Calista

Certificate Signed

Navi Mumbai Panvel Rigardh (Ct), Raigarh 410206 |Promoter: Bluescape Infra

5 Sep 2019Registered with MahaRERA
15 Nov 2026Promised completion
1Building
101Units registered89 booked (88%)
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Buildings
1
Unit types
1BHK, 2BHK, Shop101 units in all
Address
Plot No J-4 322, Pushpak New, Sector 3PIN 410206
Designated bank account
109
Developed in phases
No

Registered transactions

No registered transactions matched to this project yetSales, resales, rentals and mortgages appear here once registered documents are matched to this project by evidence.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 Nov 2026

Registered
5 Sep 2019
Promised
15 Nov 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P520000222105 Sep 201915 Nov 202615 Nov 2026Bluescape InfraProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Calista14101

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

89 of 101 units booked (88%), as the promoter reported to MahaRERA

1BHK · 41 units2BHK · 54 unitsShop · 6 units
TypeCarpet areaUnitsBooked
1BHK25.46 sq m · 274 sq ft1414
1BHK26.07 sq m · 281 sq ft1514
1BHK26.35 sq m · 284 sq ft1212
2BHK41.69 sq m · 449 sq ft1815
2BHK41.73 sq m · 449 sq ft1816
2BHK45.32 sq m · 488 sq ft1815
Shop100.61 sq m · 1,083 sq ft20
Shop102.31 sq m · 1,101 sq ft22
Shop102.31 sq m · 1,101 sq ft21

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Documents

2 documents held by Deedo, 141 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardCALISTA- PAN CARD.pdf · uploaded 6 Aug 2019Source
  • OthersFORMAT A.pdf · uploaded 26 Aug 2025Source
  • OthersFORMAT B.pdf · uploaded 26 Aug 2025Source

Legal

  • Legal Title reportCALISTA- TITLE REPORT.pdf · uploaded 2 Aug 2019Source
  • Declaration Form BCALISTA- FORM B.pdf · uploaded 23 Aug 2019Source

Migrated

  • 1 Copy of the legal title reportCALISTA- TITLE REPORT.pdf · uploaded 2 Aug 2019Source
Show all 143 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)CALISTA- LAYOUT COPY-1.pdf · uploaded 2 Aug 2019Source
  • 2 Copy of Layout Approval (in case of layout)CALISTA- LAYOUT COPY-2.pdf · uploaded 2 Aug 2019Source
  • 3 Copy of Layout Approval (in case of layout)CALISTA- LAYOUT COPY-3.pdf · uploaded 2 Aug 2019Source
  • 4 Copy of Layout Approval (in case of layout)CALISTA- LAYOUT COPY-4.pdf · uploaded 2 Aug 2019Source
  • 5 Copy of Layout Approval (in case of layout)CALISTA- LAYOUT COPY-5.pdf · uploaded 2 Aug 2019Source
  • 6 Copy of Layout Approval (in case of layout)CALISTA- LAYOUT COPY-6.pdf · uploaded 2 Aug 2019Source
  • 7 Copy of Layout Approval (in case of layout)CALISTA- LAYOUT COPY-7.pdf · uploaded 2 Aug 2019Source
  • 1 Building Plan Approval (IOD)CALISTA- BUILDING IOD.pdf · uploaded 2 Aug 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentCALISTA- CC COPY.pdf · uploaded 2 Aug 2019Source
  • 1 Proforma of Allotment letterCALISTA- DRAFT ALLOTMENT LETTER.pdf · uploaded 2 Aug 2019Source
  • 1 PAN CardCALISTA- PAN CARD.pdf · uploaded 6 Aug 2019Source
  • 1 Details of encumbrancesCALISTA- NO ENCUMBRANCE.pdf · uploaded 23 Aug 2019Source
  • 1 Declaration in FORM BCALISTA- FORM B.pdf · uploaded 23 Aug 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CALISTA- FORM 3.pdf · uploaded 26 Aug 2019Source
  • 2 Proforma of Allotment letterCALISTA- DRAFT SALE AGREEMENT.pdf · uploaded 26 Aug 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5.PDF · uploaded 5 Jan 2021Source
  • 1 Disclosure of sold/ booked inventoryinventory.pdf · uploaded 18 Jun 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5.PDF · uploaded 31 Dec 2021Source
  • 1 Declaration about Commencement CertificateDeclaration.pdf · uploaded 7 Jan 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 7 Jan 2022Source
  • 2 Disclosure of sold/ booked inventoryInventory Calista.pdf · uploaded 19 Jan 2022Source
  • 3 Disclosure of sold/ booked inventoryinventory letter.pdf · uploaded 19 Jan 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200235191334_For_Asset_Based_Search_15_04_2022_13_15_25_874.pdf · uploaded 15 Apr 2022Source
  • 4 Disclosure of sold/ booked inventoryinventory sold list March.pdf · uploaded 15 Apr 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 New.pdf · uploaded 10 Nov 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM-2.pdf · uploaded 9 Dec 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 9 Dec 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 2 New.pdf · uploaded 25 Jan 2023Source
  • 5 Disclosure of sold/ booked inventoryInventory sold.pdf · uploaded 30 Jan 2023Source
  • 2 a Details of encumbrances concerned to FinanceDeclaration of Legal.pdf · uploaded 8 Feb 2023Source
  • 1 b Details of encumbrances concerned to LegalDeclaration of Legal.pdf · uploaded 8 Feb 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 8 Feb 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samedeclartaion of separate bank.pdf · uploaded 8 Feb 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM-2A 22.pdf · uploaded 10 Feb 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 15 Apr 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 with Sign.pdf · uploaded 30 Sep 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 23 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form-2A.pdf · uploaded 23 Oct 2023Source
  • 6 Disclosure of sold/ booked inventoryInventory sold letter.pdf · uploaded 23 Oct 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 19 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2.pdf · uploaded 19 Jan 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 with sign.pdf · uploaded 20 Jan 2024Source
  • 7 Disclosure of sold/ booked inventoryinventory sold details.pdf · uploaded 9 Feb 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 10 Apr 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)final form 2.pdf · uploaded 10 Apr 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3_signed_11zon.pdf · uploaded 20 Apr 2024Source
  • 8 Disclosure of sold/ booked inventoryInventory Sold Letter-March 24.pdf · uploaded 1 Jun 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 9 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 9 Jul 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 with sign.pdf · uploaded 20 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_.pdf · uploaded 26 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 26 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 26 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Final FORM 1.pdf · uploaded 28 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3.pdf · uploaded 28 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 28 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Final FORM 1.pdf · uploaded 23 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final FORM 3.pdf · uploaded 23 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 23 Apr 2025Source
  • Form 5 (FY 2021-2022)Form 5 New.pdf · uploaded 24 May 2025Source
  • Form 5 (FY 2022-2023)Form 5 with Sign.pdf · uploaded 24 May 2025Source
  • Form 1Form 1.pdf · uploaded 18 Jun 2025Source
  • Form 1FORM 1_.pdf · uploaded 18 Jun 2025Source
  • Form 1Final FORM 1.pdf · uploaded 18 Jun 2025Source
  • Form 1Final FORM 1.pdf · uploaded 18 Jun 2025Source
  • Form 2Form 2.pdf · uploaded 18 Jun 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Jun 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Jun 2025Source
  • Form 2FORM 2.pdf · uploaded 18 Jun 2025Source
  • Form 3FORM 3 with sign.pdf · uploaded 18 Jun 2025Source
  • Form 3FORM 3.pdf · uploaded 18 Jun 2025Source
  • Form 3Final FORM 3.pdf · uploaded 18 Jun 2025Source
  • Form 3Final FORM 3.pdf · uploaded 18 Jun 2025Source
  • Disclosure of Sold and Booked Inventoryinvenotry sold june 24.pdf · uploaded 18 Jun 2025Source
  • Disclosure of Sold and Booked Inventoryinvenotry sold sep 24.pdf · uploaded 18 Jun 2025Source
  • Disclosure of Sold and Booked Inventoryinvenotry sold dec 24.pdf · uploaded 18 Jun 2025Source
  • Disclosure of Sold and Booked Inventoryinvenotry sold march 25.pdf · uploaded 18 Jun 2025Source
  • Form 2A (FY 2019-2020)FORM 2A (19-20).pdf · uploaded 24 Jun 2025Source
  • Form 2A (FY 2020-2021)FORM 2A (20-21).pdf · uploaded 24 Jun 2025Source
  • Form 2A (FY 2021-2022)FORM 2A (21-22).pdf · uploaded 24 Jun 2025Source
  • Form 2A (FY 2022-2023)FORM 2A (22-23).pdf · uploaded 24 Jun 2025Source
  • Form 2A (FY 2023-2024)FORM 2A (23-24).pdf · uploaded 24 Jun 2025Source
  • Form 2A (FY 2024-2025)FORM 2A (24-25).pdf · uploaded 24 Jun 2025Source
  • Withdrawal Update Form 1Final FORM 1.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 2Final FORM 2.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 3final FORM 3.pdf · uploaded 25 Jul 2025Source
  • Withdrawal Update Form 1Final FORM 1.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 2Final FORM 2.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 3final FORM 3.pdf · uploaded 28 Jul 2025Source
  • Withdrawal Update Form 1Final FORM 1.pdf · uploaded 19 Aug 2025Source
  • Withdrawal Update Form 2Final FORM 2.pdf · uploaded 19 Aug 2025Source
  • Withdrawal Update Form 3final FORM 3.pdf · uploaded 19 Aug 2025Source
  • Withdrawal Update Form 1FORM1 Q2 25-26.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 2FORM2 Q2 25-26.pdf · uploaded 3 Dec 2025Source
  • Withdrawal Update Form 3FORM3 25-26.pdf · uploaded 3 Dec 2025Source
  • Form 1FORM 1.pdf · uploaded 12 Dec 2025Source
  • Form 1FORM 1.pdf · uploaded 12 Dec 2025Source
  • Form 2Form-2.pdf · uploaded 12 Dec 2025Source
  • Form 2Form-2.pdf · uploaded 12 Dec 2025Source
  • Form 3Form 3 with sign.pdf · uploaded 12 Dec 2025Source
  • Form 3Form 3 final.pdf · uploaded 12 Dec 2025Source
  • Disclosure of Sold and Booked Inventoryinventory sold details.pdf · uploaded 12 Dec 2025Source
  • Disclosure of Sold and Booked Inventoryinventory sold details.pdf · uploaded 12 Dec 2025Source
  • Form 5 (FY 2023-2024)Bluescape infra FY 23-24.pdf · uploaded 19 Dec 2025Source
  • Form 5 (FY 2024-2025)Bluescape infra FY 24-25.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 1Form 1 - March 2026.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Form 1 - March 2026.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - March 2026.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 2Form 2 - March 2026.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - May 2026.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 3Form 3 - May 2026.pdf · uploaded 9 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A - 2025-26.pdf · uploaded 9 Jul 2026Source
  • Withdrawal Update Form 1Form 1 - March 2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 2Form 2 - March 2026.pdf · uploaded 17 Aug 2026Source
  • Withdrawal Update Form 3Form 3 - May 2026.pdf · uploaded 17 Aug 2026Source

Technical

  • DocumentCALISTA- LAYOUT COPY-1.pdf · uploaded 2 Aug 2019Source
  • DocumentCALISTA- LAYOUT COPY-2.pdf · uploaded 2 Aug 2019Source
  • DocumentCALISTA- LAYOUT COPY-3.pdf · uploaded 2 Aug 2019Source
  • DocumentCALISTA- LAYOUT COPY-4.pdf · uploaded 2 Aug 2019Source
  • DocumentCALISTA- LAYOUT COPY-5.pdf · uploaded 2 Aug 2019Source
  • DocumentCALISTA- LAYOUT COPY-6.pdf · uploaded 2 Aug 2019Source
  • DocumentCALISTA- LAYOUT COPY-7.pdf · uploaded 2 Aug 2019Source
  • DocumentCALISTA- BUILDING IOD.pdf · uploaded 2 Aug 2019Source
  • DocumentOC Plan 1_highlighted.pdf · uploaded 24 Jul 2026Source
  • DocumentOC Plan 2_highlighted.pdf · uploaded 24 Jul 2026Source
  • DocumentOC Plan 3_highlighted.pdf · uploaded 24 Jul 2026Source
  • DocumentOC Plan 4.pdf · uploaded 24 Jul 2026Source

Technical (Architect)

  • DocumentFORM 1_.pdf · uploaded 26 Oct 2024Source
  • DocumentFinal FORM 1.pdf · uploaded 28 Jan 2025Source
  • DocumentFinal FORM 1.pdf · uploaded 23 Apr 2025Source
  • DocumentForm 1 - March 2026.pdf · uploaded 17 Aug 2026Source

Technical (Engineer)

  • DocumentFORM 2.pdf · uploaded 26 Oct 2024Source
  • DocumentFORM 2.pdf · uploaded 28 Jan 2025Source
  • DocumentFORM 2.pdf · uploaded 23 Apr 2025Source
  • DocumentForm 2 - March 2026.pdf · uploaded 17 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Navi Mumbai Panvel Rigardh (CT), Panvel taluka

Survey, CTS, gat or plot numbers

PLOT NO J-4 322

Boundaries

North
Plot No J-3 323
South
Plot No J-5 321
East
18 Mtr Wide Road
West
Plot No F6 And F7

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAtul Patel—
Chartered accountantCa Jyoti Gajra—
EngineerDhanaji Bhimarav Chavan—
EngineerPushpendra Vishwakarma—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology