Galande Complex

Certificate Signed

Utekhol, Raigarh 402104 |Promoter: Santosh Sahadev Galande

Residential / Group HousingRERAP52000025291
5 Apr 2020Registered with MahaRERA
31 Dec 2028Promised completion
30 Apr 2029Revised completionPushed back 4 months
1Building
36Units registered0 booked (0%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, Shop36 units in all
Address
74/11/D/13, Utekhol, New Panchayat SamitiPIN 402104
Designated bank account
82
Developed in phases
No

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 4 months

Registered
5 Apr 2020
Promised
31 Dec 2028
Revised
30 Apr 2029

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P520000252915 Apr 202031 Dec 202830 Apr 2029Santosh Sahadev GalandeProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Galande Complex436

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 of 36 units booked (0%), as the promoter reported to MahaRERA

1BHK · 24 units2BHK · 7 unitsShop · 5 units
TypeCarpet areaUnitsBooked
1BHK34.37 sq m · 370 sq ft40
1BHK34.98 sq m · 377 sq ft40
1BHK34.99 sq m · 377 sq ft40
1BHK35.83 sq m · 386 sq ft40
1BHK37.33 sq m · 402 sq ft40
1BHK37.78 sq m · 407 sq ft40
2BHK47.23 sq m · 508 sq ft30
2BHK48.73 sq m · 525 sq ft40
Show all 13 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop15.2 sq m · 164 sq ft10
Shop19.38 sq m · 209 sq ft10
Shop22.41 sq m · 241 sq ft10
Shop26.13 sq m · 281 sq ft10
Shop40.54 sq m · 436 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

1 document held by Deedo, 143 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN SANTOSH.pdf · uploaded 6 Mar 2020Source

Legal

  • Legal Title reportSearch Title Report.pdf · uploaded 7 Mar 2020Source
  • Declaration Form BForm B.pdf · uploaded 7 Mar 2020Source

Migrated

  • 1 PAN CardPAN SANTOSH.pdf · uploaded 6 Mar 2020Source
  • 1 Details of encumbrancesletter of encumbrances.pdf · uploaded 6 Mar 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC_Mangaon.pdf · uploaded 6 Mar 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)arkitech.pdf · uploaded 6 Mar 2020Source
Show all 144 documentsShow fewer documents

Migrated

  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 CA.pdf · uploaded 6 Mar 2020Source
  • 1 Copy of the legal title reportSearch Title Report.pdf · uploaded 7 Mar 2020Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 7 Mar 2020Source
  • 1 Proforma of Allotment letterProforma of allotment and agreement for sale.pdf · uploaded 13 Mar 2020Source
  • 1 Copy of Layout Approval (in case of layout)plan_compressed.pdf · uploaded 2 Apr 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentplan_compressed.pdf · uploaded 2 Apr 2020Source
  • 2 Building Plan Approval / NA Order for plotted developmentRevised Sanction Galande complex.pdf · uploaded 2 Aug 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentCommencement certificate Galande.pdf · uploaded 2 Aug 2023Source
  • 3 Commencement Certificates / NA Order for plotted developmentCommencement certificate Galande.pdf · uploaded 2 Aug 2023Source
  • 2 Details of encumbrances2 No Encumbrances Finance.pdf · uploaded 22 May 2024Source
  • 3 a Details of encumbrances concerned to Finance1 No Encumbrances Legal.pdf · uploaded 22 May 2024Source
  • 1 b Details of encumbrances concerned to Legal1 No Encumbrances Legal.pdf · uploaded 22 May 2024Source
  • 1 Declaration about Commencement Certificate3 Commencement Declaration.pdf · uploaded 22 May 2024Source
  • 1 CERSAI details6 No Cersai Certificate.pdf · uploaded 22 May 2024Source
  • 1 Disclosure of Interest in Other Real Estate Organizations7 Director Disclosure- Santosh.pdf · uploaded 22 May 2024Source
  • 2 Proforma of Allotment letterAllotment Letter_compressed.pdf · uploaded 22 May 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same8 Bank DEclaration Escrow- details.pdf · uploaded 22 May 2024Source
  • 1 Deviation Report with respect to Allotment letter4 No Deviation Allotmnet Letter.pdf · uploaded 22 May 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande DEC 2021.pdf · uploaded 14 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande MARCH 2021.pdf · uploaded 14 Apr 2025Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande DEC 2024 (1).pdf · uploaded 14 Apr 2025Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande SEPT 2024.pdf · uploaded 14 Apr 2025Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande JUNE 2024.pdf · uploaded 14 Apr 2025Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande MARCH 2024.pdf · uploaded 14 Apr 2025Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande DEC 2023.pdf · uploaded 14 Apr 2025Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande SEPT 2023.pdf · uploaded 14 Apr 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande JUNE 2023.pdf · uploaded 14 Apr 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande MARCH 2023.pdf · uploaded 14 Apr 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande DEC 2022.pdf · uploaded 14 Apr 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande SEPT 2022.pdf · uploaded 14 Apr 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande JUNE 2022.pdf · uploaded 14 Apr 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 galande MARCH 2022.pdf · uploaded 14 Apr 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande JUNE 2022_11zon.pdf · uploaded 14 Apr 2025Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande MARCH 2025_11zon.pdf · uploaded 14 Apr 2025Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 galande DEC 2024_11zon.pdf · uploaded 14 Apr 2025Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 galande SEPT 2024_11zon.pdf · uploaded 14 Apr 2025Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande JUNE 2024_11zon.pdf · uploaded 14 Apr 2025Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande MARCH 2024_11zon.pdf · uploaded 14 Apr 2025Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 Galande DEC 2023_11zon.pdf · uploaded 14 Apr 2025Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande SEPT 2023_11zon.pdf · uploaded 14 Apr 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande JUNE 2023_11zon.pdf · uploaded 14 Apr 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande MARCH 2023_11zon.pdf · uploaded 14 Apr 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande DEC 2022_11zon.pdf · uploaded 14 Apr 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande SEPT 2022_11zon.pdf · uploaded 14 Apr 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande MARCH 2022_11zon.pdf · uploaded 14 Apr 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM3 galande DEC 2021_11zon.pdf · uploaded 14 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 galande MARCH 2021_11zon.pdf · uploaded 14 Apr 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande MARCH 2022.pdf · uploaded 14 Apr 2025Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande MARCH 2025.pdf · uploaded 14 Apr 2025Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 Galande DEC 2024.pdf · uploaded 14 Apr 2025Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande SEPT 2024.pdf · uploaded 14 Apr 2025Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande JUNE 2024.pdf · uploaded 14 Apr 2025Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande MARCH 2024.pdf · uploaded 14 Apr 2025Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande DEC 2023.pdf · uploaded 14 Apr 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande SEPT 2023.pdf · uploaded 14 Apr 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande MARCH 2023.pdf · uploaded 14 Apr 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande DEC 2022.pdf · uploaded 14 Apr 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 Galande SEPT 2022.pdf · uploaded 14 Apr 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM2 galande JUNE 2022.pdf · uploaded 14 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 galande DEC 2021.pdf · uploaded 14 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 galande MARCH 2021.pdf · uploaded 14 Apr 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 galande JUNE 2023.pdf · uploaded 14 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM5 APRIL 2020 TO MARCH 2021.pdf · uploaded 14 Apr 2025Source
  • 6 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE DEC 2022.pdf · uploaded 14 Apr 2025Source
  • 15 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE MARCH 2025.pdf · uploaded 14 Apr 2025Source
  • 14 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE DEC 2024.pdf · uploaded 14 Apr 2025Source
  • 13 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE SEPT 2024.pdf · uploaded 14 Apr 2025Source
  • 12 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE JUNE 2024.pdf · uploaded 14 Apr 2025Source
  • 11 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE MARCH 2024.pdf · uploaded 14 Apr 2025Source
  • 10 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE DEC 2023.pdf · uploaded 14 Apr 2025Source
  • 9 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE SEPT 2023.pdf · uploaded 14 Apr 2025Source
  • 8 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE JUNE 2023.pdf · uploaded 14 Apr 2025Source
  • 7 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE MARCH 2023.pdf · uploaded 14 Apr 2025Source
  • 5 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE SEPT 2022.pdf · uploaded 14 Apr 2025Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE JUNE 2022.pdf · uploaded 14 Apr 2025Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLDGALANDE MARCH 2022.pdf · uploaded 14 Apr 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE DEC 2021.pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD GALANDE MARCH 2021.pdf · uploaded 14 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM5 APRIL 21 TO MARCH 22.pdf · uploaded 14 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM5 APRIL22 TO MARCH 23.pdf · uploaded 14 Apr 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM5 APRIL23 TO MARCH 24.pdf · uploaded 14 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM2A MARCH 2021 (2).pdf · uploaded 21 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM2A MARCH 2022.pdf · uploaded 21 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A MARCH 2023.pdf · uploaded 21 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM2A MARCH 2024.pdf · uploaded 21 Apr 2025Source
  • Form 1FORM 1 MARCH 2025 (2).pdf · uploaded 28 May 2025Source
  • Form 2A (FY 2024-2025)FORM 2A MARCH 2025 Galande complex.pdf · uploaded 1 Jan 2026Source
  • Withdrawal Update Form 1Form 1 June 2025.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 1Form 1 SEPT 2025.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 1Form 1 DEC 2025..pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 2Form-2 June 2025.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 2Form-2 Sept 2025.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 2Form-2 Dec 2025.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 3Form-3 June 2025.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 3Form-3 Sept 2025.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 3Form-3 Dec 2025.pdf · uploaded 23 Jan 2026Source
  • Form 5 (FY 2024-2025)FORM 5 FINAL_ 2024-25 Galande complex.pdf · uploaded 3 Feb 2026Source
  • Withdrawal Update Form 1ARKITECH FORM 1.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 2FORM 2_ MARCH 2026.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 3FORM 3 CA 31032026 _Final.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 1FORM 1 3062026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Engineer 30062026.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3Form 3 CA 30062026__2.pdf · uploaded 20 Jul 2026Source

Technical

  • Documentplan_compressed.pdf · uploaded 2 Apr 2020Source
  • Documentplan_compressed.pdf · uploaded 2 Apr 2020Source
  • DocumentRevised Sanction Galande complex.pdf · uploaded 2 Aug 2023Source

Technical (Architect)

  • DocumentForm 1 galande MARCH 2021.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande DEC 2021.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande MARCH 2022.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande JUNE 2022.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande SEPT 2022.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande DEC 2022.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande MARCH 2023.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande JUNE 2023.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande SEPT 2023.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande DEC 2023.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande MARCH 2024.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande JUNE 2024.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande SEPT 2024.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 1 galande DEC 2024 (1).pdf · uploaded 14 Apr 2025Source
  • DocumentFORM 1 3062026.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 galande DEC 2021.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande MARCH 2022.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande JUNE 2022.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 Galande SEPT 2022.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande DEC 2022.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande MARCH 2023.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM 2 galande JUNE 2023.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande SEPT 2023.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande DEC 2023.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande MARCH 2024.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande JUNE 2024.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande SEPT 2024.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 Galande DEC 2024.pdf · uploaded 14 Apr 2025Source
  • DocumentFORM2 galande MARCH 2025.pdf · uploaded 14 Apr 2025Source
  • DocumentForm 2 Engineer 30062026.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Utekhol, Mangaon taluka

Survey, CTS, gat or plot numbers

74/11/D/13

Boundaries

North
Mr Rajendra Kolwankar
South
Mr Vishnu Sawant
East
Nagarpanchayat Road
West
Adjacent S No 236

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr Abhijeet Mohite—
Chartered accountantNeha Mhatre & Associates—
EngineerAssociated Consulting Engineers—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology