Vishwa Pride

Certificate Signed

Isbavi, Solapur 413304 |Promoter: Shri Samarth Associates

16 Oct 2023Registered with MahaRERA
31 Dec 2026Promised completion
1Building
19Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
—19 units in all
Address
Plot No 3 & 4 Gat No 60, Pandharpur Karad Road, Near Shaha Lawns, Varpe NagarPIN 413304
Designated bank account
21
Developed in phases
No

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 31 Dec 2026

Registered
16 Oct 2023
Promised
31 Dec 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5260005313216 Oct 202331 Dec 202631 Dec 2026Shri Samarth AssociatesProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Vishwa Pride519

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

19 units registered

— · 19 units
TypeCarpet areaUnits
——19

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 164 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardpan card.pdf · uploaded 6 Sep 2023Source

Legal

  • Legal Title reportlegal vishwa pride.pdf · uploaded 6 Sep 2023Source
  • Declaration Form BFORM B REVISE_compressed.pdf · uploaded 14 Sep 2023Source

Migrated

  • 1 PAN Cardpan card.pdf · uploaded 6 Sep 2023Source
  • 1 Copy of the legal title reportlegal vishwa pride.pdf · uploaded 6 Sep 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentSanction Plan.pdf · uploaded 6 Sep 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentSanction Letter.pdf · uploaded 6 Sep 2023Source
Show all 165 documentsShow fewer documents

Migrated

  • 1 CERSAI detailsCERSAI_Search_Report_200277424168_For_Asset_Based_Search_16_08_2023_12_49_27_101.pdf · uploaded 6 Sep 2023Source
  • 2 CERSAI detailsCERSAI_Search_Report_200277425878_For_Asset_Based_Search_16_08_2023_12_59_04_954.pdf · uploaded 6 Sep 2023Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 6 Sep 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration about Seprate bank Account.pdf · uploaded 6 Sep 2023Source
  • 1 Deviation Report with respect to Allotment letterDaviation report with respect to Allotment Letter and Agg to Sale.pdf · uploaded 6 Sep 2023Source
  • 1 Copy of Layout Approval (in case of layout)layout_compressed.pdf · uploaded 7 Sep 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate_compressed.pdf · uploaded 7 Sep 2023Source
  • 1 Proforma of Agreement for saleAGREEMENT FOR SALE for Vishwa Pride.pdf · uploaded 7 Sep 2023Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold-unsold inventory.pdf · uploaded 9 Sep 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest of partners and company_compressed.pdf · uploaded 9 Sep 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDaviation Report.pdf · uploaded 9 Sep 2023Source
  • 1 Declaration about Commencement CertificateDeclaration about Commencement Certificate Revise.pdf · uploaded 14 Sep 2023Source
  • 1 Declaration in FORM BFORM B REVISE_compressed.pdf · uploaded 14 Sep 2023Source
  • 1 Other – TechnicalMail from Chief Office Pandharpur to Maharera Aknowledgement.pdf · uploaded 14 Sep 2023Source
  • 1 a Details of encumbrances concerned to FinanceEncumbrance letter FINANCE REVISE.pdf · uploaded 22 Sep 2023Source
  • 1 b Details of encumbrances concerned to LegalEncumbrance letter FINANCE REVISE.pdf · uploaded 22 Sep 2023Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrances Letter LEGAL REVISE.pdf · uploaded 6 Oct 2023Source
  • 2 b Details of encumbrances concerned to LegalEncumbrances Letter LEGAL REVISE.pdf · uploaded 6 Oct 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31122023.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 engineers cerificate 31 dec 2023_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31122023_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 date 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31032024_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Annual Report 23-24_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30june 2024.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30 june 2024.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30062024_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A 23-24.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Annual Report 23-24_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Annual Report 23-24_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31122023.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 engineers cerificate 31 dec 2023_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31122023_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 date 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31032024_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Annual Report 23-24_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30june 2024.pdf · uploaded 6 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30 june 2024.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30062024_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A 23-24.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Annual Report 23-24_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Annual Report 23-24_compressed.pdf · uploaded 6 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 31122023.pdf · uploaded 6 Oct 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 date 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 30june 2024.pdf · uploaded 6 Oct 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 30062024_compressed.pdf · uploaded 6 Oct 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31032024_compressed.pdf · uploaded 6 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31122023_compressed.pdf · uploaded 6 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 engineers cerificate 31 dec 2023_compressed.pdf · uploaded 6 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 30 june 2024.pdf · uploaded 6 Oct 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Annual Report 23-24_compressed.pdf · uploaded 6 Oct 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2A 23-24.pdf · uploaded 6 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Annual Report 23-24_compressed.pdf · uploaded 6 Oct 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Annual Report 23-24_compressed.pdf · uploaded 6 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vishva Pride CA Certificate sep 2024.pdf · uploaded 30 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate sep 2024.pdf · uploaded 30 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form 1 - Architect's Certificate SEP.pdf · uploaded 30 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vishva Pride CA Certificate sep 2024.pdf · uploaded 30 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate sep 2024.pdf · uploaded 30 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form 1 - Architect's Certificate SEP.pdf · uploaded 30 Oct 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Form 1 - Architect's Certificate SEP.pdf · uploaded 30 Oct 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Vishva Pride CA Certificate sep 2024.pdf · uploaded 30 Oct 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate sep 2024.pdf · uploaded 30 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate.pdf · uploaded 28 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate .pdf · uploaded 28 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate .pdf · uploaded 28 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate.pdf · uploaded 28 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate .pdf · uploaded 28 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate .pdf · uploaded 28 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect's certificate.pdf · uploaded 28 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate .pdf · uploaded 28 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate .pdf · uploaded 28 Jan 2025Source
  • Form 5 (FY 2023-2024)Annual Report 23-24_compressed.pdf · uploaded 23 May 2025Source
  • Form 2A (FY 2023-2024)Engineer Certificate 2023-24.pdf · uploaded 11 Jul 2025Source
  • Form 2A (FY 2024-2025)Engineer certificate 2024-25.pdf · uploaded 11 Jul 2025Source
  • Form 2A (FY 2025-2026)Engineer certificatate 2025-26.pdf · uploaded 11 Jul 2025Source
  • Form 1Form 1 31122023.pdf · uploaded 15 Sep 2025Source
  • Form 1Form 1 date 31 mar 2024.pdf · uploaded 15 Sep 2025Source
  • Form 1Form 1 30june 2024.pdf · uploaded 15 Sep 2025Source
  • Form 11 Form 1 - Architect's Certificate SEP.pdf · uploaded 15 Sep 2025Source
  • Form 2Form 2 engineers cerificate 31 dec 2023.pdf · uploaded 15 Sep 2025Source
  • Form 2form 2 31 mar 2024.pdf · uploaded 15 Sep 2025Source
  • Form 2Form 2 30 june 2024.pdf · uploaded 15 Sep 2025Source
  • Form 22 Form 2 - Engineer's Certificate sep 2024.pdf · uploaded 15 Sep 2025Source
  • Form 3Form 3 31122023_compressed.pdf · uploaded 15 Sep 2025Source
  • Form 3Form 3 31032024_compressed.pdf · uploaded 15 Sep 2025Source
  • Form 3Form 3 30062024_compressed.pdf · uploaded 15 Sep 2025Source
  • Form 3Engineers certificate sep 2024.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryStatement Tor calculation of Receivables from the Sates of the Real Estate Project.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryStatement Tor calculation of Receivables from the Sates of the Real Estate Project.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryStatement Tor calculation of Receivables from the Sates of the Real Estate Project.pdf · uploaded 15 Sep 2025Source
  • Disclosure of Sold and Booked InventoryStatement Tor calculation of Receivables from the Sates of the Real Estate Project.pdf · uploaded 15 Sep 2025Source
  • Form 1F1-DEC-24.pdf · uploaded 20 Oct 2025Source
  • Form 1F1-MARCH-25.pdf · uploaded 20 Oct 2025Source
  • Form 2F2-Q2.pdf · uploaded 20 Oct 2025Source
  • Form 2F2-MARCH-25.pdf · uploaded 20 Oct 2025Source
  • Form 3F3-DEC-24.pdf · uploaded 20 Oct 2025Source
  • Form 3F3-MARCH-25.pdf · uploaded 20 Oct 2025Source
  • Disclosure of Sold and Booked InventorySU-DEC-24.pdf · uploaded 20 Oct 2025Source
  • Disclosure of Sold and Booked InventorySU-MARCH-25.pdf · uploaded 20 Oct 2025Source
  • Form 1F1-june-25.pdf · uploaded 6 Nov 2025Source
  • Form 1F1-SEPT-25 (1).pdf · uploaded 6 Nov 2025Source
  • Form 2F2-Q1.pdf · uploaded 6 Nov 2025Source
  • Form 2F2-Q2.pdf · uploaded 6 Nov 2025Source
  • Form 3F3-JUNE-25.pdf · uploaded 6 Nov 2025Source
  • Form 3F3-SEPT-25.pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventorySU-JUNE-25.pdf · uploaded 6 Nov 2025Source
  • Disclosure of Sold and Booked InventorySU-SEPT-25.pdf · uploaded 6 Nov 2025Source
  • Withdrawal Update Form 1F1-Q3.pdf · uploaded 11 May 2026Source
  • Withdrawal Update Form 1F1-Q4.pdf · uploaded 11 May 2026Source
  • Withdrawal Update Form 2FORM-2-DEC-25.pdf · uploaded 11 May 2026Source
  • Withdrawal Update Form 2FORM-2-MARCH-26.pdf · uploaded 11 May 2026Source
  • Withdrawal Update Form 3F3-Q3.pdf · uploaded 11 May 2026Source
  • Withdrawal Update Form 3F3-Q4.pdf · uploaded 11 May 2026Source
  • Form 5 (FY 2024-2025)FY 24-25.pdf · uploaded 15 Jun 2026Source
  • Form 5 (FY 2025-2026)FY 25-26.pdf · uploaded 15 Jun 2026Source
  • Occupational CertificateFINAL OC.pdf · uploaded 15 Jun 2026Source
  • Occupational CertificateFORM-4.pdf · uploaded 15 Jun 2026Source
  • Occupational CertificateOC MAIL.pdf · uploaded 15 Jun 2026Source

Technical

  • DocumentSanction Plan.pdf · uploaded 6 Sep 2023Source
  • Documentlayout_compressed.pdf · uploaded 7 Sep 2023Source
  • Other – TechnicalMail from Chief Office Pandharpur to Maharera Aknowledgement.pdf · uploaded 14 Sep 2023Source

Technical (Architect)

  • DocumentForm 1 31122023.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 date 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 30june 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 31122023.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 date 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 30june 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 31122023.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 date 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 1 30june 2024.pdf · uploaded 6 Oct 2024Source
  • Document1 Form 1 - Architect's Certificate SEP.pdf · uploaded 30 Oct 2024Source
  • Document1 Form 1 - Architect's Certificate SEP.pdf · uploaded 30 Oct 2024Source
  • Document1 Form 1 - Architect's Certificate SEP.pdf · uploaded 30 Oct 2024Source
  • DocumentArchitect's certificate.pdf · uploaded 28 Jan 2025Source
  • DocumentArchitect's certificate.pdf · uploaded 28 Jan 2025Source
  • DocumentArchitect's certificate.pdf · uploaded 28 Jan 2025Source
  • DocumentF1-Q4.pdf · uploaded 11 May 2026Source

Technical (Engineer)

  • DocumentForm 2 engineers cerificate 31 dec 2023_compressed.pdf · uploaded 6 Oct 2024Source
  • Documentform 2 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 2 30 june 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 2 engineers cerificate 31 dec 2023_compressed.pdf · uploaded 6 Oct 2024Source
  • Documentform 2 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 2 30 june 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 2 engineers cerificate 31 dec 2023_compressed.pdf · uploaded 6 Oct 2024Source
  • Documentform 2 31 mar 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentForm 2 30 june 2024.pdf · uploaded 6 Oct 2024Source
  • DocumentEngineers certificate sep 2024.pdf · uploaded 30 Oct 2024Source
  • DocumentEngineers certificate sep 2024.pdf · uploaded 30 Oct 2024Source
  • DocumentEngineers certificate sep 2024.pdf · uploaded 30 Oct 2024Source
  • DocumentEngineers certificate .pdf · uploaded 28 Jan 2025Source
  • DocumentEngineers certificate .pdf · uploaded 28 Jan 2025Source
  • DocumentEngineers certificate .pdf · uploaded 28 Jan 2025Source
  • DocumentFORM-2-MARCH-26.pdf · uploaded 11 May 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Isbavi, Pandharpur taluka

Survey, CTS, gat or plot numbers

4 Gat No 60Plot No 3

Boundaries

North
Plot No 2
South
Plot No 5
East
6 M Road
West
Gat No 61

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectWest Landmark Samir Sherkar Abdulgani Sherkar—
Chartered accountantPratiksha Sanjay Tulshyan—
Chartered accountantSanjeev S Kothadiya—
EngineerAsif Lalaso Sheikh—
EngineerParvej Shabbir Shaikh—
EngineerVinayak Audumbar Pawar—
OtherSantosh Mane—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology