- 1 Certificates of CA (Form 3)Form 3 compressed.pdf · uploaded 25 Sep 2017Source
- 1 Proforma of Allotment letterLetter of Allotment compressed.pdf · uploaded 25 Sep 2017Source
- 2 Proforma of Allotment letterAgreement-for-sale-of-flat--compressed-1-7.pdf · uploaded 25 Sep 2017Source
- 3 Proforma of Allotment letterAgreement-for-sale-of-flat--compressed-8-14.pdf · uploaded 25 Sep 2017Source
- 4 Proforma of Allotment letterAgreement-for-sale-of-flat--compressed-15-20.pdf · uploaded 25 Sep 2017Source
- 2 Copy of Layout Approval (in case of layout)1 sc.pdf · uploaded 28 Feb 2018Source
- 3 Copy of Layout Approval (in case of layout)2 sc.pdf · uploaded 28 Feb 2018Source
- 4 Copy of Layout Approval (in case of layout)3 sc.pdf · uploaded 28 Feb 2018Source
- 5 Copy of Layout Approval (in case of layout)4 sc.pdf · uploaded 28 Feb 2018Source
- 2 Declaration in FORM BForm B-compressed.pdf · uploaded 28 Feb 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement certificate compressed.pdf · uploaded 12 Oct 2018Source
- 1 Certificates of CA (Form 5)FORM 5-compressed.pdf · uploaded 12 Oct 2018Source
- 6 Copy of Layout Approval (in case of layout)Layout Plan 1_compressed.pdf · uploaded 15 Apr 2019Source
- 7 Copy of Layout Approval (in case of layout)Layout Plan 2_compressed.pdf · uploaded 15 Apr 2019Source
- 2 Commencement Certificates / NA Order for plotted development1111.pdf · uploaded 15 Apr 2019Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT S CERTIFICATE-min.pdf · uploaded 15 Apr 2019Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEERS CERTIFICATE-min_compressed.pdf · uploaded 15 Apr 2019Source
- 2 Certificates of CA (Form 3)FORM 3 NAGESHWAR CONSTRUCTION_compressed.pdf · uploaded 15 Apr 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Nageshwar Form 5.pdf · uploaded 15 Dec 2019Source
- 3 Certificates of CA (Form 3)Adobe Scan Sep 15, 2021.pdf · uploaded 15 Sep 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 19-20.pdf · uploaded 20 Sep 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentRevised Commencement Certificate 06042021.pdf · uploaded 15 Jun 2022Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 19-20 -22092020.pdf · uploaded 15 Jun 2022Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 As on 31-03-2021.pdf · uploaded 15 Jun 2022Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 19-20 25092020.pdf · uploaded 15 Jun 2022Source
- 8 Copy of Layout Approval (in case of layout)scan4138 Building Plan.pdf · uploaded 11 Feb 2023Source
- 9 Copy of Layout Approval (in case of layout)scan4139 Layout Plan Plot 2.pdf · uploaded 11 Feb 2023Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 A B wing 06-01-2023.pdf · uploaded 11 Feb 2023Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 C wing 06-01-2023.pdf · uploaded 11 Feb 2023Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)Society formation certificate-compressed.pdf · uploaded 11 Feb 2023Source
- 2 a Details of encumbrances concerned to FinanceEncumbrance ok.pdf · uploaded 22 Feb 2025Source
- 1 a Details of encumbrances concerned to FinanceNon Encumbrance legal ok.pdf · uploaded 22 Feb 2025Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architech 30-09-2021.pdf · uploaded 22 Feb 2025Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form Architects 15-12-2021.pdf · uploaded 22 Feb 2025Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Arcitech 31-03-2021.pdf · uploaded 22 Feb 2025Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Architech 31-03-2023.pdf · uploaded 22 Feb 2025Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architech 30-06-2021.pdf · uploaded 22 Feb 2025Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Annexure 31-12-2022.pdf · uploaded 22 Feb 2025Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Architech 31-03-2022.pdf · uploaded 22 Feb 2025Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Architech 30-12-2023.pdf · uploaded 22 Feb 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Architech 30-09-2023.pdf · uploaded 22 Feb 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Architech 30-09-2022.pdf · uploaded 22 Feb 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Architech 30-06-2023.pdf · uploaded 22 Feb 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Annexure A Architech 30-06-2022.pdf · uploaded 22 Feb 2025Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 31-03-2022.pdf · uploaded 22 Feb 2025Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 15-12-2021.pdf · uploaded 22 Feb 2025Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 Engeenrs 06-01-2023.pdf · uploaded 22 Feb 2025Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form 2 Engeenrs 06-01-2023.pdf · uploaded 22 Feb 2025Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form Engeener31-03-2021.pdf · uploaded 22 Feb 2025Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form Engeener31-03-2021.pdf · uploaded 22 Feb 2025Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2 Engeenr (2) 31-03-2023.pdf · uploaded 22 Feb 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2 Engeenr (2) 31-03-2023.pdf · uploaded 22 Feb 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2 Engeenr 06-01-2023.pdf · uploaded 22 Feb 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2 Engineer 30-09-2022.pdf · uploaded 22 Feb 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)From 2 Engeers 25 9 20 ok.pdf · uploaded 22 Feb 2025Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)form2 15-12-21.pdf · uploaded 22 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)From 2 Engeers 25 9 20.pdf · uploaded 22 Feb 2025Source
- 1 Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 22 Feb 2025Source
- 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 22 Feb 2025Source
- 1 CERSAI detailsundertaking cersai.pdf · uploaded 22 Feb 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A.pdf · uploaded 22 Feb 2025Source
- 1 b Details of encumbrances concerned to LegalNon Encumbrance legal ok.pdf · uploaded 22 Feb 2025Source
- 2 b Details of encumbrances concerned to LegalEncumbrance ok.pdf · uploaded 22 Feb 2025Source
- 1 Other – TechnicalForm 4 Architech Signed (1) ok.pdf · uploaded 22 Feb 2025Source
- 1 Deviation Report with respect to model copy of AgreementNo Deviation ok.pdf · uploaded 22 Feb 2025Source
- 1 Proforma of Agreement for saleproforma agreeok.pdf · uploaded 22 Feb 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure (2).pdf · uploaded 22 Feb 2025Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A (2).pdf · uploaded 22 Feb 2025Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A (3).pdf · uploaded 22 Feb 2025Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 22 Feb 2025Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsAnnexure.pdf · uploaded 22 Feb 2025Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsAnnex a 2 ok.pdf · uploaded 22 Feb 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format b ok.pdf · uploaded 22 Feb 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A 19-20 Q2.pdf · uploaded 4 Mar 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A 19-20 Q3.pdf · uploaded 4 Mar 2025Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A 19-20 Q4.pdf · uploaded 4 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)2A 19-20 Q1.pdf · uploaded 4 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A 20-21 Q1.pdf · uploaded 4 Mar 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A 20-21 Q2.pdf · uploaded 4 Mar 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A 20-21 Q3.pdf · uploaded 4 Mar 2025Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2A 20-21 Q4.pdf · uploaded 4 Mar 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A 21-22 Q2.pdf · uploaded 4 Mar 2025Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A 21-22 Q4.pdf · uploaded 4 Mar 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A 21-22 Q3.pdf · uploaded 4 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)2A 21-22 Q1.pdf · uploaded 4 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A 22-23 Q1.pdf · uploaded 4 Mar 2025Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A 22-23 Q2.pdf · uploaded 4 Mar 2025Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A 22-23 Q3.pdf · uploaded 4 Mar 2025Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)2A 22-23 Q4.pdf · uploaded 4 Mar 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A 23-24 Q1.pdf · uploaded 4 Mar 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Format B Revised.pdf · uploaded 4 Mar 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectEncumbrance ok.pdf · uploaded 4 Mar 2025Source
- 1 Certificates of CA (Form 3)Form 3 20-21 Q1.pdf · uploaded 12 Apr 2025Source
- 2 Certificates of CA (Form 3)Form 3 20-21 Q2.pdf · uploaded 12 Apr 2025Source
