Skip to content

Diwadkar Lotus

Completed

Kalyan, Thane 421301 |Promoter: Honest Infra

Residential / Group HousingRERAP51700009060
19 Aug 2017Registered with MahaRERA
31 Dec 2019Promised completion
30 Dec 2021Revised completionPushed back 2 years
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
1
Land area for this project
1,696 sq m (18,250 sq ft)
Permissible built-up area
5,031 sq m (54,156 sq ft)
Sanctioned built-up area
3,475 sq m (37,401 sq ft)
Recreational open space
455 sq m (4,894 sq ft)
Address
2878 APIN 421301
Designated bank account
Canara Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.25271, 73.12906
Diwadkar Lotus is at latitude 19.25271, longitude 73.12906.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 2 years

The latest completion date on record passed 4 years and 10 months ago.

Registered
19 Aug 2017
Promised
31 Dec 2019
Revised
30 Dec 2021

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170000906019 Aug 201731 Dec 201930 Dec 2021Honest InfraProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Diwadkar Lotus22—

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000067
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Diwadkar Lotus

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsTremix Work Completed100%
  • Water SupplyWork is Completed100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Work is Completed100%
  • Storm Water DrainsWork is Completed100%
  • Landscaping & Tree PlantingWork is Completed100%
  • Street LightingWork is Completed100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingWork is Completed100%
  • Energy managemcntSolar Water Heater Completed100%
  • Fire protection and fire safety requirementsWork is Completed100%
  • Electrical meter room, sub-station, receiving stationWork is Completed100%
  • Aggregate area of recreational Open Space--100%
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

30 documents held by Deedo, 31 filings listed on MahaRERA's project page

Title report

Encumbrance details

Commencement certificate

Form B

Form 1 (4)

Show all 61 documentsShow fewer documents

Form 2

Allotment letter (2)

Registration certificate

Form 5

Occupancy / completion certificate

  • Occupancy / completion certificate22 Apr 2021ViewSource

Form 4

Extension certificate

Other (7)

Layout plan (6)

Building plan

Document library

  • Copy of the legal title reportInfra Title Certificate.pdf · uploaded 30 Jul 2017View
  • Details of encumbrancesEncumbrances- self declaration.pdf · uploaded 30 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentInfra Commencement certificate.pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)Infra IOD.pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Architect Certificate Honest Infra.pdf · uploaded 31 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Eng certificate lotus.pdf · uploaded 31 Jul 2017View
  • Declaration in FORM BHonest InfraDiwadkar Lotus Affidavit cum Declaration.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)1 Lotus Layout Plan.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)2 Lotus 1st podium.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)3 Lotus Podium 2nd 3rd level.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)4 Diwadkar Lotus plan.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)5 Lotus floor pan 1.pdf · uploaded 31 Jul 2017View
  • Copy of Layout Approval (in case of layout)6 Lotus Floor Plan 2.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterLotus agreement.pdf · uploaded 31 Jul 2017View
  • Proforma of Allotment letterLotus ALLOTMENT LETTER.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Archtect Certificate Lotus 17102017.pdf · uploaded 30 Oct 2017View
  • Certificates of CA (Form 5)Honest Infra Form 5.pdf · uploaded 15 Oct 2018View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)LOTUS Form 1 Architect Certificate Infra 201219.pdf · uploaded 30 Dec 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 30122020.pdf · uploaded 22 Apr 2021View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4 30122020 Lotus.pdf · uploaded 22 Apr 2021View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentLotus Completion Certificate.pdf · uploaded 22 Apr 2021View

Promoter documents

  • Legal Title reportInfra Title Certificate.pdf · uploaded 30 Jul 2017View
  • Declaration Form BHonest InfraDiwadkar Lotus Affidavit cum Declaration.pdf · uploaded 31 Jul 2017View

Technical documents

  • Building Plan ApprovalInfra IOD.pdfView
  • Layout Approval1 Lotus Layout Plan.pdfView
  • Layout Approval2 Lotus 1st podium.pdfView
  • Layout Approval3 Lotus Podium 2nd 3rd level.pdfView
  • Layout Approval4 Diwadkar Lotus plan.pdfView
  • Layout Approval5 Lotus floor pan 1.pdfView
  • Layout Approval6 Lotus Floor Plan 2.pdfView

Proforma allotment letter

  • Proforma allotment letterLotus ALLOTMENT LETTER.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Kalyan, Kalyan taluka

Survey, CTS, gat or plot numbers

2878 A

As published on MahaRERA's project page

2878 A

Boundaries

North
CTS No 2872 and 2883B
South
CTS No 2882B and 2878B
East
CTS No 2883 A1
West
24 Mts wide road

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShobhana Deshpande—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology