Sai Prasad Garden- Phase 2
Certificate SignedNevali, Raigarh 410206 |Promoter: Sai Prasad Enterprises
Project summary
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Buildings
- 9
- Unit types
- 1BHK144 units in all
- Address
- Part of Survey no 4/B, NEVALI, NEVALIPIN 410206
- Designated bank account
- 220
- Developed in phases
- Yes
Latest registered deals
Completion timeline
Registration date, the completion date promised at registration, and any extension since
Completion pushed back 1 year
The latest completion date on record passed 1 year and 10 months ago.
- Registered
- 14 Jan 2019
- Promised
- 30 Dec 2023
- Revised
- 29 Dec 2024
RERA registration
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52000019248 | 14 Jan 2019 | 30 Dec 2023 | 29 Dec 2024 | Sai Prasad Enterprises | Project page |
9 buildings
Buildings and wings named in the registration
| Building | Sanctioned floors | Units |
|---|---|---|
| Building No- 10 | 5 | 16 |
| Building No-11 | 5 | 16 |
| Building No-12 | 5 | 16 |
| Building No- 13 | 5 | 16 |
| Building No- 5 | 5 | 16 |
| Building No- 6 | 5 | 16 |
| Building No- 7 | 5 | 16 |
| Building No- 8 | 5 | 16 |
| Building No-9 | 5 | 16 |
Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.
Units and parking
120 of 144 units booked (83%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No- 10 | 1BHK | 34.35 sq m · 370 sq ft | 4 | 4 |
| Building No- 10 | 1BHK | 34.36 sq m · 370 sq ft | 4 | 4 |
| Building No- 10 | 1BHK | 34.39 sq m · 370 sq ft | 4 | 4 |
| Building No- 10 | 1BHK | 34.41 sq m · 370 sq ft | 4 | 4 |
| Building No-11 | 1BHK | 42.14 sq m · 454 sq ft | 2 | 1 |
| Building No-11 | 1BHK | 42.15 sq m · 454 sq ft | 2 | 0 |
| Building No-11 | 1BHK | 42.74 sq m · 460 sq ft | 4 | 4 |
| Building No-11 | 1BHK | 42.75 sq m · 460 sq ft | 6 | 5 |
Show all 48 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building No-11 | 1BHK | 42.76 sq m · 460 sq ft | 2 | 2 |
| Building No-12 | 1BHK | 42.14 sq m · 454 sq ft | 2 | 0 |
| Building No-12 | 1BHK | 42.15 sq m · 454 sq ft | 2 | 0 |
| Building No-12 | 1BHK | 42.74 sq m · 460 sq ft | 4 | 4 |
| Building No-12 | 1BHK | 42.75 sq m · 460 sq ft | 6 | 3 |
| Building No-12 | 1BHK | 42.76 sq m · 460 sq ft | 2 | 1 |
| Building No- 13 | 1BHK | 42.14 sq m · 454 sq ft | 2 | 1 |
| Building No- 13 | 1BHK | 42.15 sq m · 454 sq ft | 2 | 0 |
| Building No- 13 | 1BHK | 42.74 sq m · 460 sq ft | 4 | 4 |
| Building No- 13 | 1BHK | 42.75 sq m · 460 sq ft | 6 | 6 |
| Building No- 13 | 1BHK | 42.76 sq m · 460 sq ft | 2 | 2 |
| Building No- 5 | 1BHK | 32.14 sq m · 346 sq ft | 2 | 2 |
| Building No- 5 | 1BHK | 32.15 sq m · 346 sq ft | 2 | 2 |
| Building No- 5 | 1BHK | 32.29 sq m · 348 sq ft | 2 | 2 |
| Building No- 5 | 1BHK | 32.31 sq m · 348 sq ft | 1 | 1 |
| Building No- 5 | 1BHK | 34.31 sq m · 369 sq ft | 1 | 1 |
| Building No- 5 | 1BHK | 34.35 sq m · 370 sq ft | 2 | 2 |
| Building No- 5 | 1BHK | 34.36 sq m · 370 sq ft | 2 | 2 |
| Building No- 5 | 1BHK | 34.39 sq m · 370 sq ft | 2 | 2 |
| Building No- 5 | 1BHK | 34.41 sq m · 370 sq ft | 2 | 2 |
| Building No- 6 | 1BHK | 32.15 sq m · 346 sq ft | 2 | 2 |
| Building No- 6 | 1BHK | 32.31 sq m · 348 sq ft | 2 | 1 |
| Building No- 6 | 1BHK | 34.35 sq m · 370 sq ft | 4 | 4 |
| Building No- 6 | 1BHK | 34.36 sq m · 370 sq ft | 2 | 2 |
| Building No- 6 | 1BHK | 34.39 sq m · 370 sq ft | 4 | 4 |
| Building No- 6 | 1BHK | 34.41 sq m · 370 sq ft | 2 | 2 |
| Building No- 7 | 1BHK | 40.12 sq m · 432 sq ft | 2 | 0 |
| Building No- 7 | 1BHK | 42.12 sq m · 453 sq ft | 2 | 2 |
| Building No- 7 | 1BHK | 42.74 sq m · 460 sq ft | 4 | 4 |
| Building No- 7 | 1BHK | 42.75 sq m · 460 sq ft | 6 | 6 |
| Building No- 7 | 1BHK | 42.76 sq m · 460 sq ft | 2 | 2 |
| Building No- 8 | 1BHK | 40.12 sq m · 432 sq ft | 2 | 0 |
| Building No- 8 | 1BHK | 42.12 sq m · 453 sq ft | 2 | 0 |
| Building No- 8 | 1BHK | 42.74 sq m · 460 sq ft | 4 | 4 |
| Building No- 8 | 1BHK | 42.75 sq m · 460 sq ft | 6 | 5 |
| Building No- 8 | 1BHK | 42.76 sq m · 460 sq ft | 2 | 1 |
| Building No-9 | 1BHK | 34.35 sq m · 370 sq ft | 4 | 4 |
| Building No-9 | 1BHK | 34.36 sq m · 370 sq ft | 4 | 4 |
| Building No-9 | 1BHK | 34.39 sq m · 370 sq ft | 4 | 4 |
| Building No-9 | 1BHK | 34.41 sq m · 370 sq ft | 4 | 4 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Documents
2 documents held by Deedo, 85 filings listed on MahaRERA's project page
Legal
Migrated
- 1 Copy of the legal title reportTITLE CERTIFICATE-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- 1 Details of encumbrancesBuilder_s_Certificate_-_Phase_2.pdf · uploaded 31 Dec 2018Source
- 1 Copy of Layout Approval (in case of layout)MYSCAN_20170714_0002-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
Show all 87 documentsShow fewer documents
Migrated
- 2 Copy of Layout Approval (in case of layout)master kayout.pdf · uploaded 31 Dec 2018Source
- 1 Building Plan Approval (IOD)MYSCAN_20170714_0001-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- 2 Building Plan Approval (IOD)MYSCAN_20170714_0002-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- 3 Building Plan Approval (IOD)MYSCAN_20170714_0003-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentimg01089.pdf · uploaded 31 Dec 2018Source
- 1 Declaration in FORM BAffidavit_cum_Declaration-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect_s_Certificate_-_Phase_2-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer_s_Certificate_-_Phase_2-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- 1 Certificates of CA (Form 3)C_A_Certificate_-_Phase_2-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- 1 Proforma of Allotment letterAllotment_Letter_-_Phase_2-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate-Phase 2-DEC18.pdf · uploaded 21 May 2019Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate Phase 2-Dec 18.pdf · uploaded 21 May 2019Source
- 2 Certificates of CA (Form 3)CA Certificate Phase 2-DEC 18.pdf · uploaded 21 May 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)SAI_PRASAD_PHASE_2.pdf · uploaded 20 Jan 2020Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect__Certificate_-2_compressed.pdf · uploaded 24 Feb 2020Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer_Certificate_-2_compressed.pdf · uploaded 24 Feb 2020Source
- 3 Certificates of CA (Form 3)FORM_3_Sai_Prasad_Garden_compressed.pdf · uploaded 24 Feb 2020Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sai Prasad Enterprises 31 March 2022.pdf · uploaded 25 Jul 2022Source
- 1 CERSAI detailsSai Prasad Garden- Phase 2.pdf · uploaded 25 Jul 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Certificate 298.pdf · uploaded 30 Sep 2022Source
- 3 Copy of Layout Approval (in case of layout)BP_309_ACC FINAL DRAWINGS (stamp)_compressed_compressed (1)_compressed_11zon_11zon_11zon (1) (1).pdf · uploaded 3 Mar 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCIDCO_NAINA_BP-00309_2014_Amm1_CCLetter (1).pdf · uploaded 3 Mar 2023Source
- 4 Certificates of CA (Form 3)Form 3 Sai Prasad Garden Phase 2 March 22.pdf · uploaded 10 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 2019-20.pdf · uploaded 10 Mar 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 2020-21.pdf · uploaded 10 Mar 2023Source
- 1 Proforma of Agreement for saleSai Prasad Garden Phase II - AFS.pdf · uploaded 15 Mar 2023Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Prasad Garden Phase II Jun 2022 - Form 2.pdf · uploaded 27 Apr 2023Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Prasad Garden Phase II Sept 2022 - Form 2.pdf · uploaded 27 Apr 2023Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sai Prasad Garden Phase II Dec 2022 - Form 2.pdf · uploaded 27 Apr 2023Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Sai Prasad Garden Phase 2 as on March 2023.pdf · uploaded 27 Apr 2023Source
- 5 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on June 2022.pdf · uploaded 27 Apr 2023Source
- 6 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on September 2022.pdf · uploaded 27 Apr 2023Source
- 7 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on December 2022.pdf · uploaded 27 Apr 2023Source
- 8 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on March 2023.pdf · uploaded 27 Apr 2023Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Sai Prasad Garden Phase II as on June 2023.pdf · uploaded 18 Jul 2023Source
- 9 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on 30-06-2023.pdf · uploaded 18 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5- Sai Prasad Garden as on 2022-23.pdf · uploaded 28 Sep 2023Source
- 10 Certificates of CA (Form 3)Form 3- Sai Prasad Garden Phase 2 as on 30-09-2023.pdf · uploaded 21 Oct 2023Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2- Sai Prasad Garden Phase 2 as on 30-09-2023.pdf · uploaded 27 Oct 2023Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- SAI PRASAD GARDEN PHASE-2 as on 18-04-2023_compressed.pdf · uploaded 6 Nov 2023Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- SAI PRASAD GARDEN PHASE-2 as on 10-07-2023_compressed.pdf · uploaded 6 Nov 2023Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- SAI PRASAD GARDEN PHASE-2 as on 01-11-2023_compressed.pdf · uploaded 6 Nov 2023Source
- 2 Declaration in FORM BForm B.pdf · uploaded 30 Dec 2023Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_11zon.pdf · uploaded 30 Dec 2023Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 30 Dec 2023Source
- 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 30 Dec 2023Source
- 11 Certificates of CA (Form 3)Form 3_11zon.pdf · uploaded 30 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 18-19.pdf · uploaded 30 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 19-20.pdf · uploaded 30 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 20-21.pdf · uploaded 30 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 21-22.pdf · uploaded 30 Dec 2023Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 22-23_11zon.pdf · uploaded 30 Dec 2023Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Latest_11zon.pdf · uploaded 23 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A 19-20.pdf · uploaded 23 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A 20-21.pdf · uploaded 23 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 21-22.pdf · uploaded 23 Jan 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 22-23.pdf · uploaded 23 Jan 2024Source
- 1 Declaration about Commencement CertificateFormat D.pdf · uploaded 30 Jan 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A.pdf · uploaded 30 Jan 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 30 Jan 2024Source
- 2 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 30 Jan 2024Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Sai Prasad Garden Phase 2 as on Dec 2023.pdf · uploaded 20 Mar 2024Source
- 12 Certificates of CA (Form 3)Form 3 - Sai Prasad Garden Phase 2 as on Dec 2023.pdf · uploaded 20 Mar 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart OC - Sai Prasad Garden Phase 2.pdf · uploaded 20 Mar 2024Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Sai Prasad Garden Phase 2 as on March 2024.pdf · uploaded 30 May 2024Source
- 13 Certificates of CA (Form 3)Form 3 - Sai Prasad Garden Phase 2 as on March 2024.pdf · uploaded 30 May 2024Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOC - Sai Prasad Garden- Phase 2.pdf · uploaded 1 Jun 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)Form 4 - Sai Prasad Garden- Phase 2.pdf · uploaded 5 Jun 2024Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)8 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf · uploaded 16 Jul 2024Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 16 Jul 2024Source
- 14 Certificates of CA (Form 3)13 Certificates of CA (Form 3).pdf · uploaded 16 Jul 2024Source
Technical
- DocumentMYSCAN_20170714_0002-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- Documentmaster kayout.pdf · uploaded 31 Dec 2018Source
- DocumentMYSCAN_20170714_0001-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- DocumentMYSCAN_20170714_0002-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- DocumentMYSCAN_20170714_0003-ilovepdf-compressed.pdf · uploaded 31 Dec 2018Source
- DocumentBP_309_ACC FINAL DRAWINGS (stamp)_compressed_compressed (1)_compressed_11zon_11zon_11zon (1) (1).pdf · uploaded 3 Mar 2023Source
Technical (Architect)
- Document8 Certificates of Architect (Form 1)(Mandatory for only ongoing project).pdf · uploaded 16 Jul 2024Source
Technical (Engineer)
- Document13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 16 Jul 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Regulatory record
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
Land
In Nevali, Panvel taluka
Survey, CTS, gat or plot numbers
Boundaries
- North
- Sai Prasad Garden Phase 3
- South
- 9 M Dp Road Sai Prasad Phase 1
- East
- Adjoiing Survey No 4-5 12 5-5
- West
- Adjoining Survey 5-4 5-1 4-1
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Nirmaan Architects | — |
| Chartered accountant | Bhavin Gadhiya Associates | — |
| Chartered accountant | Rutuja Narsingh & Associates | — |
| Engineer | SK Consultants & Engineers | — |
| Engineer | Vastukalp | — |
| Other | RERA Easy | — |
| Other | Sky Enterprises | — |
| Registered real estate agent | Space India Builders & Developers | — |
Source: MahaRERA project page. Contact details are not shown.