Skip to content

Sohum Heights

Certificate Signed

Dawadi, Thane 421203 |Promoter: M/S Sohum Enterprises

13 Jul 2023Registered with MahaRERA
31 Dec 2026Promised completion
1Building
45Units registered3 booked (7%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, Shop45 units in all
Address
S.no.121. H No.1/2/2/2 Village Dawdi, Dawdi, DawdiPIN 421203
Designated bank account
59
Developed in phases
No

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
13 Jul 2023
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170005191813 Jul 202331 Dec 202631 Dec 2026M/S Sohum EnterprisesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Sohum Heights845

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

3 of 45 units booked (7%), as the promoter reported to MahaRERA

1BHK · 35 units2BHK · 7 unitsShop · 3 units
TypeCarpet areaUnitsBooked
1BHK40.52 sq m · 436 sq ft71
1BHK40.55 sq m · 436 sq ft70
1BHK41 sq m · 441 sq ft70
1BHK41.56 sq m · 447 sq ft70
1BHK42.06 sq m · 453 sq ft72
2BHK54.16 sq m · 583 sq ft70
Shop12.64 sq m · 136 sq ft10
Shop12.65 sq m · 136 sq ft10
Shop15.93 sq m · 171 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 181 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Card4 PAN SOHUM ENTP.pdf · uploaded 6 May 2023Source

Legal

  • Declaration Form B19 Form_B_partners_Sohum_.pdf · uploaded 6 May 2023Source
  • Legal Title reportTitle_Report_Sohum_.pdf · uploaded 3 Jun 2023Source
  • Disclosure of Interestnon disclosure-1.pdf · uploaded 11 Sep 2024Source
  • Disclosure of Interestnon disclosure-2.pdf · uploaded 11 Sep 2024Source
  • Other – LegalCONSENT LETTER.pdf · uploaded 18 Jun 2025Source

Migrated

  • 1 PAN Card4 PAN SOHUM ENTP.pdf · uploaded 6 May 2023Source
Show all 182 documentsShow fewer documents

Migrated

  • 1 a Details of encumbrances concerned to Finance17 Encumbrances Certificate.pdf · uploaded 6 May 2023Source
  • 1 b Details of encumbrances concerned to Legal17 Encumbrances Certificate.pdf · uploaded 6 May 2023Source
  • 1 Copy of Layout Approval (in case of layout)5 Plan Pass Copy.pdf · uploaded 6 May 2023Source
  • 1 Building Plan Approval / NA Order for plotted development5 Plan Pass Copy.pdf · uploaded 6 May 2023Source
  • 1 Commencement Certificates / NA Order for plotted development1 Commencement Certificate_compressed.pdf · uploaded 6 May 2023Source
  • 1 Declaration about Commencement Certificate14 Declration of CC.pdf · uploaded 6 May 2023Source
  • 1 Declaration in FORM B19 Form_B_partners_Sohum_.pdf · uploaded 6 May 2023Source
  • 1 Proforma of Agreement for sale7 Draft Sale Agreement Sohum Heights.pdf · uploaded 6 May 2023Source
  • 1 Proforma of Allotment letter12 Allotment Letter Format.pdf · uploaded 6 May 2023Source
  • 1 Deviation Report with respect to Allotment letter16 Devitaion Report.pdf · uploaded 6 May 2023Source
  • 1 Deviation Report with respect to model copy of AgreementCertificate- Deviation Agreement.pdf · uploaded 10 May 2023Source
  • 1 CERSAI detailsUndertaking CERSAI u.pdf · uploaded 31 May 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclouse of Partners 1.pdf · uploaded 31 May 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDosclouse of Partners.pdf · uploaded 31 May 2023Source
  • 1 Copy of the legal title reportTitle_Report_Sohum_.pdf · uploaded 3 Jun 2023Source
  • 2 a Details of encumbrances concerned to FinanceEncumbernce.pdf · uploaded 3 Jun 2023Source
  • 2 b Details of encumbrances concerned to LegalEncumbernce.pdf · uploaded 3 Jun 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Disclousre page 0001.pdf · uploaded 5 Jun 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Revised_compressed.pdf · uploaded 26 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QA FORM 2A 30092023.pdf · uploaded 6 Aug 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QA FORM 2A 31122023.pdf · uploaded 6 Aug 2024Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QA FORM 2A 31032024.pdf · uploaded 6 Aug 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QA FORM 2A 30062024.pdf · uploaded 6 Aug 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 _Q3_31122023.pdf · uploaded 7 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM1_Q4_31032024.pdf · uploaded 7 Aug 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_Q2_30092023.pdf · uploaded 10 Aug 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1_Q1_30062024.pdf · uploaded 10 Aug 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_Q1_30062024.pdf · uploaded 10 Aug 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_Q2_30092023.pdf · uploaded 10 Aug 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_Q3_31122023.pdf · uploaded 10 Aug 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2_Q4_31032024.pdf · uploaded 10 Aug 2024Source
  • 1 Disclosure of sold/ booked inventorySOLD-UNSOLD 30062024.pdf · uploaded 10 Aug 2024Source
  • 2 Disclosure of sold/ booked inventorySOLD-UNSOLD 30092023.pdf · uploaded 10 Aug 2024Source
  • 3 Disclosure of sold/ booked inventorySOLD-UNSOLD 31032024.pdf · uploaded 10 Aug 2024Source
  • 4 Disclosure of sold/ booked inventorySOLD-UNSOLD 31122023.pdf · uploaded 10 Aug 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectUNSECURED LOAN DECLARATION.pdf · uploaded 10 Aug 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Q1_30062024.pdf · uploaded 10 Aug 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Q2_30092023.pdf · uploaded 10 Aug 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Q3_31122023.pdf · uploaded 10 Aug 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_Q4_31032024.pdf · uploaded 10 Aug 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5_31032024.pdf · uploaded 10 Aug 2024Source
  • Form 1Form 1- Sep 23.pdf · uploaded 3 Oct 2024Source
  • Form 1Form 1- Dec 23.pdf · uploaded 3 Oct 2024Source
  • Form 1Form 1- March 24.pdf · uploaded 3 Oct 2024Source
  • Form 1Form 1- June 24.pdf · uploaded 3 Oct 2024Source
  • Form 2Form 02 - Sep 23.pdf · uploaded 3 Oct 2024Source
  • Form 2Form 02 - Dec 23.pdf · uploaded 3 Oct 2024Source
  • Form 2Form 02 - Mar 24.pdf · uploaded 3 Oct 2024Source
  • Form 2Form 02 - June 24.pdf · uploaded 3 Oct 2024Source
  • Form 3CA Certificate_Sep-23.pdf · uploaded 3 Oct 2024Source
  • Form 3CA Certifiacte_Dec-23.pdf · uploaded 3 Oct 2024Source
  • Form 3CA Certifiacte_Mar-24.pdf · uploaded 3 Oct 2024Source
  • Form 3CA Certificate_Jun-24.pdf · uploaded 3 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Dec 23.pdf · uploaded 8 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- March 24.pdf · uploaded 8 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- June 24.pdf · uploaded 8 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Sep 23.pdf · uploaded 8 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Sep 24.pdf · uploaded 8 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sep 23.pdf · uploaded 8 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Dec 23.pdf · uploaded 8 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Mar 24.pdf · uploaded 8 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - June 24.pdf · uploaded 8 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Sep 24.pdf · uploaded 8 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Dec 23.pdf · uploaded 8 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Sep 23.pdf · uploaded 8 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Mar 24.pdf · uploaded 8 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Jun 24.pdf · uploaded 8 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Sep 24.pdf · uploaded 8 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- March 24.pdf · uploaded 8 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- June 24.pdf · uploaded 8 Oct 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Sep 23.pdf · uploaded 8 Oct 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Sep 24.pdf · uploaded 8 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Dec 23.pdf · uploaded 8 Oct 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Jun 24.pdf · uploaded 8 Oct 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Sep 24.pdf · uploaded 8 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Mar 24.pdf · uploaded 8 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Sep 23.pdf · uploaded 8 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Dec 23.pdf · uploaded 8 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sep 23.pdf · uploaded 8 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Dec 23.pdf · uploaded 8 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Mar 24.pdf · uploaded 8 Oct 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - June 24.pdf · uploaded 8 Oct 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Sep 24.pdf · uploaded 8 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentRevised CC of Sohum Heights.pdf · uploaded 25 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentPLAN SOHUM REVISED (1).pdf · uploaded 25 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A SOHUM 30092024.pdf · uploaded 13 Apr 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A SOHUM 31122024.pdf · uploaded 13 Apr 2025Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A SOHUM 31032025.pdf · uploaded 13 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SOHUM.pdf · uploaded 12 Jun 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 31-12-2024.pdf · uploaded 14 Jun 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SOHUM MAR 2025.pdf · uploaded 14 Jun 2025Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBANK AC DECLARATION FORMAT A.pdf · uploaded 14 Jun 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 OCT-DEC 2024.pdf · uploaded 17 Jun 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 JAN- MAR 2025 (1).pdf · uploaded 17 Jun 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 MARCH 2025.pdf · uploaded 17 Jun 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD JUN 23.pdf · uploaded 17 Jun 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD SEPT 23.pdf · uploaded 17 Jun 2025Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD DEC23.pdf · uploaded 17 Jun 2025Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD MAR 24.pdf · uploaded 17 Jun 2025Source
  • 5 Disclosure of sold/ booked inventorySOLD UNSOLD JUN 24.pdf · uploaded 17 Jun 2025Source
  • 6 Disclosure of sold/ booked inventorySOLD UNSOLD SEPT 25.pdf · uploaded 17 Jun 2025Source
  • 7 Disclosure of sold/ booked inventorySOLD UNSOLD DEC 24.pdf · uploaded 17 Jun 2025Source
  • 8 Disclosure of sold/ booked inventorySOLD UNSOLD SEPT 23.pdf · uploaded 17 Jun 2025Source
  • 1 Other – LegalCONSENT LETTER.pdf · uploaded 18 Jun 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)FORM 5 MARCH 2025.pdf · uploaded 18 Jun 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD SEPT 25.pdf · uploaded 28 Jun 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A 31-12-2023.pdf · uploaded 1 Jul 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A 31-03-2024.pdf · uploaded 1 Jul 2025Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A 30-06-2024.pdf · uploaded 1 Jul 2025Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A 30-09-2024.pdf · uploaded 1 Jul 2025Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A 31-12-2024.pdf · uploaded 1 Jul 2025Source
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)2A 31-03-2025.pdf · uploaded 1 Jul 2025Source
  • Form 1FORM 1 31-12-2024.pdf · uploaded 8 Dec 2025Source
  • Form 1FORM 1 SOHUM MAR 2025.pdf · uploaded 8 Dec 2025Source
  • Form 2FORM 2 31122024 SOHUM.pdf · uploaded 8 Dec 2025Source
  • Form 2FORM 2 MARCH 2025.pdf · uploaded 8 Dec 2025Source
  • Form 3FORM 3 OCT-DEC 2024.pdf · uploaded 8 Dec 2025Source
  • Form 3FORM 3 JAN- MAR 2025 (1).pdf · uploaded 8 Dec 2025Source
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD 30092023.pdf · uploaded 8 Dec 2025Source
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD 31122023.pdf · uploaded 8 Dec 2025Source
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD 31032024.pdf · uploaded 8 Dec 2025Source
  • Disclosure of Sold and Booked InventorySOLD-UNSOLD 30062024.pdf · uploaded 8 Dec 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD 30092024.pdf · uploaded 8 Dec 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD MAR 25.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 1FORM 1 JUNE 2025.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 2FORM 2 MARCH 2025.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 3Sohum Enterprise Form 3 Q1 FY 2025-26 NEW FORMAT.pdf · uploaded 8 Dec 2025Source
  • Withdrawal Update Form 1FORM 1 JUNE 2025.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 2FORM 2 PATIL.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 3Sohum Enterprise Form 3 Q1 FY 2025-26 NEW FORMAT.pdf · uploaded 22 Jul 2026Source
  • Withdrawal Update Form 1form 1 dec 2025.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 1form 1 march 2026.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 1form 1 june 2026.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2form 2 dec 2025.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2form 2 march 2026.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2form 2 june 2026.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3form 3 dec 2025.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3form 3 march 2026.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3FORM 3 JUN 2026 COMPRESSED.pdf · uploaded 4 Aug 2026Source
  • Form 5 (FY 2023-2024)FORM 5_31032024.pdf · uploaded 4 Aug 2026Source
  • Form 5 (FY 2024-2025)FORM 5 MARCH 2025.pdf · uploaded 4 Aug 2026Source
  • Form 5 (FY 2025-2026)Sohum enterprises Form 5.pdf · uploaded 4 Aug 2026Source
  • Form 2A (FY 2023-2024)form 2a march 2024.pdf · uploaded 5 Aug 2026Source
  • Form 2A (FY 2024-2025)form 2a march 2025.pdf · uploaded 5 Aug 2026Source
  • Form 2A (FY 2025-2026)form 2a march 2026.pdf · uploaded 5 Aug 2026Source