- 3 Certificates of CA (Form 3)Form 3 20-21 Q3.pdf · uploaded 12 Apr 2025Source
- 4 Certificates of CA (Form 3)Form 3 20-21 Q4.pdf · uploaded 12 Apr 2025Source
- 5 Certificates of CA (Form 3)Form 3 21-22 Q1.pdf · uploaded 12 Apr 2025Source
- 6 Certificates of CA (Form 3)Form 3 21-22 Q2.pdf · uploaded 12 Apr 2025Source
- 7 Certificates of CA (Form 3)Form 3 21-22 Q3.pdf · uploaded 12 Apr 2025Source
- 8 Certificates of CA (Form 3)Form 3 21-22 Q4.pdf · uploaded 12 Apr 2025Source
- 9 Certificates of CA (Form 3)Form 3 22-23 Q1.pdf · uploaded 12 Apr 2025Source
- 10 Certificates of CA (Form 3)Form 3 22-23 Q2.pdf · uploaded 12 Apr 2025Source
- 11 Certificates of CA (Form 3)Form 3 22-23 Q3.pdf · uploaded 12 Apr 2025Source
- 12 Certificates of CA (Form 3)Form 3 22-23 Q4.pdf · uploaded 12 Apr 2025Source
- Form 1Form 1 23-24 Q1.pdf · uploaded 12 Jun 2025Source
- Form 2Form 2 23-24 30-09-2023.pdf · uploaded 12 Jun 2025Source
- Form 3Form 3 23-24 Q1.pdf · uploaded 12 Jun 2025Source
- Disclosure of Sold and Booked Inventorysold unsold.pdf · uploaded 12 Jun 2025Source
- Form 5 (FY 2020-2021)20-21.pdf · uploaded 12 Jun 2025Source
- Form 5 (FY 2021-2022)21-22.pdf · uploaded 13 Jun 2025Source
- Form 5 (FY 2022-2023)22-23.pdf · uploaded 13 Jun 2025Source
- Form 5 (FY 2023-2024)23-24.pdf · uploaded 13 Jun 2025Source
Technical
- Documentbuilding plan compressed.pdf · uploaded 25 Sep 2017Source
- DocumentCommencement certificate compressed.pdf · uploaded 25 Sep 2017Source
- Document1 sc.pdf · uploaded 28 Feb 2018Source
- Document2 sc.pdf · uploaded 28 Feb 2018Source
- Document3 sc.pdf · uploaded 28 Feb 2018Source
- Document4 sc.pdf · uploaded 28 Feb 2018Source
- DocumentLayout Plan 1_compressed.pdf · uploaded 15 Apr 2019Source
- DocumentLayout Plan 2_compressed.pdf · uploaded 15 Apr 2019Source
- Documentscan4138 Building Plan.pdf · uploaded 11 Feb 2023Source
- Documentscan4139 Layout Plan Plot 2.pdf · uploaded 11 Feb 2023Source
- Other – TechnicalForm 4 Architech Signed (1) ok.pdf · uploaded 22 Feb 2025Source
Technical (Architect)
- DocumentForm 1 As on 31-03-2021.pdf · uploaded 15 Jun 2022Source
- DocumentAnnexure A Architech 30-06-2022.pdf · uploaded 22 Feb 2025Source
- DocumentAnnexure A Architech 30-06-2023.pdf · uploaded 22 Feb 2025Source
- DocumentAnnexure A Architech 30-09-2022.pdf · uploaded 22 Feb 2025Source
- DocumentAnnexure A Architech 30-09-2023.pdf · uploaded 22 Feb 2025Source
- DocumentAnnexure A Architech 30-12-2023.pdf · uploaded 22 Feb 2025Source
- DocumentAnnexure A Architech 31-03-2022.pdf · uploaded 22 Feb 2025Source
- DocumentForm 1 Annexure 31-12-2022.pdf · uploaded 22 Feb 2025Source
- DocumentForm 1 Architech 30-06-2021.pdf · uploaded 22 Feb 2025Source
- DocumentForm 1 Architech 30-09-2021.pdf · uploaded 22 Feb 2025Source
- DocumentAnnexure A Architech 31-03-2023.pdf · uploaded 22 Feb 2025Source
- DocumentForm 1 Arcitech 31-03-2021.pdf · uploaded 22 Feb 2025Source
- DocumentForm Architects 15-12-2021.pdf · uploaded 22 Feb 2025Source
Technical (Engineer)
- DocumentForm 2 C wing 06-01-2023.pdf · uploaded 11 Feb 2023Source
- DocumentFrom 2 Engeers 25 9 20 ok.pdf · uploaded 22 Feb 2025Source
- Documentform2 Engineer 30-09-2022.pdf · uploaded 22 Feb 2025Source
- Documentform2 Engeenr 06-01-2023.pdf · uploaded 22 Feb 2025Source
- Documentform2 Engeenr (2) 31-03-2023.pdf · uploaded 22 Feb 2025Source
- Documentform2 Engeenr (2) 31-03-2023.pdf · uploaded 22 Feb 2025Source
- Documentform2 15-12-21.pdf · uploaded 22 Feb 2025Source
- DocumentForm Engeener31-03-2021.pdf · uploaded 22 Feb 2025Source
- DocumentForm Engeener31-03-2021.pdf · uploaded 22 Feb 2025Source
- DocumentForm 2 31-03-2022.pdf · uploaded 22 Feb 2025Source
- Documentform 2 Engeenrs 06-01-2023.pdf · uploaded 22 Feb 2025Source
- Documentform 2 Engeenrs 06-01-2023.pdf · uploaded 22 Feb 2025Source
- DocumentForm 2 15-12-2021.pdf · uploaded 22 Feb 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Katemanevali, Kalyan taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Survey No 43
- South
- Survey No 42
- East
- Dp Road
- West
- Survey No 58a
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | De Con Consultants | — |
| Chartered accountant | Jhs And Associates LLP | — |
| Engineer | Dipti Khedekar & Associates | — |
| Other | Shree Saibaba Construction | — |
Source: MahaRERA project page. Contact details are not shown.