Thakare Complex
Certificate SignedAmbarnath, Maharashtra 421502 |Promoter: Shreeji Developers
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Buildings
- 2
- Unit types
- 1BHK, 2BHK, Shop, 1 BHK, 1 RK, 2 BHK, Fiteness center, Soc. office78 units in all
- Address
- Plot Bearing S No 4 H No 3, Javsai, Ambernath, AmbernathPIN 421502
- Designated bank account
- 82
- Developed in phases
- Yes
Registered transactions
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 1 year and 5 months
The latest completion date on record passed 1 year and 5 months ago.
- Registered
- 7 Oct 2019
- Promised
- 30 Dec 2023
- Revised
- 30 May 2025
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700022578 | 7 Oct 2019 | 30 Dec 2023 | 30 May 2025 | Shreeji Developers | Project page |
2 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Thakare Complex - A Wing | 7 | 50 |
| Thakare Complex - B Wing | 4 | 28 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
56 of 78 units booked (72%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Thakare Complex - A Wing | 1BHK | 19.82 sq m · 213 sq ft | 7 | 7 |
| Thakare Complex - A Wing | 1BHK | 19.96 sq m · 215 sq ft | 1 | 1 |
| Thakare Complex - A Wing | 1BHK | 24.89 sq m · 268 sq ft | 7 | 7 |
| Thakare Complex - A Wing | 1BHK | 25.93 sq m · 279 sq ft | 1 | 1 |
| Thakare Complex - A Wing | 1BHK | 26.14 sq m · 281 sq ft | 7 | 7 |
| Thakare Complex - A Wing | 1BHK | 28.72 sq m · 309 sq ft | 7 | 7 |
| Thakare Complex - A Wing | 1BHK | 29.5 sq m · 318 sq ft | 7 | 7 |
| Thakare Complex - A Wing | 2BHK | 33.7 sq m · 363 sq ft | 7 | 7 |
Show all 23 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Thakare Complex - A Wing | Shop | 6.82 sq m · 73 sq ft | 1 | 1 |
| Thakare Complex - A Wing | Shop | 7.57 sq m · 81 sq ft | 1 | 1 |
| Thakare Complex - A Wing | Shop | 9.3 sq m · 100 sq ft | 1 | 1 |
| Thakare Complex - A Wing | Shop | 10.4 sq m · 112 sq ft | 1 | 1 |
| Thakare Complex - A Wing | Shop | 13.71 sq m · 148 sq ft | 1 | 1 |
| Thakare Complex - A Wing | Shop | 16.29 sq m · 175 sq ft | 1 | 1 |
| Thakare Complex - B Wing | 1 BHK | 26 sq m · 280 sq ft | 4 | 1 |
| Thakare Complex - B Wing | 1 BHK | 26.26 sq m · 283 sq ft | 4 | 0 |
| Thakare Complex - B Wing | 1 BHK | 26.46 sq m · 285 sq ft | 3 | 2 |
| Thakare Complex - B Wing | 1 BHK | 29.44 sq m · 317 sq ft | 3 | 0 |
| Thakare Complex - B Wing | 1 BHK | 29.71 sq m · 320 sq ft | 4 | 0 |
| Thakare Complex - B Wing | 1 RK | 21.27 sq m · 229 sq ft | 4 | 1 |
| Thakare Complex - B Wing | 2 BHK | 33.45 sq m · 360 sq ft | 4 | 2 |
| Thakare Complex - B Wing | Fiteness center | 20.15 sq m · 217 sq ft | 1 | 0 |
| Thakare Complex - B Wing | Soc. office | 11.35 sq m · 122 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 107 filings listed on MahaRERA's project page
Finance
- PAN CardBusiness pan card.pdf · uploaded 19 Jul 2019Source
Legal
Show all 109 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)Scan Plan.PDF · uploaded 19 Jul 2019Source
- 1 Building Plan Approval (IOD)Scan Plan.PDF · uploaded 19 Jul 2019Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate - 30-05-19.pdf · uploaded 19 Jul 2019Source
- 1 Proforma of Allotment letterAgreement for Sale.pdf · uploaded 19 Jul 2019Source
- 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 19 Jul 2019Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 20 Sep 2019Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 20 Sep 2019Source
- 1 Details of encumbrancesNon Emcumbrance.pdf · uploaded 25 Sep 2019Source
- 1 Declaration in FORM BForm B.pdf · uploaded 25 Sep 2019Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 28 Sep 2019Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate 24-1-2020200317_12280425.pdf · uploaded 17 Mar 2020Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate 29-1-2020200317_12313506.pdf · uploaded 17 Mar 2020Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentComplition Certificate - WING A.pdf · uploaded 4 Oct 2023Source
- 1 Declaration about Commencement CertificateCC.pdf · uploaded 20 Feb 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 FORM MARCH 2020.pdf · uploaded 20 Feb 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 FORM MARCH 2021.pdf · uploaded 20 Feb 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 FORM MARCH 2022.pdf · uploaded 20 Feb 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 FORM JUNE 2022.pdf · uploaded 20 Feb 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 FORM SEPT 2022.pdf · uploaded 20 Feb 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 FORM DEC 2022.pdf · uploaded 20 Feb 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 FORM MARCH 2023.pdf · uploaded 20 Feb 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 FORM JUNE 2023.pdf · uploaded 20 Feb 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)9 FORM SEPT 2023.pdf · uploaded 20 Feb 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)1 FORM 2 MARCH 2020.pdf · uploaded 20 Feb 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 FORM 2 MARCH 2021.pdf · uploaded 20 Feb 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)3 FORM 2 MARCH 2022.pdf · uploaded 20 Feb 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)4 FORM 2 JUNE 2022.pdf · uploaded 20 Feb 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)5 FORM 2 SEPT 2022.pdf · uploaded 20 Feb 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)6 FORM 2 DECEMBER 2022.pdf · uploaded 20 Feb 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 FORM 2 MARCH 2023.pdf · uploaded 20 Feb 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 FORM 2 JUNE 2023.pdf · uploaded 20 Feb 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 FORM 2 SEPT 2023.pdf · uploaded 20 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A FY 2019-20.pdf · uploaded 20 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A FY 2020-21.pdf · uploaded 20 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A FY 2021-22.pdf · uploaded 20 Feb 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A FY 2022-23.pdf · uploaded 20 Feb 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 FORM 3 MARCH 2020.pdf · uploaded 20 Feb 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)2 FORM 3 MARCH 2021.pdf · uploaded 20 Feb 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)3 FORM 3 MARCH 2022.pdf · uploaded 20 Feb 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)4 FORM 3 JUNE 2022.pdf · uploaded 20 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)5 FORM 3 SEPTEMBER 2022.pdf · uploaded 20 Feb 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)6 FORM 3 DECEMBER 2022.pdf · uploaded 20 Feb 2024Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)7 FORM 3 MARCH 2023.pdf · uploaded 20 Feb 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)8 FORM 3 JUNE 2023.pdf · uploaded 20 Feb 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)9 FORM 3 SEPTEMBER 2023.pdf · uploaded 20 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 19-20.pdf · uploaded 20 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 20-21.pdf · uploaded 20 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 21-22.pdf · uploaded 20 Feb 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 22-23.pdf · uploaded 20 Feb 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)DEC 23.pdf · uploaded 3 Apr 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC 23.pdf · uploaded 3 Apr 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)DEC 23.pdf · uploaded 3 Apr 2024Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD A WING.pdf · uploaded 17 Apr 2024Source
- 2 Disclosure of sold/ booked inventorySOLD UNSOLD B WING.pdf · uploaded 17 Apr 2024Source
- 1 CERSAI detailscersai.pdf · uploaded 17 Apr 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A.pdf · uploaded 17 Apr 2024Source
- 1 Proforma of Agreement for saleAgreement for Sale.pdf · uploaded 17 Apr 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSEPARATE BANK.pdf · uploaded 17 Apr 2024Source
- 1 Deviation Report with respect to Allotment letterallotment letter.pdf · uploaded 17 Apr 2024Source
- 1 Deviation Report with respect to model copy of Agreementagreement letter.pdf · uploaded 17 Apr 2024Source
- 2 Details of encumbrancesnon finance20240503_13553196.pdf · uploaded 3 May 2024Source
- 3 a Details of encumbrances concerned to Financenon legal20240503_13550466.pdf · uploaded 3 May 2024Source
- 4 a Details of encumbrances concerned to Financenon legal20240503_13550466.pdf · uploaded 3 May 2024Source
- 1 b Details of encumbrances concerned to Legalnon legal20240503_13550466.pdf · uploaded 3 May 2024Source
- 2 b Details of encumbrances concerned to Legalnon legal20240503_13550466.pdf · uploaded 3 May 2024Source
- 2 Declaration about Commencement Certificatedeclaration c c20240503_13543579.pdf · uploaded 3 May 2024Source
- 2 Declaration in FORM BFORM B AFFIDIVIT CUM DECLARATION.pdf · uploaded 3 May 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHREEJI DEVELOPERS FORM 1.pdf · uploaded 3 May 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHREEJI DEVELOPERS FORM 2.pdf · uploaded 3 May 2024Source
- 2 CERSAI detailsshreeji cersai.pdf · uploaded 3 May 2024Source
- 3 Disclosure of sold/ booked inventorySOLD UNSOLD A WING.pdf · uploaded 3 May 2024Source
- 4 Disclosure of sold/ booked inventorySOLD UNSOLD B WING.pdf · uploaded 3 May 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHREEJI DEVELOPERS FORM 3.pdf · uploaded 3 May 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A PRASID THAKUR.pdf · uploaded 3 May 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A PARAG MEHER.pdf · uploaded 3 May 2024Source
- 4 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A RAKESH THAKUR.pdf · uploaded 3 May 2024Source
- 5 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE A SURESH WATWANI.pdf · uploaded 3 May 2024Source
- 6 Disclosure of Interest in Other Real Estate OrganizationsANNEXURE PAHUJA.pdf · uploaded 3 May 2024Source
- 3 Proforma of Allotment letterAllotment Letter amended.pdf · uploaded 3 May 2024Source
- 2 Deviation Report with respect to model copy of AgreementDEVIATION with agreement for sale.pdf · uploaded 3 May 2024Source
- 5 Disclosure of sold/ booked inventoryTHAKARE COMPLEX SOLD UNSOLD.pdf · uploaded 28 May 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHREEJI DEVELOPERS - FORM 1 JUNE 2024.pdf · uploaded 19 Feb 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHREEJI DEVELOPERS -FORM 1 SEPT 2024.pdf · uploaded 19 Feb 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)SHREEJI DEVELOPERS - FORM 1 DEC 2024.pdf · uploaded 19 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHREEJI DEVELOPERS -FORM 3 JUNE 2024.pdf · uploaded 19 Feb 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHREEJI DEVELOPERS -FORM 3 SEPT 2024.pdf · uploaded 19 Feb 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SHREEJI DEVELOPERS -FORM 3 DEC 2024.pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHREEJI DEVELOPERS -FORM 2 JUNE 2024.pdf · uploaded 19 Feb 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHREEJI DEVELOPERS -FORM 2 SEPT 2024.pdf · uploaded 19 Feb 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SHREEJI DEVELOPERS -FORM 2 DEC 2024.pdf · uploaded 19 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)SHREEJI DEV FORM 2A .pdf · uploaded 19 Feb 2025Source
Technical
Technical (Architect)
- DocumentSHREEJI DEVELOPERS FORM 1.pdf · uploaded 3 May 2024Source
- DocumentSHREEJI DEVELOPERS - FORM 1 JUNE 2024.pdf · uploaded 19 Feb 2025Source
- DocumentSHREEJI DEVELOPERS -FORM 1 SEPT 2024.pdf · uploaded 19 Feb 2025Source
- DocumentSHREEJI DEVELOPERS - FORM 1 DEC 2024.pdf · uploaded 19 Feb 2025Source
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Ambarnath (R), Ambarnath taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- 24 Mt Dp Road
- South
- S No 1 And H No 6
- East
- S No 2 And H No 2
- West
- S No 2 And 3 Mt Road
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Pramod V Patil | — |
| Chartered accountant | Amrrita Jagnaani | — |
| Chartered accountant | Ashwini Krushna Prabhu | — |
| Engineer | Atul Kudtarkar & Associates | — |
| Other | Rakesh Thakur | — |
Source: MahaRERA project page. Contact details are not shown.