Technical

  • Document5 Plan Pass Copy.pdf · uploaded 6 May 2023Source
  • Document5 Plan Pass Copy.pdf · uploaded 6 May 2023Source
  • DocumentPLAN SOHUM REVISED (1).pdf · uploaded 25 Nov 2024Source

Technical (Architect)

  • DocumentForm 1- Dec 23.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1- March 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1- June 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1- Sep 23.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1- Sep 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1- Dec 23.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1- March 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1- June 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1- Sep 23.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 1- Sep 24.pdf · uploaded 8 Oct 2024Source
  • DocumentFORM 1 31-12-2024.pdf · uploaded 14 Jun 2025Source
  • DocumentFORM 1 SOHUM MAR 2025.pdf · uploaded 14 Jun 2025Source
  • Documentform 1 june 2026.pdf · uploaded 4 Aug 2026Source

Technical (Engineer)

  • DocumentForm 2 - Sep 23.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 2 - Dec 23.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 2 - Mar 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 2 - June 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 2- Sep 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 2 - Sep 23.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 2 - Dec 23.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 2 - Mar 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 2 - June 24.pdf · uploaded 8 Oct 2024Source
  • DocumentForm 2- Sep 24.pdf · uploaded 8 Oct 2024Source
  • DocumentFORM 2 SOHUM.pdf · uploaded 12 Jun 2025Source
  • DocumentFORM 2 MARCH 2025.pdf · uploaded 17 Jun 2025Source
  • Documentform 2 june 2026.pdf · uploaded 4 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Dawadi, Kalyan taluka

Survey, CTS, gat or plot numbers

S.NO.121. H NO.1/2/2/2

Boundaries

North
Road Chwls No 40
South
Regency Nirman S No 121
East
Regency Nirmans No 121
West
Schools No 33

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Chartered accountantSagar Joshi—
EngineerAtul Anant Desale—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology