Infinity Square
Certificate SignedBhiwandi (M Corp.), Thane 421302 |Promoter: 28-Aeon Infinity LLP
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 1
- Unit types
- 2BHK, 3BHK, Office space, Shop110 units in all
- Address
- C.T.S. No. 434P, Kaneri, Kaneri, BhiwandiPIN 421302
- Designated bank account
- 76
- Developed in phases
- No
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 4 months
- Registered
- 22 Feb 2023
- Promised
- 31 Dec 2027
- Revised
- 30 Apr 2028
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700049687 | 22 Feb 2023 | 31 Dec 2027 | 30 Apr 2028 | 28-Aeon Infinity LLP | Project page |
1 building
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Type -A | 16 | 106 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
15 of 110 units booked (14%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Type -A | 2BHK | 64.17 sq m · 691 sq ft | 1 | 0 |
| Type -A | 2BHK | 65.64 sq m · 707 sq ft | 1 | 0 |
| Type -A | 2BHK | 67.23 sq m · 724 sq ft | 1 | 0 |
| Type -A | 3BHK | 55.32 sq m · 595 sq ft | 1 | 0 |
| Type -A | 3BHK | 81.8 sq m · 880 sq ft | 1 | 0 |
| Type -A | 3BHK | 82.44 sq m · 887 sq ft | 1 | 0 |
| Type -A | 3BHK | 85.58 sq m · 921 sq ft | 1 | 0 |
| Type -A | 3BHK | 89.49 sq m · 963 sq ft | 1 | 0 |
Show all 54 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Type -A | Office space | 12.66 sq m · 136 sq ft | 5 | 0 |
| Type -A | Office space | 29.17 sq m · 314 sq ft | 1 | 0 |
| Type -A | Office space | 29.39 sq m · 316 sq ft | 4 | 1 |
| Type -A | Office space | 31.2 sq m · 336 sq ft | 1 | 0 |
| Type -A | Office space | 31.22 sq m · 336 sq ft | 4 | 1 |
| Type -A | Office space | 32.71 sq m · 352 sq ft | 5 | 1 |
| Type -A | Office space | 32.87 sq m · 354 sq ft | 4 | 1 |
| Type -A | Office space | 33.02 sq m · 355 sq ft | 1 | 0 |
| Type -A | Office space | 33.05 sq m · 356 sq ft | 1 | 0 |
| Type -A | Office space | 33.16 sq m · 357 sq ft | 4 | 1 |
| Type -A | Office space | 33.21 sq m · 357 sq ft | 5 | 0 |
| Type -A | Office space | 35.09 sq m · 378 sq ft | 1 | 0 |
| Type -A | Office space | 35.48 sq m · 382 sq ft | 4 | 1 |
| Type -A | Office space | 37.78 sq m · 407 sq ft | 4 | 0 |
| Type -A | Office space | 37.8 sq m · 407 sq ft | 1 | 0 |
| Type -A | Office space | 38.61 sq m · 416 sq ft | 4 | 1 |
| Type -A | Office space | 38.63 sq m · 416 sq ft | 1 | 0 |
| Type -A | Office space | 41.66 sq m · 448 sq ft | 1 | 0 |
| Type -A | Office space | 42.81 sq m · 461 sq ft | 1 | 0 |
| Type -A | Office space | 46.78 sq m · 504 sq ft | 1 | 1 |
| Type -A | Office space | 47.25 sq m · 509 sq ft | 1 | 0 |
| Type -A | Office space | 47.48 sq m · 511 sq ft | 4 | 1 |
| Type -A | Office space | 49.04 sq m · 528 sq ft | 1 | 0 |
| Type -A | Office space | 51.51 sq m · 554 sq ft | 4 | 1 |
| Type -A | Office space | 54.68 sq m · 589 sq ft | 4 | 0 |
| Type -A | Office space | 70.4 sq m · 758 sq ft | 4 | 0 |
| Type -A | Office space | 72.4 sq m · 779 sq ft | 4 | 0 |
| Type -A | Office space | 90.51 sq m · 974 sq ft | 4 | 0 |
| Type -A | Shop | 14.72 sq m · 158 sq ft | 1 | 0 |
| Type -A | Shop | 18.74 sq m · 202 sq ft | 1 | 0 |
| Type -A | Shop | 24.1 sq m · 259 sq ft | 1 | 0 |
| Type -A | Shop | 26.29 sq m · 283 sq ft | 1 | 0 |
| Type -A | Shop | 28.76 sq m · 310 sq ft | 3 | 1 |
| Type -A | Shop | 36.22 sq m · 390 sq ft | 1 | 1 |
| Type -A | Shop | 38.66 sq m · 416 sq ft | 1 | 0 |
| Type -A | Shop | 39.07 sq m · 421 sq ft | 1 | 1 |
| Type -A | Shop | 39.17 sq m · 422 sq ft | 1 | 0 |
| Type -A | Shop | 42.68 sq m · 459 sq ft | 1 | 1 |
| Type -A | Shop | 44.75 sq m · 482 sq ft | 1 | 1 |
| Type -A | Shop | 46.18 sq m · 497 sq ft | 1 | 0 |
| Type -A | Shop | 47.27 sq m · 509 sq ft | 1 | 0 |
| Type -A | Shop | 53.41 sq m · 575 sq ft | 1 | 0 |
| Type -A | Shop | 59.92 sq m · 645 sq ft | 1 | 0 |
| Type -A | Shop | 68.68 sq m · 739 sq ft | 1 | 0 |
| Type -A | Shop | 74.09 sq m · 797 sq ft | 1 | 0 |
| Type -B | Office space | 66.04 sq m · 711 sq ft | 4 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
1 document held by Deedo, 104 filings listed on MahaRERA's project page
Finance
Legal
Migrated
- 1 Commencement Certificates / NA Order for plotted developmentInfinity square CC.pdf · uploaded 14 Jan 2023Source
Show all 105 documentsShow fewer documents
Migrated
- 1 PAN CardPAN.pdf · uploaded 16 Jan 2023Source
- 1 Copy of Layout Approval (in case of layout)Sheet-1_compressed.pdf · uploaded 16 Jan 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentSheet-2_11zon_merged_11zon.pdf · uploaded 16 Jan 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentSheet-5_11zon_merged_11zon.pdf · uploaded 16 Jan 2023Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance Finance.pdf · uploaded 31 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceEncumbrance Legal.pdf · uploaded 31 Jan 2023Source
- 1 b Details of encumbrances concerned to LegalEncumbrance Finance.pdf · uploaded 31 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalEncumbrance Legal.pdf · uploaded 31 Jan 2023Source
- 1 Declaration about Commencement CertificateFORMAT D.pdf · uploaded 31 Jan 2023Source
- 1 Declaration in FORM BForm B_ Promoter.pdf · uploaded 31 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnequre A -.pdf · uploaded 31 Jan 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 31 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report.pdf · uploaded 31 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report 1 (1)_compressed.pdf · uploaded 31 Jan 2023Source
- 1 CERSAI detailsCERSAI_Search_Report_200259267562_For_Asset_Based_Search_02_02_2023_12_18_35_773.pdf · uploaded 2 Feb 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 (2) (1)_compressed.pdf · uploaded 2 Feb 2023Source
- 1 Copy of the legal title reportorganized (63)_11zon.pdf · uploaded 10 Feb 2023Source
- 1 Proforma of Allotment letterNew Allotment Letter_AEON infinity LLP_Infinity square_050123.pdf · uploaded 10 Feb 2023Source
- 1 Proforma of Agreement for saleFinal AFS Infinity 150223.pdf · uploaded 15 Feb 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM -1 ( MARCH 2023).pdf · uploaded 23 Nov 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1 ( JUNE 2023 ).pdf · uploaded 23 Nov 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM-1( SEP 2023 ).pdf · uploaded 23 Nov 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM -2( MARCH 2023).pdf · uploaded 23 Nov 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2( JUNE 2023 ).pdf · uploaded 23 Nov 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2( SEP 2023 ).pdf · uploaded 23 Nov 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Assurance-Form 2A Infinity Square -Anjum bhai.pdf · uploaded 23 Nov 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 31ST MARCH 23_compressed.pdf · uploaded 23 Nov 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 30TH JUNE 23_compressed.pdf · uploaded 23 Nov 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 30TH SEPT 23_compressed.pdf · uploaded 23 Nov 2023Source
- 1 Disclosure of sold/ booked inventoryINVENTORY SOLD.pdf · uploaded 27 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 FINAL .pdf · uploaded 27 Nov 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)UPDATED Q1 FORM -1 ( MARCH 2023).pdf · uploaded 18 Dec 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)UPDATED Q2 FORM-1 ( JUNE 2023 ).pdf · uploaded 18 Dec 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)UPDATED Q3 FORM-1( SEP 2023 ).pdf · uploaded 18 Dec 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4_DEC-23_FORM-1_INFINITY.pdf · uploaded 25 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4_DEC-23_FORM-2_INFINITY.pdf · uploaded 25 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FROM 3 28 AEON INFINITY LLP_11zon.pdf · uploaded 25 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryDISCLOURE OF SOLD UNSOLD INFINITY SQUARE.pdf · uploaded 12 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 07FEB2024 INFINITY SQUARE_11zon.pdf · uploaded 12 Feb 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A.pdf · uploaded 12 Feb 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 23 Apr 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 23 Apr 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3_11zon.pdf · uploaded 23 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)28 aeon infinity FORM 2A.pdf · uploaded 14 May 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Scan_0017.pdf · uploaded 22 Jul 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Scan_0016.pdf · uploaded 22 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 28 AEON INFINITY SEPT 24.pdf · uploaded 6 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)28 aeon infinity form 3 june 2024_11zon.pdf · uploaded 6 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 28 infinity aept-2024_11zon.pdf · uploaded 6 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEPT 24.pdf · uploaded 6 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 28- INFINITY.pdf · uploaded 6 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)INFINITY FORM 1.pdf · uploaded 18 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 INFINITY_11zon.pdf · uploaded 18 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 INFINITY.pdf · uploaded 18 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)AEON - FORM 1 MARCH 2025.pdf · uploaded 22 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 28AEON MARCH 25_11zon.pdf · uploaded 22 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)AEON - FORM 2 MARCH 2025.pdf · uploaded 22 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)AEON - FORM 2A FY 24-25.pdf · uploaded 22 Apr 2025Source
- Form 1form 1 28 infinity.pdf · uploaded 18 Jul 2025Source
- Form 2form 2 28 infinity.pdf · uploaded 18 Jul 2025Source
- Form 3from3 28 infinity_11zon.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD.pdf · uploaded 18 Jul 2025Source
- Form 1form-1 consulting engineers certificate (upto 30 th sep 2025) SEPT 25.pdf · uploaded 15 Oct 2025Source
- Form 2Form 2 Engineer Certificate (Infinity) SEPT 25_compressed.pdf · uploaded 15 Oct 2025Source
- Form 3FORM-3 -AEON SEPT 25 SIGNED.pdf · uploaded 15 Oct 2025Source
- Disclosure of Sold and Booked InventorySOLD UNSOLD DICSLCOSURE- SIGNED.pdf · uploaded 15 Oct 2025Source
- Withdrawal Update Form 1FORM 1- 28AEON - DEC25 - FOR QPR.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2FORM 2- 28AEON - DEC25 - FOR QPR.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3FORM 3 - 28 AEON - DEC 2025-FOR QPR-1.pdf · uploaded 2 Feb 2026Source
- Form 2A (FY 2024-2025)FORM 2A - FY 24-25.pdf · uploaded 6 Feb 2026Source
- Form 5 (FY 2024-2025)FORM 5 - FY 24-25.pdf · uploaded 7 Feb 2026Source
- Withdrawal Update Form 1Form 1 Consulting Engineers Certificate 21-05-2026.pdf · uploaded 23 May 2026Source
- Withdrawal Update Form 2Form 2 Engineers Certificate 21-05-2026.pdf · uploaded 23 May 2026Source
- Withdrawal Update Form 3Form 3 4th Qrtr final.pdf · uploaded 23 May 2026Source
- Withdrawal Update Form 1Form 1(Qter 1 April to June 2026).pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 2Form 2(Qter 1 April to June 2026).pdf · uploaded 20 Jul 2026Source
- Withdrawal Update Form 3revised frm 3 june 2026_11zon.pdf · uploaded 20 Jul 2026Source
Technical
- DocumentSheet-1_compressed.pdf · uploaded 16 Jan 2023Source
- DocumentSheet-2_11zon_merged_11zon.pdf · uploaded 16 Jan 2023Source
- DocumentSheet-5_11zon_merged_11zon.pdf · uploaded 16 Jan 2023Source
- DocumentSHEET 2 - PARKING STATEMENT.pdf · uploaded 6 Feb 2026Source
- DocumentSHEET 3 AND 4 - GROUND FLOOR TO 6TH FLOOR.pdf · uploaded 6 Feb 2026Source
- DocumentSHEET 5 AND 6 - 7TH FLOOR TO 15TH FLOOR.pdf · uploaded 6 Feb 2026Source
- DocumentANNEXURE A - 28AEON INFINITY.pdf · uploaded 6 Feb 2026Source
- OthersFORMAT D - DECL OF CC - 28AEON.pdf · uploaded 6 Feb 2026Source
- OthersFORM 2- 28 AEON - FOR CORRECTION.pdf · uploaded 6 Feb 2026Source
- OthersDECL OF PROMOTER TYPE A1 NOT FOR SALE WITH REVISED CC AND PLAN.pdf · uploaded 7 Feb 2026Source
- OthersFORM 1 - 28AEON - FOR CORRECTION - SIGEND.pdf · uploaded 7 Feb 2026Source
- DocumentSHEET 1 - LAYOUT - HIGHLIGHTED.pdf · uploaded 1 Apr 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Bhiwandi (M Corp.), Bhiwandi taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 9M Wide DP Road
- South
- HP Petrol Pump
- East
- 24M Wide DP Road
- West
- CTS No - 434 P
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Lele Infratech Private Limited Mandar Jayant Lele | — |
| Chartered accountant | Chetan V Sheth | — |
| Chartered accountant | Mukesh Soni And Associates | — |
| Engineer | Akshay Ravindra Thakare | — |
Source: MahaRERA project page. Contact details are not shown.