Skip to content
Deedo home
Menu

Sai Prasad Garden- Phase 2

Certificate Signed

Nevali, Raigarh 410206 |Promoter: Sai Prasad Enterprises

Residential / Group HousingRERAP52000019248
14 Jan 2019Registered with MahaRERA
30 Dec 2023Promised completion
29 Dec 2024Revised completionPushed back 1 year
9Buildings
144Units registered120 booked (83%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Buildings
9
Unit types
1BHK144 units in all
Address
Part of Survey no 4/B, NEVALI, NEVALIPIN 410206
Designated bank account
220
Developed in phases
Yes

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion pushed back 1 year

The latest completion date on record passed 1 year and 10 months ago.

Registered
14 Jan 2019
Promised
30 Dec 2023
Revised
29 Dec 2024

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5200001924814 Jan 201930 Dec 202329 Dec 2024Sai Prasad EnterprisesProject page

9 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

120 of 144 units booked (83%), as the promoter reported to MahaRERA

1BHK · 144 units
BuildingTypeCarpet areaUnitsBooked
Building No- 101BHK34.35 sq m · 370 sq ft44
Building No- 101BHK34.36 sq m · 370 sq ft44
Building No- 101BHK34.39 sq m · 370 sq ft44
Building No- 101BHK34.41 sq m · 370 sq ft44
Building No-111BHK42.14 sq m · 454 sq ft21
Building No-111BHK42.15 sq m · 454 sq ft20
Building No-111BHK42.74 sq m · 460 sq ft44
Building No-111BHK42.75 sq m · 460 sq ft65
Show all 48 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building No-111BHK42.76 sq m · 460 sq ft22
Building No-121BHK42.14 sq m · 454 sq ft20
Building No-121BHK42.15 sq m · 454 sq ft20
Building No-121BHK42.74 sq m · 460 sq ft44
Building No-121BHK42.75 sq m · 460 sq ft63
Building No-121BHK42.76 sq m · 460 sq ft21
Building No- 131BHK42.14 sq m · 454 sq ft21
Building No- 131BHK42.15 sq m · 454 sq ft20
Building No- 131BHK42.74 sq m · 460 sq ft44
Building No- 131BHK42.75 sq m · 460 sq ft66
Building No- 131BHK42.76 sq m · 460 sq ft22
Building No- 51BHK32.14 sq m · 346 sq ft22
Building No- 51BHK32.15 sq m · 346 sq ft22
Building No- 51BHK32.29 sq m · 348 sq ft22
Building No- 51BHK32.31 sq m · 348 sq ft11
Building No- 51BHK34.31 sq m · 369 sq ft11
Building No- 51BHK34.35 sq m · 370 sq ft22
Building No- 51BHK34.36 sq m · 370 sq ft22
Building No- 51BHK34.39 sq m · 370 sq ft22
Building No- 51BHK34.41 sq m · 370 sq ft22
Building No- 61BHK32.15 sq m · 346 sq ft22
Building No- 61BHK32.31 sq m · 348 sq ft21
Building No- 61BHK34.35 sq m · 370 sq ft44
Building No- 61BHK34.36 sq m · 370 sq ft22
Building No- 61BHK34.39 sq m · 370 sq ft44
Building No- 61BHK34.41 sq m · 370 sq ft22
Building No- 71BHK40.12 sq m · 432 sq ft20
Building No- 71BHK42.12 sq m · 453 sq ft22
Building No- 71BHK42.74 sq m · 460 sq ft44
Building No- 71BHK42.75 sq m · 460 sq ft66
Building No- 71BHK42.76 sq m · 460 sq ft22
Building No- 81BHK40.12 sq m · 432 sq ft20
Building No- 81BHK42.12 sq m · 453 sq ft20
Building No- 81BHK42.74 sq m · 460 sq ft44
Building No- 81BHK42.75 sq m · 460 sq ft65
Building No- 81BHK42.76 sq m · 460 sq ft21
Building No-91BHK34.35 sq m · 370 sq ft44
Building No-91BHK34.36 sq m · 370 sq ft44
Building No-91BHK34.39 sq m · 370 sq ft44
Building No-91BHK34.41 sq m · 370 sq ft44

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 85 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Legal

  • Declaration Form BAffidavit_cum_Declaration-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • Legal Title reportTITLE CERTIFICATE-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • Declaration Form BForm B.pdf · uploaded 30 Dec 2023Source

Migrated

  • 1 Copy of the legal title reportTITLE CERTIFICATE-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • 1 Details of encumbrancesBuilder_s_Certificate_-_Phase_2.pdf · uploaded 31 Dec 2018Source
  • 1 Copy of Layout Approval (in case of layout)MYSCAN_20170714_0002-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
Show all 87 documentsShow fewer documents

Migrated

  • 2 Copy of Layout Approval (in case of layout)master kayout.pdf · uploaded 31 Dec 2018Source
  • 1 Building Plan Approval (IOD)MYSCAN_20170714_0001-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • 2 Building Plan Approval (IOD)MYSCAN_20170714_0002-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • 3 Building Plan Approval (IOD)MYSCAN_20170714_0003-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentimg01089.pdf · uploaded 31 Dec 2018Source
  • 1 Declaration in FORM BAffidavit_cum_Declaration-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect_s_Certificate_-_Phase_2-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer_s_Certificate_-_Phase_2-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • 1 Certificates of CA (Form 3)C_A_Certificate_-_Phase_2-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • 1 Proforma of Allotment letterAllotment_Letter_-_Phase_2-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate-Phase 2-DEC18.pdf · uploaded 21 May 2019Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate Phase 2-Dec 18.pdf · uploaded 21 May 2019Source
  • 2 Certificates of CA (Form 3)CA Certificate Phase 2-DEC 18.pdf · uploaded 21 May 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)SAI_PRASAD_PHASE_2.pdf · uploaded 20 Jan 2020Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect__Certificate_-2_compressed.pdf · uploaded 24 Feb 2020Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer_Certificate_-2_compressed.pdf · uploaded 24 Feb 2020Source
  • 3 Certificates of CA (Form 3)FORM_3_Sai_Prasad_Garden_compressed.pdf · uploaded 24 Feb 2020Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sai Prasad Enterprises 31 March 2022.pdf · uploaded 25 Jul 2022Source
  • 1 CERSAI detailsSai Prasad Garden- Phase 2.pdf · uploaded 25 Jul 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate 298.pdf · uploaded 30 Sep 2022Source
  • 3 Copy of Layout Approval (in case of layout)BP_309_ACC FINAL DRAWINGS (stamp)_compressed_compressed (1)_compressed_11zon_11zon_11zon (1) (1).pdf · uploaded 3 Mar 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentCIDCO_NAINA_BP-00309_2014_Amm1_CCLetter (1).pdf · uploaded 3 Mar 2023Source
  • 4 Certificates of CA (Form 3)Form 3 Sai Prasad Garden Phase 2 March 22.pdf · uploaded 10 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2019-20.pdf · uploaded 10 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2020-21.pdf · uploaded 10 Mar 2023Source
  • 1 Proforma of Agreement for saleSai Prasad Garden Phase II - AFS.pdf · uploaded 15 Mar 2023Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Prasad Garden Phase II Jun 2022 - Form 2.pdf · uploaded 27 Apr 2023Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Prasad Garden Phase II Sept 2022 - Form 2.pdf · uploaded 27 Apr 2023Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Prasad Garden Phase II Dec 2022 - Form 2.pdf · uploaded 27 Apr 2023Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Sai Prasad Garden Phase 2 as on March 2023.pdf · uploaded 27 Apr 2023Source
  • 5 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on June 2022.pdf · uploaded 27 Apr 2023Source
  • 6 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on September 2022.pdf · uploaded 27 Apr 2023Source
  • 7 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on December 2022.pdf · uploaded 27 Apr 2023Source
  • 8 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on March 2023.pdf · uploaded 27 Apr 2023Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Sai Prasad Garden Phase II as on June 2023.pdf · uploaded 18 Jul 2023Source
  • 9 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on 30-06-2023.pdf · uploaded 18 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5- Sai Prasad Garden as on 2022-23.pdf · uploaded 28 Sep 2023Source
  • 10 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on 30-09-2023.pdf · uploaded 21 Oct 2023Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Sai Prasad Garden Phase 2 as on 30-09-2023.pdf · uploaded 27 Oct 2023Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- SAI PRASAD GARDEN PHASE-2 as on 18-04-2023_compressed.pdf · uploaded 6 Nov 2023Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- SAI PRASAD GARDEN PHASE-2 as on 10-07-2023_compressed.pdf · uploaded 6 Nov 2023Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- SAI PRASAD GARDEN PHASE-2 as on 01-11-2023_compressed.pdf · uploaded 6 Nov 2023Source
  • 2 Declaration in FORM BForm B.pdf · uploaded 30 Dec 2023Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_11zon.pdf · uploaded 30 Dec 2023Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 30 Dec 2023Source
  • 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 30 Dec 2023Source
  • 11 Certificates of CA (Form 3)Form 3_11zon.pdf · uploaded 30 Dec 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 18-19.pdf · uploaded 30 Dec 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 19-20.pdf · uploaded 30 Dec 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 20-21.pdf · uploaded 30 Dec 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 21-22.pdf · uploaded 30 Dec 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23_11zon.pdf · uploaded 30 Dec 2023Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Latest_11zon.pdf · uploaded 23 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 19-20.pdf · uploaded 23 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 20-21.pdf · uploaded 23 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 21-22.pdf · uploaded 23 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 22-23.pdf · uploaded 23 Jan 2024Source
  • 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 30 Jan 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 30 Jan 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 30 Jan 2024Source
  • 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 30 Jan 2024Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Sai Prasad Garden Phase 2 as on Dec 2023.pdf · uploaded 20 Mar 2024Source
  • 12 Certificates of CA (Form 3)Form 3 - Sai Prasad Garden Phase 2 as on Dec 2023.pdf · uploaded 20 Mar 2024Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart OC - Sai Prasad Garden Phase 2.pdf · uploaded 20 Mar 2024Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Sai Prasad Garden Phase 2 as on March 2024.pdf · uploaded 30 May 2024Source
  • 13 Certificates of CA (Form 3)Form 3 - Sai Prasad Garden Phase 2 as on March 2024.pdf · uploaded 30 May 2024Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC - Sai Prasad Garden- Phase 2.pdf · uploaded 1 Jun 2024Source
  • 1 Architect’s Certificate on Completion of Project (Form 4)Form 4 - Sai Prasad Garden- Phase 2.pdf · uploaded 5 Jun 2024Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)8 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf · uploaded 16 Jul 2024Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 16 Jul 2024Source
  • 14 Certificates of CA (Form 3)13 Certificates of CA (Form 3).pdf · uploaded 16 Jul 2024Source

Technical

  • DocumentMYSCAN_20170714_0002-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • Documentmaster kayout.pdf · uploaded 31 Dec 2018Source
  • DocumentMYSCAN_20170714_0001-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • DocumentMYSCAN_20170714_0002-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • DocumentMYSCAN_20170714_0003-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
  • DocumentBP_309_ACC FINAL DRAWINGS (stamp)_compressed_compressed (1)_compressed_11zon_11zon_11zon (1) (1).pdf · uploaded 3 Mar 2023Source

Technical (Architect)

  • Document8 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf · uploaded 16 Jul 2024Source

Technical (Engineer)

  • Document13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 16 Jul 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Nevali, Panvel taluka

Survey, CTS, gat or plot numbers

Part of Survey no 4/B

Boundaries

North
Sai Prasad Garden Phase 3
South
9 M Dp Road Sai Prasad Phase 1
East
Adjoiing Survey No 4-5 12 5-5
West
Adjoining Survey 5-4 5-1 4-1

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectNirmaan Architects—
Chartered accountantBhavin Gadhiya Associates—
Chartered accountantRutuja Narsingh & Associates—
EngineerSK Consultants & Engineers—
EngineerVastukalp—
OtherRERA Easy—
OtherSky Enterprises—
Registered real estate agentSpace India Builders & Developers—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology