Nandai Residency

Certificate Signed

Bhiwandi (M Corp.), Thane 421302 |Promoter: Hari Om Developers

22 Jan 2018Registered with MahaRERA
31 Dec 2027Promised completion
30 Apr 2028Revised completionPushed back 4 months
1Building
60Units registered29 booked (48%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 1RK, 2BHK, 3BHK, LANDOWNER 1BHK, LANDOWNER 1RK, LANDOWNER 2BHK, Landowner shop, LANDOWNWER 3BHK, Shop60 units in all
Address
S.no 155 H.no7/3 Pt, Kamatghar, BhiwandiPIN 421302
Designated bank account
148
Developed in phases
No

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.28125, 73.04829
Nandai Residency is at latitude 19.28125, longitude 73.04829.

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
22 Jan 2018
Promised
31 Dec 2027
Revised
30 Apr 2028

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170001501822 Jan 201831 Dec 202730 Apr 2028Hari Om DevelopersProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Nandai Residency860

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

29 of 60 units booked (48%), as the promoter reported to MahaRERA

1BHK · 19 units1RK · 4 units2BHK · 12 units3BHK · 1 unitLANDOWNER 1BHK · 6 unitsLANDOWNER 1RK · 4 unitsLANDOWNER 2BHK · 5 unitsLandowner shop · 3 unitsLANDOWNWER 3BHK · 2 unitsShop · 4 units
TypeCarpet areaUnitsBooked
1BHK29.95 sq m · 322 sq ft22
1BHK37.43 sq m · 403 sq ft65
1BHK39.66 sq m · 427 sq ft53
1BHK39.95 sq m · 430 sq ft64
1RK24.71 sq m · 266 sq ft20
1RK24.99 sq m · 269 sq ft22
2BHK42.64 sq m · 459 sq ft21
2BHK46.82 sq m · 504 sq ft55
Show all 27 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK49.85 sq m · 537 sq ft55
3BHK59.08 sq m · 636 sq ft10
LANDOWNER 1BHK29.95 sq m · 322 sq ft20
LANDOWNER 1BHK37.43 sq m · 403 sq ft10
LANDOWNER 1BHK39.66 sq m · 427 sq ft20
LANDOWNER 1BHK39.95 sq m · 430 sq ft10
LANDOWNER 1RK24.71 sq m · 266 sq ft20
LANDOWNER 1RK24.99 sq m · 269 sq ft20
LANDOWNER 2BHK42.64 sq m · 459 sq ft10
LANDOWNER 2BHK46.82 sq m · 504 sq ft20
LANDOWNER 2BHK49.85 sq m · 537 sq ft20
Landowner shop6.46 sq m · 70 sq ft10
Landowner shop9.56 sq m · 103 sq ft10
Landowner shop15.42 sq m · 166 sq ft10
LANDOWNWER 3BHK59.08 sq m · 636 sq ft20
Shop8.97 sq m · 97 sq ft10
Shop10.5 sq m · 113 sq ft11
Shop10.61 sq m · 114 sq ft10
Shop10.64 sq m · 115 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 131 filings listed on MahaRERA's project page

Registration certificate

Legal

  • OtherDEVELOP1 TO 17-ilovepdf-compressed.pdf · uploaded 18 Jan 2018Source
  • Otherdevelop18to37-ilovepdf-compressed.pdf · uploaded 18 Jan 2018Source
  • Legal Title reporttitle report.pdf · uploaded 18 Jan 2018Source
  • Declaration Form Bdeclaration form b GANESH MACHHA.pdf · uploaded 18 Jan 2018Source
  • Declaration Form BSUSMIT PATIL_0001.pdf · uploaded 8 Jun 2024Source
  • Declaration Form BSATISH BALARAM CHOUDHARI_0001.pdf · uploaded 8 Jun 2024Source

Migrated

  • 1 Copy of the legal title reporttitle report.pdf · uploaded 18 Jan 2018Source
Show all 132 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesNO ENCUMBRANCES.pdf · uploaded 18 Jan 2018Source
  • 1 Copy of Layout Approval (in case of layout)IOD.pdf · uploaded 18 Jan 2018Source
  • 1 Building Plan Approval (IOD)IOD.pdf · uploaded 18 Jan 2018Source
  • 1 Declaration in FORM Bdeclaration form b GANESH MACHHA.pdf · uploaded 18 Jan 2018Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE-FORM 1-ilovepdf-compressed.pdf · uploaded 18 Jan 2018Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE- FORM 2.pdf · uploaded 18 Jan 2018Source
  • 1 Certificates of CA (Form 3)FORM 3 COMPRESSED.pdf · uploaded 18 Jan 2018Source
  • 1 Certificates of CA (Form 5)CAMENCEMENT CERTIFICATE.pdf · uploaded 18 Jan 2018Source
  • 1 Proforma of Allotment letterALLOTMENT LETTER HARIOMDEVELOPER.pdf · uploaded 18 Jan 2018Source
  • 2 Proforma of Allotment letterDRAFT AGREEMENT.pdf · uploaded 18 Jan 2018Source
  • 1 OtherDEVELOP1 TO 17-ilovepdf-compressed.pdf · uploaded 18 Jan 2018Source
  • 2 Otherdevelop18to37-ilovepdf-compressed.pdf · uploaded 18 Jan 2018Source
  • 2 Certificates of CA (Form 3)FORM 3 HARIOM.pdf · uploaded 15 Oct 2018Source
  • 2 Certificates of CA (Form 5)FORM 5 HARIOM.pdf · uploaded 15 Oct 2018Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)HARIOM FORM 1.pdf · uploaded 7 Jan 2020Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 HARIOM.pdf · uploaded 7 Jan 2020Source
  • 3 Certificates of CA (Form 3)HARIOM june 2018.pdf · uploaded 7 Jan 2020Source
  • 4 Certificates of CA (Form 3)hariom sept-2018.pdf · uploaded 7 Jan 2020Source
  • 5 Certificates of CA (Form 3)HARIOM DEC-2018.pdf · uploaded 7 Jan 2020Source
  • 6 Certificates of CA (Form 3)HARIOM FORM 3 MARCH.pdf · uploaded 7 Jan 2020Source
  • 3 Certificates of CA (Form 5)form 5 2019.pdf · uploaded 7 Jan 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentCAMENCEMENT CERTIFICATE.pdf · uploaded 18 Nov 2021Source
  • 7 Certificates of CA (Form 3)march2020-converted-compressed.pdf · uploaded 18 Nov 2021Source
  • 8 Certificates of CA (Form 3)june 2020-converted-compressed.pdf · uploaded 18 Nov 2021Source
  • 9 Certificates of CA (Form 3)sep2020-converted-compressed.pdf · uploaded 18 Nov 2021Source
  • 10 Certificates of CA (Form 3)sep2020-converted-compressed.pdf · uploaded 18 Nov 2021Source
  • 11 Certificates of CA (Form 3)dec2020-converted-compressed.pdf · uploaded 18 Nov 2021Source
  • 12 Certificates of CA (Form 3)march2021-converted-compressed.pdf · uploaded 18 Nov 2021Source
  • 13 Certificates of CA (Form 3)june2021-converted-compressed.pdf · uploaded 18 Nov 2021Source
  • 14 Certificates of CA (Form 3)sep2021-converted-compressed.pdf · uploaded 18 Nov 2021Source
  • 4 Certificates of CA (Form 5)form 5 2019-2020.pdf · uploaded 18 Nov 2021Source
  • 5 Certificates of CA (Form 5)form 5 2020-2021.pdf · uploaded 18 Nov 2021Source
  • 1 Declaration about Commencement CertificateFORMAT D.pdf · uploaded 17 May 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)form 2a 2020.pdf · uploaded 17 May 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2a 2021.pdf · uploaded 17 May 2022Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE FOR SOLD UNSOLD UNITS.pdf · uploaded 17 May 2022Source
  • 2 Disclosure of sold/ booked inventorySOLD AND UNSOLD DECLARATION.pdf · uploaded 14 Apr 2023Source
  • 2 Building Plan Approval (IOD)REVISED APPROVED PLAN COPY NANDAI.pdf · uploaded 15 Apr 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentREVISED CC NANDAI.pdf · uploaded 15 Apr 2023Source
  • 2 Declaration about Commencement CertificateFORMAT D -REVISED CC DECLARATION-HARIOM.pdf · uploaded 15 Apr 2023Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 DEC 22 NANDAI.pdf · uploaded 15 Apr 2023Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 DEC 22 NANDAI.pdf · uploaded 15 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A-NANDAI.pdf · uploaded 15 Apr 2023Source
  • 15 Certificates of CA (Form 3)FORM 3 MARCH 22 NANDAI.pdf · uploaded 15 Apr 2023Source
  • 16 Certificates of CA (Form 3)FORM 3 JUNE 22 NANDAI.pdf · uploaded 15 Apr 2023Source
  • 17 Certificates of CA (Form 3)FORM 3 SEPT 22 NANDAI.pdf · uploaded 15 Apr 2023Source
  • 18 Certificates of CA (Form 3)FORM 3 DEC 22 NANDAI.pdf · uploaded 15 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 MARCH 22 NANDAI.pdf · uploaded 15 Apr 2023Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FROM 1 MARCH 23- HARI OM.pdf · uploaded 3 Feb 2024Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FROM 1 JUNE 2023 HARI OM.pdf · uploaded 3 Feb 2024Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 SEPT 2023 HARI OM.pdf · uploaded 3 Feb 2024Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FROM 1 DEC 2023 HARI OM.pdf · uploaded 3 Feb 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 MARCH 2023 HARI OM.pdf · uploaded 3 Feb 2024Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 JUNE 2023.pdf · uploaded 3 Feb 2024Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 SEPT 2023 HARIOM.pdf · uploaded 3 Feb 2024Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 DEC 2023 HARIOM.pdf · uploaded 3 Feb 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A MACRCH 23- HARIOM.pdf · uploaded 3 Feb 2024Source
  • 19 Certificates of CA (Form 3)FORM 3 MARCH 23 HARIOM.pdf · uploaded 3 Feb 2024Source
  • 20 Certificates of CA (Form 3)FORM 3 JUNE 2023 HARI OM.pdf · uploaded 3 Feb 2024Source
  • 21 Certificates of CA (Form 3)FORM SEPT 23 HARI OM.pdf · uploaded 3 Feb 2024Source
  • 22 Certificates of CA (Form 3)FORM 3 DEC 2023 HARIOM.pdf · uploaded 3 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)11zon_JPEG-to-PDF (7).pdf · uploaded 3 Feb 2024Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1 HARIOM.pdf · uploaded 5 Jun 2024Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2 HARIOM.pdf · uploaded 5 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A HARIOM.pdf · uploaded 5 Jun 2024Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD.pdf · uploaded 5 Jun 2024Source
  • 23 Certificates of CA (Form 3)FORM 3 HARIOM.pdf · uploaded 5 Jun 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 HARIOM.pdf · uploaded 5 Jun 2024Source
  • 2 Declaration in FORM BSUSMIT PATIL_0001.pdf · uploaded 8 Jun 2024Source
  • 3 Declaration in FORM BSATISH BALARAM CHOUDHARI_0001.pdf · uploaded 8 Jun 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1- JUNE 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1- SEPT 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)FORM 1- DEC 24- HARIOM.pdf · uploaded 10 Mar 2025Source
  • 1 Certificates of CA (Form 3)FORM 3- JUNE 24- HARI OM_11zon.pdf · uploaded 10 Mar 2025Source
  • 2 Certificates of CA (Form 3)FORM 3- SEPT 24- HARI OM_11zon.pdf · uploaded 10 Mar 2025Source
  • 3 Certificates of CA (Form 3)FORM 3- DEC 24- HARI OM_11zon.pdf · uploaded 10 Mar 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2- JUNE 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2- SEPT 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2- DEC 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • Form 1FORM 1 - MAR 2025 - HARI OM.pdf · uploaded 20 Jun 2025Source
  • Form 2FORM 2 - MAR 2025 - HARI OM.pdf · uploaded 20 Jun 2025Source
  • Form 3FORM 3 - MAR 2025 - HARI OM.pdf · uploaded 20 Jun 2025Source
  • Self-declaration of Quarterly ProgressSELF DECL - PROMOTER - HARI M MAR 2025.pdf · uploaded 20 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDISCL OF SOLD UNSOLD - HARI OM.pdf · uploaded 20 Jun 2025Source
  • Form 2A (FY 2024-2025)FORM 2A - FY 24-25 - HARI OM.pdf · uploaded 21 Jun 2025Source
  • Form 5 (FY 2024-2025)FORM 5 - FY 24-25 - HARI OM.pdf · uploaded 21 Jun 2025Source
  • Withdrawal Update Form 1FORM 1 - HARI OM - JUN 2025-1.pdf · uploaded 21 Jul 2025Source
  • Withdrawal Update Form 1FORM 1 - HARI OM - JUN 2025-1.pdf · uploaded 21 Jul 2025Source
  • Withdrawal Update Form 2FORM 2 - HARI OM - JUN 2025.pdf · uploaded 21 Jul 2025Source
  • Withdrawal Update Form 2FORM 2 - HARI OM - JUN 2025.pdf · uploaded 21 Jul 2025Source
  • Withdrawal Update Form 3FORM 3 - HARI OM - JUN 2025.pdf · uploaded 21 Jul 2025Source
  • Withdrawal Update Form 3FORM 3 - HARI OM - JUN 2025.pdf · uploaded 21 Jul 2025Source
  • Withdrawal Update Form 1FORM 1 - HARI OM - JUN 2025-1.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1FORM 1 - HARI OM - JUN 2025-1.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2FORM 2 - HARI OM - JUN 2025.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2FORM 2 - HARI OM - JUN 2025.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3FORM 3 - HARI OM - JUN 2025.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3FORM 3 - HARI OM - JUN 2025.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1FORM 1 - HARI OM - JUN 2025-1.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 2FORM 2 - HARI OM - JUN 2025.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 3FORM 3 - HARI OM - JUN 2025.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 1form 1 hariom sept 25.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 2form 2 hariom sept 25.pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 3form 3 hari om developers sept 25..pdf · uploaded 29 Nov 2025Source
  • Withdrawal Update Form 1FORM 1 HARIOM DEC 25.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 1FORM 1 HARIOM MARCH 26.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 HARIOM DEC 25.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 2FORM 2 HARIOM MARCH2025.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 NEW HARIOM DECEBER 2025.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 NEW HARIOM MAR 2026.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 1HARI OM FORM 1 JUNE 2026.pdf · uploaded 23 Jul 2026Source
  • Withdrawal Update Form 2HARI OM FORM 2 JUNE 2026.pdf · uploaded 23 Jul 2026Source
  • Withdrawal Update Form 3HARI OM FORM 3 JUNE 2026 SIGNED.pdf · uploaded 23 Jul 2026Source

Technical

  • DocumentIOD.pdf · uploaded 18 Jan 2018Source
  • DocumentIOD.pdf · uploaded 18 Jan 2018Source
  • DocumentREVISED APPROVED PLAN COPY NANDAI.pdf · uploaded 15 Apr 2023Source

Technical (Architect)

  • DocumentFORM 1- JUNE 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM 1- SEPT 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM 1- DEC 24- HARIOM.pdf · uploaded 10 Mar 2025Source
  • DocumentHARI OM FORM 1 JUNE 2026.pdf · uploaded 23 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2- JUNE 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM 2- SEPT 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • DocumentFORM 2- DEC 24- HARI OM.pdf · uploaded 10 Mar 2025Source
  • DocumentHARI OM FORM 2 JUNE 2026.pdf · uploaded 23 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Bhiwandi (M Corp.), Bhiwandi taluka

Survey, CTS, gat or plot numbers

S.NO 155 H.NO7/3 PT

Boundaries

North
Jagan Chaudhari S Land
South
S No 1555 8
East
Road
West
S No 155 6

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMiyaji And Associates Miyaji And Associates—
Chartered accountantMukesh Soni—
Chartered accountantNITIN B DHAVAN balaji dhavan—
EngineerAkram Ayyub Ansari And Associates Akram Ayyub Ansari And Associates—
EngineerMomin Shahmoil Consultant—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology